September 21, 2015 · Systems
Comfort Inn Conversion BES PIP Takeoff: Ohio
Four-page Brand Entry Standards (BES) conversion Property Improvement Plan for reflagging a former Hampton property into a Comfort Inn in Ohio.
Hospitality was the classroom. Renovations ran on site while the furniture crossed an ocean in containers, and the same projects were worked from either chair: general contractor in-house, or project manager above one. These notes are those projects, one at a time: PIP scopes, FF&E packages, takeoffs, permit sets and acquisitions.
September 21, 2015 · Systems
Four-page Brand Entry Standards (BES) conversion Property Improvement Plan for reflagging a former Hampton property into a Comfort Inn in Ohio.
September 10, 2015 · Materials
How isolating 85 vanity assemblies and ordering a three-piece sample surround kit protected schedule certainty against a 90-day post-approval shipping window.
September 9, 2015 · Materials
Structuring a 102-room select-service casegoods package across 45 King and 57 Queen layouts with direct container sourcing and a 14% freight load.
September 7, 2015 · Materials
Separating field-verified flooring estimates from factory-ordered casegoods and lighting across a 51-key Super 8 renovation in Central Iowa keeps procurement schedules tight.
July 23, 2015 · Materials
Direct-sourcing a 100-fixture Gatsby guestroom wall sconce and table lamp replenishment order for an Americas Best Value Inn in South Carolina.
July 21, 2015 · Construction
Coordinating a 94,556-square-foot, four-story Staybridge Suites Prototype 6.0 build across 135 extended-stay units and full multi-discipline construction sheets in West Houston TX.
June 16, 2015 · Underwriting
A 90-page preliminary four-story architectural, site, structural, and MEP plan set issued specifically for early construction budget estimating in West Houston TX.
June 3, 2015 · Systems
How aligning a 76-room South Texas bid sheet across seven room types with floor-by-floor carpet models and direct-factory vinyl schedules eliminated mid-build shortages.
June 1, 2015 · Materials
Separating architectural finish allowances from custom public-area seating, fabric yardages, casegoods, and statement lighting on a Wingate by Wyndham lobby package.
May 29, 2015 · Materials
Executing full 72-key guestroom casegoods, task seating, lighting fixtures, window shades, and outdoor patio furniture buyouts for a Holiday Inn Express build in Central Texas.
May 27, 2015 · Construction
Iterating through eleven guestroom CAD schemes and combining direct factory casegoods with regional quartz countertops on a 130-key Staybridge Suites renovation in Greater DFW.
May 19, 2015 · Materials
Engineering 79 suites of frameless Shaker kitchenettes, wet-bar bases, ADA vanities, and quartz tops into three 40-foot high-cube containers for a Staybridge Suites in Austin.
May 15, 2015 · Materials
Delivering design intent submittals, corridor wallcoverings, public-area finishes, and 140 guestroom seating units for a 70-key North Houston Holiday Inn Express.
May 5, 2015 · Materials
Truly Yours FF&E supply and formal Choice Hotels CAD submittal package for a 57-key Comfort Suites airport-corridor renovation in North Houston TX.
May 1, 2015 · Materials
Low-six-figure guestroom vanity, sleeper, drapery, and carpet takeoff for a 65-key Comfort Suites airport-north renovation in San Antonio.
May 1, 2015 · Materials
Pairing a guestroom design concept perspective board with a full 153-key Best Western conversion FF&E schedule across bedding, casegoods, seating, vanities, and public areas in New York.
April 20, 2015 · Materials
Under-$100,000 Days Inn Sunset scheme FF&E supply and general contractor quote for a 28-key property in Louisiana.
April 17, 2015 · Underwriting
Itemizing a 56-key eight-room-type Hampton Inn FF&E, public space, pool, and bath-finish procurement workbook in Central Texas.
April 2, 2015 · Lessons
Catching a double-queen headboard multiplier error before overseas factory release on a North Houston Country Inn & Suites project.
March 23, 2015 · Construction
Reconciling a 62-page multi-discipline bid binder, life-safety egress paths, and 11 suite types across 74,315 square feet for a 90-key Staybridge Suites in Ohio.
March 23, 2015 · Construction
Aligning 84 extended-stay keys across eight ADA and standard suite configurations with Staybridge Suites Spice casegoods and permit MEP sets in West DFW.
March 23, 2015 · Lessons
Combining Certificate of Origin logistics, 5,950 linear feet of wall base, and COM fabric tracking across a mid-six-figure West Texas select-service renovation.
March 17, 2015 · Materials
Coordinating a 94-page FF&E specification submittal book and color-coded five-zone first-floor carpet layout across a 115-room West Houston Best Western Plus conversion.
March 10, 2015 · Materials
Quantifying casegoods, seating, lighting, carpet, and tile schedules across six unit types for a 64-key La Quinta in Alabama.