August 14, 2018 · Underwriting
Sleep Inn 70-Key Guestroom FF&E Renovation Package: North DFW
Breaking down every casegood, closet, seating, and vanity SKU across 30 Kings, 28 Double Queens, and 12 Suites for a complete 70-key North DFW renovation.
Hospitality was the classroom. Renovations ran on site while the furniture crossed an ocean in containers, and the same projects were worked from either chair: general contractor in-house, or project manager above one. These notes are those projects, one at a time: PIP scopes, FF&E packages, takeoffs, permit sets and acquisitions.
August 14, 2018 · Underwriting
Breaking down every casegood, closet, seating, and vanity SKU across 30 Kings, 28 Double Queens, and 12 Suites for a complete 70-key North DFW renovation.
August 14, 2018 · Underwriting
Walking Denton Creek Inn floor by floor in North DFW to verify all 79 keys, six room layouts, and 38,455 gross square feet against structural prints before pricing the deal.
April 2, 2018 · Underwriting
How pre-built building-material and FF&E templates turned 2018 AAHOA convention floor leads into complete architectural takeoffs across North DFW and Central Texas hotels.
February 28, 2018 · Underwriting
How digital floorplan takeoffs across nine guestroom subtypes and direct factory terms structured a seven-figure FF&E budget with 50-to-60-day ocean transit discipline.
January 18, 2018 · Underwriting
Cataloging 35 damaged coastal guestrooms room by room at Americas Best Value Inn in the Texas Coastal Bend across nine unit layouts to support windstorm claim replacement.
November 21, 2017 · Underwriting
Auditing chrome chair bases, brushed metal desk collars, and upholstery humidity wear across a waterfront Holiday Inn on the Texas Gulf Coast.
February 1, 2017 · Underwriting
How a 93-room Central Texas new-build split into nine distinct floorplan types, requiring tight alignment between CAD layouts, lounge seating, and bedding pack counts.
November 2, 2015 · Underwriting
Structuring a 224-key Crowne Plaza acquisition PIP spanning a 10-story tower, exterior corridor wing, 4,906 sq ft of meeting space, and full guestroom upgrades in Central Texas.
June 16, 2015 · Underwriting
A 90-page preliminary four-story architectural, site, structural, and MEP plan set issued specifically for early construction budget estimating in West Houston TX.
April 17, 2015 · Underwriting
Itemizing a 56-key eight-room-type Hampton Inn FF&E, public space, pool, and bath-finish procurement workbook in Central Texas.
December 1, 2014 · Underwriting
Translating a 10-page Hilton Property Improvement Plan across an 80-key, three-story Hampton Inn in Southern Illinois into an itemized bid benchmark.
August 25, 2014 · Underwriting
Breaking down a low-six-figure partial FF&E renovation budget across ten guestroom configurations and three iterative AutoCAD lobby layouts.
May 1, 2014 · Underwriting
Turning a five-story, 83-key Hilton Garden Inn Final PIP into an actionable interior, Pavilion Pantry, pool, and Project Grow procurement takeoff in Central Florida.
July 16, 2013 · Underwriting
Physical plant, capital expenditure, and flag-conversion due diligence on a 238-key 11-story full-service Holiday Inn near Texas Medical Center in Houston.
May 15, 2013 · Underwriting
Auditing three-story breezeways, vintage CRT dressers, PTAC units, and bath surrounds across 47 property inspection photos in the Greater DFW corridor.
October 5, 2012 · Underwriting
Auditing exterior steel stairs, site drainage, PTAC sleeves, and casegoods wear on a foreclosed Red Carpet Inn along Central Texas's I-10 corridor.
March 24, 2011 · Underwriting
Underwriting physical plant conditions, commercial lease structures, and roadside transit traffic for an independent highway motel along the US-59 corridor in Southeast Texas.
December 13, 2010 · Underwriting
Structuring an asset acquisition, franchise conversion capex ratio, and 328-page capital markets due-diligence package in Greater DFW.
October 15, 2010 · Underwriting
Underwriting full-service hotel physical plants, IHG franchise property improvement plans, and coastal building envelope remediation along the Texas Gulf Coast corridor.
September 28, 2010 · Underwriting
Underwriting physical plant systems, Wyndham franchise PIP liabilities, and capital replacement reserves for a Days Inn along the Interstate 10 corridor in Central Texas.
August 26, 2010 · Underwriting
Reconciling two contiguous Fulton County tax parcels, 120,956 square feet under roof, and prior institutional transfers during acquisition due diligence on an Atlanta airport hotel.
August 16, 2010 · Underwriting
Underwriting physical plant conditions, Choice Hotels PIP requirements, and historical STR RevPAR performance for a Comfort Inn along the US-290 corridor in Northwest Houston.
November 19, 2009 · Underwriting
Evaluating physical plant conditions, structural exterior corridor concrete walkways, commercial swimming pool filtration systems, and central MEP plant infrastructure for the 150-room Florida Suites property along the Central Florida tourism corridor.
August 10, 2009 · Underwriting
Underwriting an operating Passport Inn & Suites along a Central Texas highway corridor by auditing county property tax appraisals, utility ratios, and physical plant condition.