← All Services  ·  02 · Pre-Acquisition Due Diligence

Site Feasibility & Due Diligence

Pre-acquisition underwriting, rehab and construction budget reality checks, and entitlement due diligence before you wire earnest money.

Part of the operation: Underwriting →

Pre-Acquisition Reality Check

Independent audit of a seller's pro-forma, rent assumptions, and hidden deferred maintenance before your option period expires.

Utilities, Detention & Access

Verifying water/sewer capacity, MUD annexation, drainage requirements, and TxDOT or county curb-cut feasibility.

Rehab & Hard-Cost Audit

Line-item review of contractor bids and cap-ex budgets using real direct-import material and local trade pricing.

Exit Underwriting

Stress-testing the exit cap rate, refinance debt-service coverage, or terminal resale value at acquisition.

What this covers

Feasibility is supposed to say no when the numbers lie. Whether you are an out-of-state investor looking at a Houston-area parcel, a syndicator under contract on a value-add commercial building, or an owner-occupant buying raw land in Montgomery, Waller, or Fort Bend County, I run the physical and financial due diligence during your option period.

I walk the site, pull the municipal or county engineering records, check floodway and detention ratios, review existing contractor estimates, and hand you an unvarnished underwriting memo detailing where the risks sit.

Why hire an operator

Traditional brokers only get paid when a transaction closes, giving them a built-in incentive to gloss over entitlement delays, soil stabilization costs, and optimistic lease-up timelines. On a standalone feasibility engagement, my only job is to protect your capital and tell you what the dirt and the building will actually cost to execute.

Turnaround & pricing

Baseline starting fees. Final scope is quoted upfront as a flat fee based on square footage, unit count, or tract complexity before work begins.

Pro-Forma & Cap-Ex Desk Audit Remote underwriting review of a seller's financials, rent assumptions, and rehab budget (2 to 3 business days)

Includes: Line-item stress test of seller T-12 / rent roll, reality check on operating expenses and property tax reassessment, review of existing contractor bids, and written risk summary. (No site travel.)

Starting at $950
Commercial Building On-Site Audit Physical property walkthrough and pre-acquisition due diligence during your option period (3 to 5 business days)

Includes: On-site inspection of roof, envelope, MEP systems, and parking/paving; independent cap-ex and deferred maintenance budget; and a go / no-go acquisition underwriting memo.

Starting at $1,750
Adaptive Reuse & Building Conversion Feasibility Feasibility audit for converting retail, warehouse, office, or motel assets into a new commercial use (4 to 6 business days)

Includes: On-site walk of structural shell and MEP capacity, municipal occupancy-change trigger check (fire suppression, grease traps, ADA, parking ratios), and preliminary conversion budget using real trade numbers. (Pairs with Turnkey Commercial Build-Out & Build-to-Suit Execution →)

Starting at $2,500
Raw Land On-Site Feasibility Physical site walk and development constraint check before earnest money goes hard (4 to 6 business days)

Includes: Site walk, municipal/MUD water and wastewater capacity check, preliminary detention and floodplain ratio review, TxDOT/county curb-cut check, and net buildable pad yield estimate. (Pairs with Land Entitlement & Civil Management →)

Starting at $2,500
Hospitality & Large-Asset Due Diligence Comprehensive physical plant and financial underwriting audit for hotels and multi-building commercial assets

Includes: Multi-room and back-of-house physical inspection, brand PIP line-item cost modeling at direct-import vs. retail rates, historical P&L / STR stress test, and exit cap-rate underwriting. (Pairs with Large Asset & Hospitality BOV →)

Starting at $5,000

Need à la carte or a combined scope?

Every capability in this operation is modular. If you only need one specific piece (for example, just custom shop drawings, a single site-walk draw check, or a valuation paired with a contractor bid audit), you do not have to buy a full package. Tell me which pieces you need and I will quote a flat fee for just that scope.

Track record & case studies

Recent Underwriting entries

Real audits, takeoffs, and field notes from this discipline. View all in Underwriting →

02 · Site Feasibility & Due Diligence

Ready to scope this for your property or project?

Start with who you are, the property address, and which scope tier or à la carte deliverable you need. Once you confirm your email, your request delivers directly to Boris.