February 26, 2018 · Materials
Synchronizing 54 pre-cut White Quartz countertop sets, stainless and porcelain sinks, and knocked-down birch shaker cabinetry with architectural blueprints for a Central Texas residential build.
July 25, 2017 · Land
Scaling Peninsula Apartments across four residential building plans on the South Texas Coast from site utility and 3D unit models into container-level kitchen and bath packages.
May 31, 2016 · Construction
Reconciling revised architectural, structural, MEP, civil, and fire-code permit sheets against original as-built drawings for a 14,308-square-foot multifamily rebuild in North Houston TX.
September 9, 2015 · Materials
Sourcing and installing a matched three-piece GE stainless steel kitchen appliance package under a single direct order for a residential renovation in Houston, Texas.
July 27, 2015 · Materials
Procuring and scheduling direct wholesale delivery of two custom frameless glass shower enclosures for a residential bath build in Fort Bend County, Texas.
June 15, 2010 · Land
Assembling contiguous urban parcels, navigating deed restrictions, and underwriting high-density residential redevelopment for the McCue Apartments site in the Galleria area.
May 14, 2010 · Underwriting
Underwriting physical plant conditions, exterior breezeways, and capital expenditure reserves for a multi-family residential apartment community along a San Antonio transit corridor.
October 6, 2009 · Underwriting
Coordinating lender pre-approval conditions, 20-day title commitments, and TREC financing contingency deadlines on a Houston brokerage transaction.
July 23, 2008 · Underwriting
Underwriting physical plant conditions, central domestic boilers, and property tax valuation forensics for the 180-unit Whispering Oaks Apartments community in Southwest Houston.
May 15, 2008 · Underwriting
Conducting civil engineering due diligence, geotechnical expansive clay analysis, and MUD utility capacity underwriting for a 9.45-acre townhome tract in the Southwest Houston corridor.
January 24, 2008 · Underwriting
Underwriting a lender-owned 93-unit senior living acquisition on 4.4 acres along the Texas Gulf Coast, separating stabilized 83% occupancy from negative lender-run cash flow and 10 floor-plan rate tiers.