April 20, 2015  ·  1 min read  ·  Materials

Days Inn 28-Key Sunset Scheme FF&E & Renovation Quote: Louisiana

Under-$100,000 Days Inn Sunset scheme FF&E supply and general contractor quote for a 28-key property in Louisiana.

Days Inn 28-Key Sunset Scheme FF&E & Renovation Quote: Louisiana

Smaller roadside hospitality assets need lean, transparent FF&E quotes where casegoods details and GC installation allowances sit side by side without bloated markups. This Louisiana Days Inn package priced an under-$100,000 Sunset scheme upgrade tailored to a compact 28-key footprint split evenly between 14 king suites and 14 double-queen suites.

Guestroom casegoods were specified for durability and compact room circulation: king and queen headboards, 24-inch nightstands with protective toe kicks and metal leg caps, 36-inch-wide drawer media chests with 12-inch pulls, 48-by-24-inch desks, coffee tables, and 30-by-30 activity tables. Lighting and bath updates included bedside USB-and-outlet wall units, chest mirrors, vanity sconces, and stone vanity tops with integral backsplashes and sinks.

Pairing the preliminary FF&E supply quote with a companion general contracting scope kept carpet and tile variance clearly flagged so final field measurements locked before deposits released.

More Days Inn projects

View all 6 Days Inn projects →