The operation

Materials

Importing as one trade: furniture, stone, tile, cabinets. And the installer network that both buys from the operation and builds for it.

Entries

November 5, 2026

Home2 Suites PIP Cincinnati Ohio

An extended-stay PIP is fundamentally different from a standard select-service renovation. If you treat the brand's preferred-vendor list as mandatory, you are paying someone else's distributor markup.

November 3, 2026

Hampton Inn PIP Cincinnati Ohio

When a hotel brand issues a PIP, they steer you straight into preferred-vendor catalogs with massive distributor markups. The way around the catalog tax is knowing how brand review actually works.