Hotel lobbies create disproportionate procurement headaches because almost every item is either a one-off custom build or a split COM upholstery order. On this Wingate by Wyndham public-area package, finishes, custom casegoods, multi-fabric seating, artwork, and statement lighting were broken out cleanly for factory execution.
Separating public-space design, space planning, and submittal approvals from material line items gave ownership clear visibility across every custom fixture before production began.
Public-Area Takeoff Highlights
- Carpet and wallcoverings: Scheduled 24 square yards of custom lobby area rug paired with 26 linear yards of reception desk and bar wallcoverings.
- Custom casegoods and statement lighting: Specified C-tables, side tables, a coffee table, five dining table tops with bases, a custom breakfast sideboard, a custom lobby chandelier, and a community table pendant.
- Split-yardage upholstery program: Engineered a custom 15-foot by 4-foot double-sided sofa sectional (35 yards fabric plus 8 accent pillows) alongside entryway lounge chairs, foyer loveseats, barrel chairs, 10 dining chairs, 8 bar stools, and business ergonomic seating with dedicated back, seat, and accent yardages.
Accounting for every yard of COM fabric and every custom millwork dimension upfront ensured lobby pieces arrived ready for installation on a single dedicated freight schedule.