← All Services  ·  01 · Broker Price Opinions & Commercial BOVs

Property Valuations & BPOs

Ground-truth residential BPOs, commercial BOVs, and land valuations across a 60-mile Houston radius, underwritten by a Texas broker who actually builds.

Part of the operation: Underwriting →

Lending & ARV

Fast exterior and interior condition reports, realistic rehab cost verification, and As-Is vs. ARV underwriting for bridge and hard-money lenders.

Legal, Probate & Estate

Defensible date-of-death, probate, and marital asset division valuations without the 4-week wait or $3,000 fee of an MAI appraisal.

Tax Protest (CAD)

Documented market comp and condition evidence packages to contest inflated county Appraisal District assessments.

Commercial & Land BOV

Cap-rate, NOI, lease-comp, and replacement-cost opinions for retail, small-bay industrial, hospitality, and raw acreage.

What this covers

Algorithms and automated valuation models miss the reality on the ground. They do not see unpermitted additions, flood-plain splits, localized foundation settlement, or the difference between paper zoning and physical utility. I provide standalone Broker Price Opinions (BPOs) for residential properties and Broker Opinions of Value (BOVs) for commercial assets and raw land across Greater Houston and surrounding counties, from downtown out 60 miles to Wharton, Waller, Hempstead, The Woodlands, Conroe, Montgomery, Galveston, and Baytown.

Every valuation includes verified comparable sales, County Appraisal District (CAD) record reconciliation, and (for field assignments) time-stamped exterior and interior photography.

Why hire an operator

Most brokers guessing at commercial value or rehab budgets have never bought stone, poured concrete, or carried a construction loan. Because I operate an active construction, materials importing, and land development business alongside a Texas real estate broker license, my repair adjustments and replacement-cost numbers come from lived invoices, not software averages.

Turnaround & pricing

Baseline starting fees. Final scope is quoted upfront as a flat fee based on square footage, unit count, or tract complexity before work begins.

Residential Drive-By BPO Exterior field inspection and market valuation across a 60-mile Houston radius (24 to 48 hr turnaround)

Includes: Time-stamped exterior and street-scene photos, 3 active and 3 sold MLS/CAD comparable adjustments, neighborhood trend check, and signed As-Is / 30-Day Quick-Sale value opinion.

Starting at $250
Residential Full Interior BPO Room-by-room walkthrough and rehab verification for lenders, estates, or investors (48 to 72 hr turnaround)

Includes: Full interior/exterior photo log, room-by-room condition grading, line-item repair cost estimate using real contractor numbers, and As-Is vs. After-Repair Value (ARV) comp grid.

Starting at $450
Small-Bay Commercial & Retail BOV Commercial Broker Opinion of Value for retail, office, industrial, and flex assets (3 to 5 business days)

Includes: On-site property inspection, County Appraisal District (CAD) record audit, market rent and NNN lease comp analysis, stabilized NOI cap-rate model, and replacement-cost check. (Pairs with Commercial Property Sale Listing →)

Starting at $1,250
Land & Acreage Valuation Opinion Raw land, commercial pad sites, and transitional acreage valuation (3 to 5 business days)

Includes: Floodplain/topography overlay review, utility corridor and road-frontage check, highest-and-best-use analysis, and adjusted price-per-acre / price-per-sq-ft land sales comps.

Starting at $1,500
Large Asset & Hospitality BOV Hotels, motels, multi-tenant shopping centers, and large industrial parks

Includes: On-site physical plant walk, multi-tenant rent roll or hospitality STR/RevPAR performance audit, deferred maintenance / PIP deduction estimate, and income + sales-comparison valuation. (Pairs with Hospitality & Large-Asset Due Diligence →)

Starting at $3,500
Institutional / AMC Portal Orders Recurring corridor routes across Harris, Fort Bend, Montgomery, Waller, Wharton, Galveston & Chambers counties

Includes: Direct upload to lender or asset-manager portal format, strict SLA turnaround compliance, and custom photo/comp addenda.

Per Portal SLA

Need à la carte or a combined scope?

Every capability in this operation is modular. If you only need one specific piece (for example, just custom shop drawings, a single site-walk draw check, or a valuation paired with a contractor bid audit), you do not have to buy a full package. Tell me which pieces you need and I will quote a flat fee for just that scope.

Track record & case studies

Recent Underwriting entries

Real audits, takeoffs, and field notes from this discipline. View all in Underwriting →

01 · Property Valuations & BPOs

Ready to scope this for your property or project?

Start with who you are, the property address, and which scope tier or à la carte deliverable you need. Once you confirm your email, your request delivers directly to Boris.