March 9, 2018 · Materials
Directing the architectural millwork, acoustic engineering, and material specifications for the Gujarati Samaj Houston Event Center and multi-story grand ballroom.
August 22, 2011 · Construction
Directing commercial adaptive-reuse construction, grand ballroom acoustic engineering, and high-occupancy life safety fit-outs for an event venue in Houston.
June 20, 2011 · Underwriting
Conducting structural engineering assessments, heavy power audits, and robotic cell utility due diligence for an industrial precision machine shop facility in Houston.
May 24, 2011 · Underwriting
Conducting structural engineering assessments, clear-span steel frame audits, and heavy power evaluations for an industrial distribution warehouse in Houston.
April 18, 2011 · Construction
Directing structural steel frame repairs, industrial masonry envelope restoration, and unit-cost capital expenditure budgeting for an industrial facility in urban Houston.
April 6, 2010 · Construction
Sequencing an under-$100,000 roof deck tear-off, canopy rebuild, ceiling sheetrock repair, and full interior repaint on a commercial warehouse in Inner-Loop East Houston.
June 18, 2009 · Construction
Directing heavy industrial concrete pavement diagnostics, masonry load-bearing envelope restoration, structural steel column repairs, and unit-cost capital audits for an industrial distribution facility in urban Houston.
March 12, 2009 · Systems
Auditing high-capacity 480V three-phase electrical distribution, foundation vibration isolation, and overhead crane clearances for the F & C Tool Grinding CNC machining facility.
October 15, 2008 · Construction
Full tear-off and four-ply built-up roof replacement bid for a 44,500-square-foot commercial facility, separating structural deck contingencies from a five-week installation and draw schedule.
June 12, 2008 · Underwriting
Auditing high-bay clear heights, structural slab floor load capacities, and commercial loading dock logistics for a hospitality furniture distribution facility in the Southwest Houston corridor.
January 28, 2008 · Systems
Auditing architectural and MEP engineering specifications for Westland Bunker, a 40,000 square foot hardened underground data center fifty feet subterranean in Southeast Texas.
August 20, 2007 · Construction
Converting an industrial warehouse into the AIM Limousine Services fleet maintenance facility, dispatch center, and secure vehicle staging yard.