July 21, 2015  ·  1 min read  ·  Construction

Staybridge Suites 135-Key Prototype 6.0 Construction Package: West Houston

Coordinating a 94,556-square-foot, four-story Staybridge Suites Prototype 6.0 build across 135 extended-stay units and full multi-discipline construction sheets in West Houston TX.

Staybridge Suites 135-Key Prototype 6.0 Construction Package: West Houston

A 135-key extended-stay hotel carries enough mechanical, structural, and finish density that a missed coordination detail on paper turns into weeks of rework in the field. On this four-story Staybridge Suites Prototype 6.0 project in West Houston TX, the full construction drawing library and FF&E pricing takeoff were aligned across 94,556 gross square feet.

The ground floor covered 24,102 square feet of lobby, breakfast, laundry, and back-of-house space, while the upper three guestroom levels carried 70,454 square feet under Type V-A fully sprinklered wood framing with structural steel columns and beams.

Multi-Discipline Scope Under One Takeoff

  • Envelope and Structure: Exterior elevations paired brick and simulated dry-stack stone across a 56-foot-4-inch four-story frame engineered for a 779-person total occupant load and nine exit routes.
  • Discipline Integration: General, civil, structural, 56 architectural sheets, plumbing, mechanical, electrical, and life-safety plans were reviewed together so guestroom chases and draft stops stayed clean.
  • Direct Pricing Alignment: Suite and public-area quantities were rolled straight from the architectural binder into a unified FF&E pricing schedule.

Reading structural, MEP, and architectural sheets side by side before procurement kept the Prototype 6.0 build schedule on one set of counts from slab to roof.

More in Construction

Related field notes & case studies

More real numbers, takeoffs, and post-mortems from the operation. View all entries →