October 28, 2026 · Construction
A general contractor will quote a hotel renovation by square-foot averages. That is a guarantee of future change orders. Real cost control requires forensic plan takeoffs before a contract is signed.
October 21, 2026 · Construction
When a commercial gut renovation combines a convenience store expansion, underground utility coordination, and a quick-service kitchen conversion, scope control is won in preconstruction.
October 14, 2026 · Construction
Food-service tenant build-outs inside existing commercial retail centers fail or bleed cash when architectural and MEP engineering are treated as afterthoughts.
November 21, 2017 · Construction
Comparing untouched upper-floor suites side by side against seven full-gut ground rooms inside a North Houston Holiday Inn ahead of renovation pricing.
May 31, 2017 · Construction
Translating archival TIFF floorplans into a coordinated 97-key guestroom and lounge package inside a mid-six-figure North Houston soft-brand conversion.
May 8, 2017 · Construction
Bridging a 140-sheet four-story construction set and a turnkey Formula Blue FF&E and quartz quotation for an 82-room Fort Bend County Holiday Inn Express.
March 3, 2017 · Construction
Coordinating a 187-page Issued-for-Construction plan set, 15-page fire-code approvals, and a seven-figure FF&E delivery for an 86-room North Houston hotel.
December 27, 2016 · Construction
Coordinating a 98-key Hampton Inn & Suites Forever Young V2 guestroom and public-space renovation across architectural plans, finish specs, and vendor quotes in North Houston TX.
October 17, 2016 · Construction
Mapping 103 extended-stay guestrooms, county-approved civil plans, MEP risers, and opening operating supplies across 79,105 square feet in East Houston TX.
July 25, 2016 · Construction
Uniting a 92-page IFB set, county fire & civil stamps, 67-page submittals, and custom vanity hardware QC across a 96-key East Houston hotel build.
May 31, 2016 · Construction
Reconciling revised architectural, structural, MEP, civil, and fire-code permit sheets against original as-built drawings for a 14,308-square-foot multifamily rebuild in North Houston TX.
May 30, 2016 · Construction
Engineering a 99-key, 58,105-square-foot four-story La Quinta Del Sol hotel with an indoor pool and permitting revisions in West Houston, Texas.
January 27, 2016 · Construction
Restoring a vehicle-damaged porte-cochere lobby roof and executing a full exterior framing, roofing, siding, and drainage overhaul in Fort Bend County, Texas.
January 22, 2016 · Construction
Multi-phase BES Property Improvement Plan, construction proposal, and 96-key Formula Blue FF&E conversion bid for an airport-area Comfort Suites in North Houston TX.
October 23, 2015 · Construction
Coordinating a 105,766-square-foot, six-story Holiday Inn Express build over a concrete basement parking podium through West Houston city and fire permit review.
July 21, 2015 · Construction
Coordinating a 94,556-square-foot, four-story Staybridge Suites Prototype 6.0 build across 135 extended-stay units and full multi-discipline construction sheets in West Houston TX.
February 20, 2015 · Construction
Detailing a 21-sheet structural permit set with 4.5-ksf drilled piers, GB1 through GB4 grade beams, wood-shrinkage tolerances, and IBC special inspections along US-290 in Northwest Houston.
February 9, 2015 · Construction
Full multi-discipline civil, structural, MEP, and 52-sheet architectural plan set paired with a mid-six-figure 68-key FF&E schedule in Southeast Houston.
January 14, 2015 · Construction
Coordinating 121 architectural, structural, civil, and MEP plan sheets with over 1,000 pages of Hilton Garden Inn brand finish, kitchen, and public-space specs for a 125-key East Houston TX hotel.
June 22, 2014 · Construction
Inspecting assembled hutch desks, kitchen cabinetry, and quartz fabrications on the factory floor against 250+ pages of shop drawings prevents costly field delays in West Houston.
May 12, 2014 · Construction
58-sheet architectural construction set and detailed 71-key FF&E and bath finish bid for a Country Inn & Suites build in West Houston.
April 14, 2014 · Construction
Coordinating architectural floor plans, prep kitchen equipment, buffet millwork elevations, and plumbing rough-ins across a four-story, 94-key Staybridge Suites in North Houston TX.
November 18, 2013 · Construction
Coordinating a 45-sheet multi-discipline architectural, civil, structural, MEP, and landscape construction set for a 72-key Holiday Inn Express in North Houston TX.
April 2, 2013 · Construction
Pairing two-phase NextGen II PIP mandates with architectural room layouts and direct FF&E procurement across 122 guestrooms for a Red Roof Inn in West Houston.