Aligning a 58-sheet architectural construction set with item-level FF&E and bath finish schedules keeps field rough-ins and material takeoffs from drifting apart mid-build. For this 71-key Country Inn & Suites project in West Houston, full architectural, structural, mechanical, and plumbing drawings anchored a room-by-room procurement bid covering six distinct suite types.
The 71-key schedule covered 14 double-queen rooms, 1 ADA double-queen room, 30 king rooms, 3 ADA king rooms, 22 king suites, and 1 ADA king suite. Floor and bath quantities were calculated directly against each room footprint: 32-ounce solution-dyed broadloom carpet with 64-ounce pad and edge-bound 4-inch base, 12-by-24-inch gravel bath floor and wall tile with charcoal grout, 6-by-24 factory-cut tile base, and 6-by-6 flexible concrete vanity feature tile.
Millwork and plumbing fixture schedules carried equal precision, specifying 59.75-inch standard vanities alongside left-hand and right-hand accessible vanity configurations paired with overmount bowls and quartz vanity tops.