August 8, 2017 · Systems
Blending two ocean containers of custom LED mirrors, lighting, and casegoods with domestic bedding and wallcoverings across a low-six-figure conversion package.
May 15, 2017 · Systems
Translating a brand change-of-ownership Property Improvement Plan across 86 guestrooms, lobby, and meeting space into a structured FF&E bid matrix in Brazoria County.
October 17, 2014 · Systems
Coordinating custom shop drawings, drapery measurements, and 30/70 container milestones across an 82-key Staybridge Suites extended-stay build in West Houston.
April 12, 2010 · Systems
Engineering high-capacity commercial water heating, sub-slab lint traps, and high-flow plumbing infrastructure for a dual laundromat and car wash facility.
August 6, 2009 · Systems
Running a 30-milestone transfer system to take over an operating Lenny's Sub Shop franchise in Greater Houston without dropping payroll, food distribution, or merchant processing.
March 12, 2009 · Systems
Auditing high-capacity 480V three-phase electrical distribution, foundation vibration isolation, and overhead crane clearances for the F & C Tool Grinding CNC machining facility.