April 25, 2018 · Systems
Managing a 156-room coastal hotel public space conversion using a 276-page specification book, Revit first-floor models, and multi-stage PO tracking.
April 17, 2018 · Materials
Coordinating guestroom casegoods, bedding, seating, and lighting quantities for a 57-key La Quinta Living Modern 2.0 Del Sol renovation on the Texas Gulf Coast.
February 14, 2018 · Construction
Directing emergency building envelope drying, structural moisture mapping, and insurance scope reconciliation for an Americas Best Value Inn on the Texas Gulf Coast following Hurricane Harvey.
February 13, 2018 · Construction
Synchronizing a 182-page brand design manual, 56 pages of architectural plans, and gated milestone production draws across a 145-room coastal property.
January 18, 2018 · Underwriting
Cataloging 35 damaged coastal guestrooms room by room at Americas Best Value Inn in the Texas Coastal Bend across nine unit layouts to support windstorm claim replacement.
January 11, 2018 · Land
Aligning a 41-page geotech soil report, 156-page architecture specs, A101-A104 floorplates, and coastal framing plans across a 77-key Texas Gulf Coast build.
January 10, 2018 · Materials
Coordinating floor-by-floor replacement counts, bedding, casegoods, and appliance buyouts for a 59-key Red Roof Inn renovation along the Texas Gulf Coast.
December 23, 2017 · Lessons
Walking a hurricane-damaged three-story Holiday Inn Express on the Texas Coastal Bend to separate stripped wet-wall framing and corroded steel bases from salvageable room inventory.
December 20, 2017 · Lessons
Establishing clean disposition rules at a storm-hit Country Inn & Suites on the Texas Coastal Bend to save solid seating while replacing water-wicked perimeter millwork.
December 20, 2017 · Systems
How mapping 449 DSLR inspection photos directly onto a live 91-room, 4-floor housekeeping status report kept storm-recovery procurement moving inside an operating hotel.
December 20, 2017 · Systems
How a floor-by-floor La Quinta room audit separated moisture-damaged furniture from intact rooms after coastal storm water intrusion on the Texas Gulf Coast.
December 20, 2017 · Systems
Pairing 67 post-storm suite photos with a 29-page fixture order guide, 17-page millwork drawings, and a live OOO tracker to accelerate Texas Gulf Coast returns-to-service.
November 21, 2017 · Lessons
Documenting 29 guestrooms and 885 tagged inspection photos across the hurricane-damaged Blue Wave Inn on the Texas Coastal Bend to substantiate PTAC, mold, and envelope insurance claims.
November 21, 2017 · Underwriting
Auditing chrome chair bases, brushed metal desk collars, and upholstery humidity wear across a waterfront Holiday Inn on the Texas Gulf Coast.
November 12, 2017 · Materials
Consolidating casegoods, seating, bedding, drapery, and lighting quantities into a single turnkey buyout for a 38-key Rodeway Inn in Kleberg County, Texas.
September 8, 2017 · Materials
When coastal floodwaters hit an operating hotel, mitigation contractors push to gut entire floors. Enforcing a disciplined four-foot flood cut and separating demo from finish trades gets rooms back online months faster.
July 28, 2017 · Materials
How a 62-page coastal renovation plan set, four BIM suite models, and a 153-page FF&E manual align durability specs before saltwater humidity tests the finish schedule.
March 22, 2017 · Materials
Inside the factory shop drawings, pallet separation foam, and dimensional checks for 89 tub and shower surrounds plus 86 quartz vanity assemblies on an Upper Texas Coast build.
January 19, 2017 · Materials
Transitioning a 74-key Candlewood Suites build on the Texas Gulf Coast to the Nest scheme while pairing factory kitchenette cabinets with Haven public area specs.
January 19, 2017 · Construction
Managing a 312-page specification binder, 98-page permit set, and 90-key live procurement status matrix for a Texas Coastal Bend hotel build.
December 28, 2016 · Construction
Coordinating a 54-sheet Type V-A building plan set and turnkey 37-key guestroom FF&E buyout for a two-story exterior-corridor motel in Matagorda County, Texas.
October 27, 2016 · Construction
Synchronizing a 74-sheet multi-discipline architectural and structural construction set with a low-seven-figure Formula Blue FF&E package on the Texas Gulf Coast.
August 3, 2016 · Construction
Coordinating a 48-sheet architectural set, 13 structural sheets, and a 70-key FF&E purchasing contract for a three-story Microtel Inn & Suites in Nueces County, Texas.
July 26, 2016 · Construction
Coordinating a 142-sheet civil, structural, architectural, and MEP construction set for a 100-key, 78,137-square-foot Staybridge Suites on the Texas Gulf Coast.