April 25, 2018 · Systems
Managing a 156-room coastal hotel public space conversion using a 276-page specification book, Revit first-floor models, and multi-stage PO tracking.
December 20, 2017 · Systems
How mapping 449 DSLR inspection photos directly onto a live 91-room, 4-floor housekeeping status report kept storm-recovery procurement moving inside an operating hotel.
December 20, 2017 · Systems
How a floor-by-floor La Quinta room audit separated moisture-damaged furniture from intact rooms after coastal storm water intrusion on the Texas Gulf Coast.
December 20, 2017 · Systems
Pairing 67 post-storm suite photos with a 29-page fixture order guide, 17-page millwork drawings, and a live OOO tracker to accelerate Texas Gulf Coast returns-to-service.