December 15, 2015 · Construction
Synchronizing architectural, structural wind-load, civil drainage, and MEP sheet schedules on a four-story Wingate by Wyndham new-build on the Texas Gulf Coast.
December 11, 2013 · Construction
Aligning an 85-sheet Issue for Permit construction set, coastal windstorm structural framing, drainage, and a 258-page Forever Young spec package for a four-story Hampton Inn & Suites on the Texas Gulf Coast.
November 20, 2010 · Construction
Directing commercial dining renovations, banquet bar millwork, and full-service hospitality restaurant fit-outs for a Holiday Inn along the Texas Gulf Coast corridor.
October 15, 2010 · Underwriting
Underwriting full-service hotel physical plants, IHG franchise property improvement plans, and coastal building envelope remediation along the Texas Gulf Coast corridor.
April 12, 2010 · Underwriting
Underwriting forecourt fuel infrastructure, commercial refrigeration walk-in vaults, and environmental compliance for a commercial convenience store and fuel station along the Texas Gulf Coast.
June 6, 2009 · Construction
Managing post-hurricane structural reconstruction, insurance scope reconciliation, fuel canopy re-commissioning, and C-store fit-out for a Mobil travel plaza on the Gulf Coast.
December 10, 2008 · Underwriting
Underwriting a two-year-old Texas Gulf Coast Texaco station with a 4,000 sq ft rear warehouse, deli counter, diesel backup generator that ran straight through Hurricane Ike, and seller financing.
October 14, 2008 · Construction
Coastal hotel renovations fail when cosmetic finishes go up over wet sheathing. Stripping storm-damaged envelope sections, replacing the low-slope roof membrane, and separating insurance scopes from PIP capex protects the asset.
August 18, 2008 · Construction
Conducting post-hurricane forensic building envelope audits, exterior insulation finish system repairs, commercial roof membrane moisture scans, and interior guestroom remediation for a Quality Inn hotel along the Texas Gulf Coast corridor.
June 12, 2008 · Underwriting
Structuring and underwriting a single-tenant absolute NNN sale-leaseback for a high-volume Valero fueling facility along the Texas Gulf Coast.
May 23, 2008 · Underwriting
Structuring an eight-lot commercial convenience store and fuel station acquisition in Kleberg County, Texas with interim contract-for-deed financing, environmental remediation indemnities, and a 15-year fuel supply buyout option.
March 12, 2008 · Underwriting
Auditing physical plant systems, courtyard pool infrastructure, and asset repositioning strategies for a 111-room coastal highway hotel along the Texas Gulf Coast corridor.
February 10, 2008 · Construction
Managing architectural space planning, ballroom interior renovations, and commercial HVAC engineering for a full-service Holiday Inn hotel tower.
January 24, 2008 · Underwriting
Underwriting a lender-owned 93-unit senior living acquisition on 4.4 acres along the Texas Gulf Coast, separating stabilized 83% occupancy from negative lender-run cash flow and 10 floor-plan rate tiers.
January 15, 2008 · Construction
Executing forensic architectural plan takeoffs, structural space planning, and MEP coordination for a multi-story select-service hospitality asset on the Texas Gulf Coast.