April 17, 2018 · Materials
Coordinating guestroom casegoods, bedding, seating, and lighting quantities for a 57-key La Quinta Living Modern 2.0 Del Sol renovation on the Texas Gulf Coast.
January 10, 2018 · Materials
Coordinating floor-by-floor replacement counts, bedding, casegoods, and appliance buyouts for a 59-key Red Roof Inn renovation along the Texas Gulf Coast.
November 12, 2017 · Materials
Consolidating casegoods, seating, bedding, drapery, and lighting quantities into a single turnkey buyout for a 38-key Rodeway Inn in Kleberg County, Texas.
September 8, 2017 · Materials
When coastal floodwaters hit an operating hotel, mitigation contractors push to gut entire floors. Enforcing a disciplined four-foot flood cut and separating demo from finish trades gets rooms back online months faster.
July 28, 2017 · Materials
How a 62-page coastal renovation plan set, four BIM suite models, and a 153-page FF&E manual align durability specs before saltwater humidity tests the finish schedule.
March 22, 2017 · Materials
Inside the factory shop drawings, pallet separation foam, and dimensional checks for 89 tub and shower surrounds plus 86 quartz vanity assemblies on an Upper Texas Coast build.
January 19, 2017 · Materials
Transitioning a 74-key Candlewood Suites build on the Texas Gulf Coast to the Nest scheme while pairing factory kitchenette cabinets with Haven public area specs.