February 14, 2018 · Construction
Directing emergency building envelope drying, structural moisture mapping, and insurance scope reconciliation for an Americas Best Value Inn on the Texas Gulf Coast following Hurricane Harvey.
February 13, 2018 · Construction
Synchronizing a 182-page brand design manual, 56 pages of architectural plans, and gated milestone production draws across a 145-room coastal property.
January 19, 2017 · Construction
Managing a 312-page specification binder, 98-page permit set, and 90-key live procurement status matrix for a Texas Coastal Bend hotel build.
December 28, 2016 · Construction
Coordinating a 54-sheet Type V-A building plan set and turnkey 37-key guestroom FF&E buyout for a two-story exterior-corridor motel in Matagorda County, Texas.
October 27, 2016 · Construction
Synchronizing a 74-sheet multi-discipline architectural and structural construction set with a low-seven-figure Formula Blue FF&E package on the Texas Gulf Coast.
August 3, 2016 · Construction
Coordinating a 48-sheet architectural set, 13 structural sheets, and a 70-key FF&E purchasing contract for a three-story Microtel Inn & Suites in Nueces County, Texas.
July 26, 2016 · Construction
Coordinating a 142-sheet civil, structural, architectural, and MEP construction set for a 100-key, 78,137-square-foot Staybridge Suites on the Texas Gulf Coast.
December 15, 2015 · Construction
Synchronizing architectural, structural wind-load, civil drainage, and MEP sheet schedules on a four-story Wingate by Wyndham new-build on the Texas Gulf Coast.
December 11, 2013 · Construction
Aligning an 85-sheet Issue for Permit construction set, coastal windstorm structural framing, drainage, and a 258-page Forever Young spec package for a four-story Hampton Inn & Suites on the Texas Gulf Coast.
November 20, 2010 · Construction
Directing commercial dining renovations, banquet bar millwork, and full-service hospitality restaurant fit-outs for a Holiday Inn along the Texas Gulf Coast corridor.
October 14, 2008 · Construction
Coastal hotel renovations fail when cosmetic finishes go up over wet sheathing. Stripping storm-damaged envelope sections, replacing the low-slope roof membrane, and separating insurance scopes from PIP capex protects the asset.
August 18, 2008 · Construction
Conducting post-hurricane forensic building envelope audits, exterior insulation finish system repairs, commercial roof membrane moisture scans, and interior guestroom remediation for a Quality Inn hotel along the Texas Gulf Coast corridor.
February 10, 2008 · Construction
Managing architectural space planning, ballroom interior renovations, and commercial HVAC engineering for a full-service Holiday Inn hotel tower.
January 15, 2008 · Construction
Executing forensic architectural plan takeoffs, structural space planning, and MEP coordination for a multi-story select-service hospitality asset on the Texas Gulf Coast.