December 10, 2008  ·  1 min read  ·  Underwriting

Texaco C-Store, Rear Warehouse, and Backup Power Acquisition Underwriting: Texas Gulf Coast

Underwriting a two-year-old Texas Gulf Coast Texaco station with a 4,000 sq ft rear warehouse, deli counter, diesel backup generator that ran straight through Hurricane Ike, and seller financing.

Texaco C-Store, Rear Warehouse, and Backup Power Acquisition Underwriting: Texas Gulf Coast

Illustrative image.

Along the Texas Gulf Coast, hurricane resilience is not an abstract amenity on a commercial fuel site. It is a measurable revenue differentiator.

Reviewed in late 2008 right after Hurricane Ike, this two-year-old Texaco convenience store and fueling facility sat on approximately 1.3 acres in the Texas Gulf Coast corridor. The main retail building covered roughly 3,500 square feet operating six days a week, pulling roughly 102,000 gallons per month at the canopy alongside high-volume inside convenience sales and a hot deli program. Directly behind the store stood an additional 4,000 square feet of warehouse space, adding commercial storage and secondary tenant or distribution flexibility rarely found on a standard rural highway pad.

The defining physical feature during underwriting was a full diesel-powered standby generator tied into the station systems. While neighboring stores and fuel stops went dark across the Gulf Coast after Hurricane Ike, this facility stayed open without shutting down, capturing continuous emergency fuel and deli demand when surrounding power grids failed.

On the capital stack side, the seller offered low-down-payment owner financing paired with SBA-rate inventory financing, letting an operator take over a nearly new 1.3-acre facility with proven storm continuity, diversified foodservice and inside sales, and surplus rear warehouse square footage without tying up heavy upfront equity in working capital.

More projects in Texas Gulf Coast

View all 39 projects in Texas Gulf Coast →