September 10, 2018 · Materials
Converting a 91-key economy motel to Choice Quality Inn standards with coordinated seating, ADA wet-area kits, lighting, and flooring takeoffs in San Antonio, Texas.
June 12, 2018 · Materials
Aligning field meeting revisions, non-upholstered casegoods, and 70 guestroom bathroom packages on a Choice Quality Inn renovation in Greater DFW, Texas.
September 18, 2017 · Materials
Aligning a 3-page design board, COM public lounge upholstery, and an 80-key guestroom takeoff inside a mid-six-figure Southwest Louisiana renovation.
May 24, 2017 · Construction
Coordinating a 72-sheet construction drawing set, geotechnical engineering, custom finish boards, and a 54-key FF&E schedule for a new Quality Inn in Nashville, Tennessee.
October 1, 2016 · Materials
Reconciling Choice Hotels Property Improvement Plan mandates with a 55-key guestroom and public-area FF&E schedule in South Carolina.
June 29, 2016 · Materials
Separating custom guestroom casegoods, Lexmark carpet yardage, and public-area quartz breakfast tables for a 60-key Quality Inn renovation in Atlanta, Georgia.
June 23, 2016 · Materials
Redlining 31-page factory cabinet and granite shop drawings down to SKU-level carton staging on a 39-room Choice brand conversion in East Houston.
September 9, 2015 · Materials
Structuring a 102-room select-service casegoods package across 45 King and 57 Queen layouts with direct container sourcing and a 14% freight load.
July 18, 2014 · Construction
Auditing outstanding Choice Hotels inspection items, requesting phased completion extensions, and aligning public-space finish boards on a Quality Inn renovation in Yakima County, Washington.
September 19, 2012 · Construction
Conducting a room-by-room Quality Inn baseline inspection in North Houston to separate reusable structural items from required electrical, lighting, and casegoods replacements.
November 18, 2008 · Construction
Managing the adaptive reuse conversion of a two-story commercial office building into a Quality Inn franchise, coordinating site civil logistics and MEP core modifications.
October 14, 2008 · Construction
Coastal hotel renovations fail when cosmetic finishes go up over wet sheathing. Stripping storm-damaged envelope sections, replacing the low-slope roof membrane, and separating insurance scopes from PIP capex protects the asset.
August 28, 2008 · Underwriting
Executing pre-auction physical plant due diligence, county tax parcel verification, and Quality Inn PIP underwriting for a multi-building freeway hotel in Greater DFW.
August 18, 2008 · Construction
Conducting post-hurricane forensic building envelope audits, exterior insulation finish system repairs, commercial roof membrane moisture scans, and interior guestroom remediation for a Quality Inn hotel along the Texas Gulf Coast corridor.
January 15, 2008 · Construction
Executing forensic architectural plan takeoffs, structural space planning, and MEP coordination for a multi-story select-service hospitality asset on the Texas Gulf Coast.
June 20, 2007 · Underwriting
Dissecting weekly STAR competitive set indices, weekday corporate demand, and departmental expense ratios to underwrite a multi-story Quality Inn & Suites in Greater DFW.