September 18, 2017  ·  1 min read  ·  Materials

Quality Suites 80-Key Casegoods & Lobby Package Coordination: Southwest Louisiana

Aligning a 3-page design board, COM public lounge upholstery, and an 80-key guestroom takeoff inside a mid-six-figure Southwest Louisiana renovation.

Quality Suites 80-Key Casegoods & Lobby Package Coordination: Southwest Louisiana

Running an 80-key extended-suite renovation breaks down quickly when the design board lives in one studio, COM yardage in another, and guestroom quantity takeoffs in a third workbook. On a Southwest Louisiana Quality Suites scoped in late 2017, I pulled finish selection, fabric yardage calculations, and unit scheduling into one coordinated materials matrix under a mid-six-figure capital budget.

The guestroom schedule spans 80 rooms across six distinct configurations: 37 standard Kings, 1 King ADA suite, 4 King Suites, 28 Double Queens, 1 Double Queen ADA room, and 9 Double Queen Suites. Every sleeping bay took uniform 48-inch desks, triple-piece coordinated wall artwork sets, three accent side tables per room (240 tables total), and 80 LED-backlit bath mirrors, paired with dark walnut veneers, brushed metal accents, and custom lounge seating built around Customer's Own Material yardage.

Room Matrix & Materials Controls

  • Unified 80 guestrooms across six room types under one bill of quantities (80 desks, 80 LED mirrors, 240 occasional tables, and 240 framed art pieces).
  • Locked a 3-page material board matching dark walnut laminates, brass finish hardware, and public-lounge sectional yardage schedules before factory release.
  • Modeled a 12% to 15% freight load factor into the master material schedule so regional LTL and dedicated truck drops matched phased floor handoffs.

Controlling finishes before fabrication turns a six-layout suite hotel into a repeatable installation sequence. One master count eliminates duplicate freight charges, keeps dye lots aligned between lobby and guest corridors, and gives ownership predictable turn dates per wing.

More in Materials

Related field notes & case studies

More real numbers, takeoffs, and post-mortems from the operation. View all entries →