October 14, 2026 · Construction
Food-service tenant build-outs inside existing commercial retail centers fail or bleed cash when architectural and MEP engineering are treated as afterthoughts.
December 6, 2011 · Construction
Directing commercial master planning, civil detention engineering, and multi-tenant commercial condo platting for a multi-building wholesale trade center in Southwest Houston.
April 1, 2011 · Construction
Directing the commercial food service tenant build-out for Best Donuts & Kolaches, managing three-compartment pot sinks, below-slab commercial grease waste lines, commercial baking equipment gas hookups, and health department compliance in Northeast Houston.
March 10, 2011 · Construction
Directing commercial roofing rehabilitation and structural equipment penetration framing on an operating multi-tenant retail shopping center, managing membrane saw-cutting, structural steel curb headers, parapet counterflashing, and weatherproofing in Northeast Houston.
February 10, 2011 · Construction
Managing commercial tenant interior build-out for an operating personal care hair salon, directing specialized shampoo bowl plumbing distribution, architectural partition framing, dedicated hot water delivery, and commercial interior finishes in Northeast Houston.
September 22, 2010 · Construction
Directing commercial quick-service kitchen installations, Type I exhaust hoods, and sanitary plumbing compliance for a retail food and deli build-out in Inner Loop Houston.
August 17, 2010 · Construction
Delivering a commercial end-cap retail vanilla box shell, managing reflected ceiling plans, and engineering MEP rough-ins for rapid tenant occupancy.
January 4, 2010 · Construction
Delivering multi-tenant retail infill at Ashford Lakes Shopping Center, anchored by the Little Kiddos Daycare build-out alongside insurance and personal service suites with strict life-safety egress and lien control.
November 17, 2009 · Construction
Adding a high-energy sports bar to Post Oak Grill demands insulated glycol draft runs, acoustic isolation between dining zones, structural AV rigging, and custom commercial bar millwork built to take heavy nightly volume.
July 2, 2009 · Construction
Directing commercial restaurant architectural space planning, Type I commercial kitchen exhaust hood ventilation, grease waste drainage infrastructure, three-compartment pot wash sinks, and municipal health code compliance in Houston.
June 23, 2009 · Construction
Documenting architectural as-built spatial layouts, structural perimeter wall dimensions, ADA restroom compliance, commercial electrical switchgear capacity, and tenant lease demising for a retail store build-out in the Southwest Houston corridor.
April 15, 2009 · Construction
Commercial restaurant build-outs pack heavy mechanical, electrical, and sub-slab grease plumbing into tight footprints. Preconstruction air balancing and millwork coordination prevent permit delays at final inspection.