March 22, 2011 · Materials
Managing commercial tenant interior delivery for a T-Mobile wireless retail store, directing cold-formed metal stud display framing, low-voltage cabling pathways, electrical branch distribution, and drywall assemblies in West Houston.
March 22, 2011 · Materials
Auditing commercial hospitality sports bar kitchen exhaust hoods, dedicated makeup air louvers, fire suppression manifolds, and gas utility lines along the West Houston corridor.
February 2, 2011 · Materials
Delivering a Boost Mobile retail store build-out, recessed drywall display niche framing, low-voltage telecommunications pathways, and MEP branch distribution along the Northeast Houston corridor.
January 10, 2011 · Materials
Delivering commercial restaurant kitchen back-of-house sanitation stations, stainless steel pot sinks, mechanical pre-rinse assemblies, and grease waste plumbing along the West Houston corridor.
September 28, 2010 · Materials
Auditing commercial neighborhood retail store interior sales floors, steel display gondolas, ceiling circulation systems, and transaction counter layouts in the Inner Loop Houston corridor.
September 28, 2010 · Materials
Auditing commercial retail convenience store walk-in cooler vaults, glass display reach-in doors, remote refrigeration compressors, and thermal insulation assemblies in Inner Loop Houston.
August 21, 2009 · Materials
Managing a State Farm insurance office tenant build-out, commercial drywall assembly delivery, structural metal stud framing, and acoustic partition construction in the West Houston corridor.