February 28, 2018 · Underwriting
How digital floorplan takeoffs across nine guestroom subtypes and direct factory terms structured a seven-figure FF&E budget with 50-to-60-day ocean transit discipline.
June 16, 2015 · Underwriting
A 90-page preliminary four-story architectural, site, structural, and MEP plan set issued specifically for early construction budget estimating in West Houston TX.
August 25, 2014 · Underwriting
Breaking down a low-six-figure partial FF&E renovation budget across ten guestroom configurations and three iterative AutoCAD lobby layouts.
July 16, 2013 · Underwriting
Physical plant, capital expenditure, and flag-conversion due diligence on a 238-key 11-story full-service Holiday Inn near Texas Medical Center in Houston.
August 16, 2010 · Underwriting
Underwriting physical plant conditions, Choice Hotels PIP requirements, and historical STR RevPAR performance for a Comfort Inn along the US-290 corridor in Northwest Houston.
October 8, 2008 · Underwriting
Conducting post-hurricane building envelope forensics, roof membrane assessments, and guestroom PTAC physical plant audits for Travelers Inn along the North Houston highway corridor.
September 18, 2008 · Underwriting
Airport corridor hotels run on volatile transit, airline crew, and distressed-passenger demand. Turning around an underperforming property requires daily flash tracking, strict brand QA punchlists, and direct contract room allocations.
September 18, 2008 · Underwriting
Walking the physical plant, auditing building envelopes, and underwriting franchise conversion capital reserves for an airport corridor hotel near Houston Hobby Airport.
September 10, 2008 · Underwriting
Walking the roof, auditing rooftop package chillers, electrical switchboards, and life safety systems for an operating Ramada hotel along the North Houston highway corridor.
August 20, 2008 · Underwriting
Auditing physical plant systems, building envelopes, and franchise conversion feasibility for a Super 8 hotel along the Northwest Houston highway corridor.
August 15, 2008 · Underwriting
Cross-checking state Comptroller hotel tax filings against internal P&L ledgers and pricing a targeted repositioning PIP for a Ramada along the North Houston transit corridor.
July 17, 2008 · Underwriting
Underwriting industrial corridor commercial lodging feasibility, 108-room prototype spatial design, civil detention pond engineering, and heavy transit circulation for a Motel 6 development in the East Houston industrial corridor.
June 19, 2008 · Underwriting
Broker offering memorandums project aggressive occupancy growth and minimal capex. Building a real five-year hotel pro forma means auditing STAR competitive penetration and pricing the actual PIP line by line.
May 22, 2008 · Underwriting
Underwriting a high-turnover Motel 6 in a Houston airport transit corridor by auditing county property tax assessments, exterior corridor structure, and 24-hour operating costs.
March 22, 2008 · Underwriting
Underwriting physical plant conditions, structural foundation integrity, commercial roof membrane remaining useful life, guestroom PTAC mechanical units, and franchise PIP capital reserves for a Comfort Inn on US-290 in Northwest Houston.
April 12, 2007 · Underwriting
Underwriting the acquisition and franchise conversion of Woodley Suites into a dual-brand economy hotel along an active commercial transit corridor in Houston.