June 17, 2025 · Lessons
Pay for it forever, or learn it once
Every project eventually hits a wall the market built. The choice at the wall is always the same.
Journal
Lessons from land, materials, construction, and the closing table, written the way they were learned.
June 17, 2025 · Lessons
Every project eventually hits a wall the market built. The choice at the wall is always the same.
August 30, 2018 · Lessons
How unverified rough-in tolerances across a 67-room occupied PIP forced floor-by-floor quartz field cuts, backsplash modifications, and valve change orders.
December 23, 2017 · Lessons
Walking a hurricane-damaged three-story Holiday Inn Express on the Texas Coastal Bend to separate stripped wet-wall framing and corroded steel bases from salvageable room inventory.
December 20, 2017 · Lessons
Establishing clean disposition rules at a storm-hit Country Inn & Suites on the Texas Coastal Bend to save solid seating while replacing water-wicked perimeter millwork.
November 21, 2017 · Lessons
Documenting 29 guestrooms and 885 tagged inspection photos across the hurricane-damaged Blue Wave Inn on the Texas Coastal Bend to substantiate PTAC, mold, and envelope insurance claims.
January 19, 2017 · Lessons
How selective bath stripping uncovered hidden plumbing-chase moisture on an Inner West Houston renovation, and how a 4-to-7-day steel bed-base sprint kept rooms turning.
April 2, 2015 · Lessons
Catching a double-queen headboard multiplier error before overseas factory release on a North Houston Country Inn & Suites project.
March 23, 2015 · Lessons
Combining Certificate of Origin logistics, 5,950 linear feet of wall base, and COM fabric tracking across a mid-six-figure West Texas select-service renovation.