August 30, 2018 · Lessons
How unverified rough-in tolerances across a 67-room occupied PIP forced floor-by-floor quartz field cuts, backsplash modifications, and valve change orders.
December 23, 2017 · Lessons
Walking a hurricane-damaged three-story Holiday Inn Express on the Texas Coastal Bend to separate stripped wet-wall framing and corroded steel bases from salvageable room inventory.
January 19, 2017 · Lessons
How selective bath stripping uncovered hidden plumbing-chase moisture on an Inner West Houston renovation, and how a 4-to-7-day steel bed-base sprint kept rooms turning.