March 16, 2017  ·  1 min read  ·  Materials

Residence Inn by Marriott 110-Key Multi-Layout FF&E Standardization: Northern Colorado

Managing 15 distinct extended-stay suite floorplans and Gen 9 Possibilities public space finishes across a 110-key Residence Inn by Marriott in Northern Colorado.

Residence Inn by Marriott 110-Key Multi-Layout FF&E Standardization: Northern Colorado

Large extended-stay builds lose margin when design teams multiply minor floorplan variations without tightening procurement templates. On this 110-key Residence Inn by Marriott build in Northern Colorado through early 2017, the bid matrix consolidated 15 separate suite floorplans alongside public gatehouse packages under the Gen 9 Possibilities finish standard.

The 110-key distribution spanned six Studio layouts (A1, A1 Alt, A2, A3, Studio B ADA, Studio C Roll-In ADA totaling 59 keys), two Double Queen types (16 keys), four One-Bedroom suite types (25 keys), and three Two-Bedroom suite configurations (10 keys).

Spec Index & Gatehouse Synchronization

  • Finish Schedule Mapping: Cross-checked Marriott Gen 9 Neuhaus and Possibilities interior finish indexes against civil, structural, MEP, kitchen, and architectural issue-for-permit sets so public area lighting, carpet, and stone lined up on one schedule.
  • Bedding & Foundation Discipline: Standardized King (`71x80`) and box-spring motion-stability specs alongside clean millwork tolerances prior to issuing manufacturer purchase orders.
  • Public Area Communal Seating & Tables: Tied 48-inch round tables, D-shape dining tops, communal tables, and banquette seating to verified power-floor core locations in the breakfast and hearth zone.

Collapsing 15 architectural suite labels into clean manufacturing buckets cuts both factory tooling surcharges and receiving confusion on site.

More in Materials

Related field notes & case studies

More real numbers, takeoffs, and post-mortems from the operation. View all entries →