January 14, 2015  ·  1 min read  ·  Materials

Country Inn & Suites 71-Key FF&E Specification & Procurement Package: West Houston, TX

Coordinating a 172-page brand specification book, 58 architectural drawings, and direct purchase orders across 71 guestrooms and suites in West Houston.

Country Inn & Suites 71-Key FF&E Specification & Procurement Package: West Houston, TX

Procurement only works smoothly when the specification book, the architectural drawings, and the factory purchase orders speak the same SKU language. On a 71-key Country Inn & Suites project in West Houston (14 Double Queens, 1 ADA Double Queen, 30 Kings, 3 ADA Kings, 22 King Suites, and 1 ADA King Suite), our procurement office bridged a 172-page interior specification book and 58 architectural sheets into one locked factory takeoff.

Auditing Every Zone Before Issuing Purchase Orders

Each guestroom typology required matching finishes across millwork, textiles, seating, and lighting without dropping suite-specific variations:

  • Casegoods & Storage (GC-251 through GC-268): Custom headboards, open nightstands, closed-storage credenzas, desks, closet cabinetry, and floating bathroom vanity frames with brushed-nickel leg ferrules and dark woodgrain laminates.
  • Seating, Fabrics & Millwork Coordination (GC-151 through GC-157): Task chairs, suite lounge seating, ottomans, and accent wingback chairs paired directly with Valley Forge blackout and sheer drapery textiles and Douglass Industries performance vinyls under purchase-order tracking before container booking.
  • Hard Surfaces & Lighting (GC-351 through GC-353): 12" x 24" glazed porcelain tile (Floridatile Gravel), solid-surface/stone bathroom vanity tops matching sample mockups, reading lamps, floor lamps, and hard-wired wall sconces verified against the 58-sheet architectural set.

Locking Procurement Copies to Prevent Drift

Once client deposits cleared, the master takeoff workbook was frozen into a dedicated procurement-control copy synced with factory POs and supplier confirmations. Separating open bidding tabs from locked ordering schedules kept custom COM fabrics, lighting voltage specs, and stone vanity cutouts aligned across all 71 West Houston rooms.

More Country Inn & Suites projects

View all 7 Country Inn & Suites projects →