Full-property Sleep Inn Designed to Dream conversions touch every trade from lobby millwork down to bathroom shower surrounds. In Wake County within the Raleigh, North Carolina metro area, an April 2017 mid-six-figure FF&E and architectural wet-area bid aligned 80 guestrooms and common areas directly against Choice Hotels AES PIP mandates.
Four-Layout Guestroom Buyout
Casegoods, seating, and bedding counts were distributed precisely across 29 Kings, 2 King Suites, 44 Double Queens, and 5 ADA Double Queen bays:
- Custom millwork and wet areas: Specified 31 King and 93 Queen headboards, 80 side tables, 80 open closets, 111 nightstands, 73 grommeted desks, 80 micro-fridge cabinets, 80 vanity bases, 80 60-inch quartz vanity tops with undermount sinks, 80 tub and shower surrounds, 31 King shower pans, and 80 frameless glass shower door systems.
- Soft goods, flooring, and lighting: Delivered 75 accent lounge chairs, 80 ergonomic chairs, 80 cocktail ottomans with COM upholstery, 129 traversing sheer and blackout drapery assemblies, 2,812 square yards of Lexmark guestroom carpet, 5,610 square feet of 6-by-12-inch bathroom floor tile, 5,600 linear feet of tile base, and 386 bedside, desk, sconce, and ceiling light fixtures.
Public Spaces and PIP Integration
Lobby, vestibule, fitness room, and breakfast area scopes layered in custom quartz front-desk and buffet countertops, Lexmark broadloom and stairway stringer carpet, commercial roller shades, and wood blinds. Tying space planning and design submittals into the production timeline kept pre-opening brand approvals moving cleanly in Wake County.