February 1, 2017  ·  1 min read  ·  Underwriting

La Quinta Del Sol 93-Key Prototype Build: Standardizing Nine Room Configurations: Central Texas

How a 93-room Central Texas new-build split into nine distinct floorplan types, requiring tight alignment between CAD layouts, lounge seating, and bedding pack counts.

La Quinta Del Sol 93-Key Prototype Build: Standardizing Nine Room Configurations: Central Texas

Modern upper-economy and midscale prototypes look uniform from the highway, yet inside the procurement workbook a 93-key hotel rarely breaks down into just two room types. For a ground-up hospitality build in Central Texas for a La Quinta Del Sol prototype backed by a 182-page interior design specifications manual, CAD public-area drawings, and multi-floor floorplan sets, our team structured a complete bid across nine distinct guestroom permutations.

Counting all nine templates side by side showed how fast quantities multiply out of standard assumptions: 42 Double Queens, 3 wide Double Queens, 1 accessible Double Queen, 26 Kings, 1 wide King, 2 wide extended Kings, 12 extended Kings, 2 accessible extended Kings, and 4 accessible Kings totaling exactly 93 keys.

That nine-way split drives real purchasing accuracy well beyond casegoods:

  • Bedding and soft-goods pack math: Our matrix broke top sheets, duvet inserts, and box-spring wraps down to exact unit counts across 47 King configurations, 92 Queen bed packs for the 46 two-bed rooms, and six accessible bed wraps so housekeeping never runs short on fitted specialty corners.
  • Public-space lounge zones: Alongside the guestroom tower, open-concept lobby zones paired geometric patterned carpet tile, pendant fixtures, and high-back lounge armchairs ordered directly to prototype finish schedules.
  • Seven-workbook version control: Tracking 41 specification PDFs and seven revision spreadsheets kept designer manual updates synchronized with factory quotes as column layouts shifted through permitting.

Serious procurement is about honoring the boring arithmetic of nine subtle room variations before deposit wires go out.

More in Underwriting

Related field notes & case studies

More real numbers, takeoffs, and post-mortems from the operation. View all entries →