{"name":"Boris Artiga","description":"Houston Commercial Real Estate &amp; Construction","url":"https:\/\/borisartiga.com","home":"https:\/\/borisartiga.com","gmt_offset":-5,"timezone_string":"America\/Chicago","page_for_posts":0,"page_on_front":193,"show_on_front":"page","namespaces":["oembed\/1.0","akismet\/v1","litespeed\/v1","litespeed\/v3","slim-seo-pro","elementor-one\/v1","elementor\/v1","elementor-pro\/v1","hostinger-tools-plugin\/v1","slim-seo-link-manager","slim-seo-schema","sureforms\/v1","elementor-hello-elementor\/v1","elementor\/v1\/documents","elementor-ai\/v1","elementor\/v1\/feedback","mbb","slim-seo","slim-seo-redirection","mb-blocks\/v1","mb-relationships\/v1","meta-box\/v1","mbv","mbv\/location","sureforms-pro\/v1","sureforms-pro","sureforms","suremembers\/v1","mbfs","wp\/v2","wp-site-health\/v1","wp-block-editor\/v1","wp-abilities\/v1"],"authentication":[],"routes":{"\/":{"namespace":"","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/"}]}},"\/batch\/v1":{"namespace":"","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"validation":{"type":"string","enum":["require-all-validate","normal"],"default":"normal","required":false},"requests":{"type":"array","maxItems":25,"items":{"type":"object","properties":{"method":{"type":"string","enum":["POST","PUT","PATCH","DELETE"],"default":"POST"},"path":{"type":"string","required":true},"body":{"type":"object","properties":[],"additionalProperties":true},"headers":{"type":"object","properties":[],"additionalProperties":{"type":["string","array"],"items":{"type":"string"}}}}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/batch\/v1"}]}},"\/oembed\/1.0":{"namespace":"oembed\/1.0","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"oembed\/1.0","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/oembed\/1.0"}]}},"\/oembed\/1.0\/embed":{"namespace":"oembed\/1.0","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"description":"The URL of the resource for which to fetch oEmbed data.","type":"string","format":"uri","required":true},"format":{"default":"json","required":false},"maxwidth":{"default":600,"required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/oembed\/1.0\/embed"}]}},"\/oembed\/1.0\/proxy":{"namespace":"oembed\/1.0","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"description":"The URL of the resource for which to fetch oEmbed data.","type":"string","format":"uri","required":true},"format":{"description":"The oEmbed format to use.","type":"string","default":"json","enum":["json","xml"],"required":false},"maxwidth":{"description":"The maximum width of the embed frame in pixels.","type":"integer","default":600,"required":false},"maxheight":{"description":"The maximum height of the embed frame in pixels.","type":"integer","required":false},"discover":{"description":"Whether to perform an oEmbed discovery request for unsanctioned providers.","type":"boolean","default":true,"required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/oembed\/1.0\/proxy"}]}},"\/akismet\/v1":{"namespace":"akismet\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"akismet\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/akismet\/v1"}]}},"\/akismet\/v1\/key":{"namespace":"akismet\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"key":{"type":"string","description":"A 12-character Akismet API key. Available at akismet.com\/account","required":true}}},{"methods":["DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/akismet\/v1\/key"}]}},"\/akismet\/v1\/settings":{"namespace":"akismet\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"akismet_strictness":{"type":"boolean","description":"If true, Akismet will automatically discard the worst spam automatically rather than putting it in the spam folder.","required":false},"akismet_show_user_comments_approved":{"type":"boolean","description":"If true, show the number of approved comments beside each comment author in the comments list page.","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/akismet\/v1\/settings"}]}},"\/akismet\/v1\/stats":{"namespace":"akismet\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"interval":{"type":"string","description":"The time period for which to retrieve stats. Options: 60-days, 6-months, all","default":"all","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/akismet\/v1\/stats"}]}},"\/akismet\/v1\/stats\/(?P<interval>[\\w+])":{"namespace":"akismet\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"interval":{"description":"The time period for which to retrieve stats. Options: 60-days, 6-months, all","type":"string","required":false}}}]},"\/akismet\/v1\/alert":{"namespace":"akismet\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"key":{"type":"string","description":"A 12-character Akismet API key. Available at akismet.com\/account","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"key":{"type":"string","description":"A 12-character Akismet API key. Available at akismet.com\/account","required":false}}},{"methods":["DELETE"],"args":{"key":{"type":"string","description":"A 12-character Akismet API key. Available at akismet.com\/account","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/akismet\/v1\/alert"}]}},"\/akismet\/v1\/webhook":{"namespace":"akismet\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/akismet\/v1\/webhook"}]}},"\/litespeed\/v1":{"namespace":"litespeed\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"litespeed\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/litespeed\/v1"}]}},"\/litespeed\/v1\/toggle_crawler_state":{"namespace":"litespeed\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/litespeed\/v1\/toggle_crawler_state"}]}},"\/litespeed\/v1\/tool\/check_ip":{"namespace":"litespeed\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/litespeed\/v1\/tool\/check_ip"}]}},"\/litespeed\/v1\/guest\/sync":{"namespace":"litespeed\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/litespeed\/v1\/guest\/sync"}]}},"\/litespeed\/v3":{"namespace":"litespeed\/v3","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"litespeed\/v3","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/litespeed\/v3"}]}},"\/litespeed\/v3\/ip_validate":{"namespace":"litespeed\/v3","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/litespeed\/v3\/ip_validate"}]}},"\/litespeed\/v3\/wp_rest_echo":{"namespace":"litespeed\/v3","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/litespeed\/v3\/wp_rest_echo"}]}},"\/litespeed\/v3\/ping":{"namespace":"litespeed\/v3","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/litespeed\/v3\/ping"}]}},"\/litespeed\/v3\/cdn_status":{"namespace":"litespeed\/v3","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/litespeed\/v3\/cdn_status"}]}},"\/litespeed\/v1\/notify_img":{"namespace":"litespeed\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/litespeed\/v1\/notify_img"}]}},"\/litespeed\/v1\/notify_ccss":{"namespace":"litespeed\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/litespeed\/v1\/notify_ccss"}]}},"\/litespeed\/v1\/notify_ucss":{"namespace":"litespeed\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/litespeed\/v1\/notify_ucss"}]}},"\/litespeed\/v1\/notify_vpi":{"namespace":"litespeed\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/litespeed\/v1\/notify_vpi"}]}},"\/litespeed\/v3\/err_domains":{"namespace":"litespeed\/v3","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/litespeed\/v3\/err_domains"}]}},"\/litespeed\/v1\/check_img":{"namespace":"litespeed\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/litespeed\/v1\/check_img"}]}},"\/slim-seo-pro":{"namespace":"slim-seo-pro","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"slim-seo-pro","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-pro"}]}},"\/slim-seo-pro\/analytics\/settings":{"namespace":"slim-seo-pro","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-pro\/analytics\/settings"}]}},"\/slim-seo-pro\/analytics\/revoke_google_authorization":{"namespace":"slim-seo-pro","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-pro\/analytics\/revoke_google_authorization"}]}},"\/slim-seo-pro\/analytics\/count_data":{"namespace":"slim-seo-pro","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-pro\/analytics\/count_data"}]}},"\/slim-seo-pro\/analytics\/get_data":{"namespace":"slim-seo-pro","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-pro\/analytics\/get_data"}]}},"\/slim-seo-pro\/analytics\/export_csv":{"namespace":"slim-seo-pro","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-pro\/analytics\/export_csv"}]}},"\/slim-seo-pro\/content_analysis\/image_detail":{"namespace":"slim-seo-pro","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-pro\/content_analysis\/image_detail"}]}},"\/slim-seo-pro\/content_analysis\/builder_content":{"namespace":"slim-seo-pro","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-pro\/content_analysis\/builder_content"}]}},"\/slim-seo-pro\/auto_link\/total_keywords":{"namespace":"slim-seo-pro","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-pro\/auto_link\/total_keywords"}]}},"\/slim-seo-pro\/auto_link\/list_keywords":{"namespace":"slim-seo-pro","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-pro\/auto_link\/list_keywords"}]}},"\/slim-seo-pro\/auto_link\/keyword_exists":{"namespace":"slim-seo-pro","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-pro\/auto_link\/keyword_exists"}]}},"\/slim-seo-pro\/auto_link\/update_keyword":{"namespace":"slim-seo-pro","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-pro\/auto_link\/update_keyword"}]}},"\/slim-seo-pro\/auto_link\/delete_keywords":{"namespace":"slim-seo-pro","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-pro\/auto_link\/delete_keywords"}]}},"\/slim-seo-pro\/auto_link\/save_settings":{"namespace":"slim-seo-pro","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-pro\/auto_link\/save_settings"}]}},"\/elementor-one\/v1":{"namespace":"elementor-one\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"elementor-one\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor-one\/v1"}]}},"\/elementor-one\/v1\/connect\/authorize":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"clearSession":{"type":"boolean","default":false,"required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor-one\/v1\/connect\/authorize"}]}},"\/elementor-one\/v1\/connect\/disconnect":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor-one\/v1\/connect\/disconnect"}]}},"\/elementor-one\/v1\/connect\/switch-domain":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor-one\/v1\/connect\/switch-domain"}]}},"\/elementor-one\/v1\/connect\/deactivate":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor-one\/v1\/connect\/deactivate"}]}},"\/elementor-one\/v1\/top-bar\/notifications":{"namespace":"elementor-one\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"app_name":{"type":"string","required":true},"app_version":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor-one\/v1\/top-bar\/notifications"}]}},"\/elementor-one\/v1\/top-bar\/feedback":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"product":{"type":"string","required":true},"subject":{"type":"string","required":true},"title":{"type":"string","required":true},"description":{"type":"string","required":true},"countryCode":{"type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor-one\/v1\/top-bar\/feedback"}]}},"\/elementor-one\/v1\/themes":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org theme directory slug.","pattern":"[\\w\\-]+","required":true},"status":{"description":"The theme activation status.","type":"string","enum":["inactive","active"],"default":"inactive","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor-one\/v1\/themes"}]}},"\/elementor-one\/v1\/themes\/(?P<slug>[\\w\\-]+)\/activate":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org theme directory slug.","pattern":"[\\w\\-]+","required":true}}}]},"\/elementor-one\/v1\/plugins":{"namespace":"elementor-one\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"status":{"description":"Limits results to plugins with the given status.","type":"array","items":{"type":"string","enum":["inactive","active"]},"required":false}}},{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org plugin directory slug.","enum":["angie","manage","elementor","elementor-pro","site-mailer","image-optimization","pojo-accessibility"],"required":true},"status":{"description":"The plugin activation status.","type":"string","enum":["inactive","active"],"default":"inactive","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor-one\/v1\/plugins"}]}},"\/elementor-one\/v1\/plugins\/(?P<slug>[\\w\\-]+)\/activate":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org plugin directory slug.","enum":["angie","manage","elementor","elementor-pro","site-mailer","image-optimization","pojo-accessibility"],"required":true}}}]},"\/elementor-one\/v1\/plugins\/(?P<slug>[\\w\\-]+)\/deactivate":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org plugin directory slug.","enum":["angie","manage","elementor","elementor-pro","site-mailer","image-optimization","pojo-accessibility"],"required":true}}}]},"\/elementor-one\/v1\/plugins\/(?P<slug>[\\w\\-]+)\/upgrade":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org plugin directory slug.","enum":["angie","manage","elementor","elementor-pro","site-mailer","image-optimization","pojo-accessibility"],"required":true},"status":{"description":"The plugin activation status.","type":"string","enum":["active"],"required":false}}}]},"\/elementor-one\/v1\/plugins\/(?P<slug>[\\w\\-]+)\/migration\/run":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org plugin directory slug.","enum":{"1":"manage","2":"elementor","3":"elementor-pro","4":"site-mailer","5":"image-optimization","6":"pojo-accessibility"},"required":true},"force":{"type":"boolean","default":true,"description":"Force migration even if the plugin is already connected.","required":false}}}]},"\/elementor-one\/v1\/plugins\/(?P<slug>[\\w\\-]+)\/migration\/rollback":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org plugin directory slug.","enum":{"1":"manage","2":"elementor","3":"elementor-pro","4":"site-mailer","5":"image-optimization","6":"pojo-accessibility"},"required":true}}}]},"\/elementor-one\/v1\/settings":{"namespace":"elementor-one\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor-one\/v1\/settings"}]}},"\/elementor\/v1":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"elementor\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor\/v1"}]}},"\/elementor\/v1\/site-editor":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor\/v1\/site-editor"}]}},"\/elementor\/v1\/site-editor\/templates":{"namespace":"elementor\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor\/v1\/site-editor\/templates"}]}},"\/elementor\/v1\/site-editor\/templates\/(?P<id>[\\w]+)":{"namespace":"elementor\/v1","methods":["DELETE","POST","PUT","PATCH"],"endpoints":[{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":false}}}]},"\/elementor\/v1\/site-editor\/conditions-config":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor\/v1\/site-editor\/conditions-config"}]}},"\/elementor\/v1\/site-editor\/templates-conditions\/(?P<id>[\\w]+)":{"namespace":"elementor\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":false}}}]},"\/elementor\/v1\/site-editor\/templates-conditions-conflicts":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor\/v1\/site-editor\/templates-conditions-conflicts"}]}},"\/elementor-pro\/v1":{"namespace":"elementor-pro\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"elementor-pro\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor-pro\/v1"}]}},"\/elementor-pro\/v1\/license\/tier-features":{"namespace":"elementor-pro\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor-pro\/v1\/license\/tier-features"}]}},"\/elementor-pro\/v1\/license\/get-license-status":{"namespace":"elementor-pro\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor-pro\/v1\/license\/get-license-status"}]}},"\/hostinger-tools-plugin\/v1":{"namespace":"hostinger-tools-plugin\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"hostinger-tools-plugin\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/hostinger-tools-plugin\/v1"}]}},"\/hostinger-tools-plugin\/v1\/get-settings":{"namespace":"hostinger-tools-plugin\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/hostinger-tools-plugin\/v1\/get-settings"}]}},"\/hostinger-tools-plugin\/v1\/update-settings":{"namespace":"hostinger-tools-plugin\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/hostinger-tools-plugin\/v1\/update-settings"}]}},"\/hostinger-tools-plugin\/v1\/regenerate-bypass-code":{"namespace":"hostinger-tools-plugin\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/hostinger-tools-plugin\/v1\/regenerate-bypass-code"}]}},"\/slim-seo-link-manager":{"namespace":"slim-seo-link-manager","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"slim-seo-link-manager","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-link-manager"}]}},"\/slim-seo-link-manager\/suggestions\/links":{"namespace":"slim-seo-link-manager","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-link-manager\/suggestions\/links"}]}},"\/slim-seo-link-manager\/suggestions\/keywords":{"namespace":"slim-seo-link-manager","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-link-manager\/suggestions\/keywords"}]}},"\/slim-seo-link-manager\/suggestions\/search":{"namespace":"slim-seo-link-manager","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-link-manager\/suggestions\/search"}]}},"\/slim-seo-link-manager\/suggestions\/generate_secret_key":{"namespace":"slim-seo-link-manager","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-link-manager\/suggestions\/generate_secret_key"}]}},"\/slim-seo-link-manager\/suggestions\/external_links":{"namespace":"slim-seo-link-manager","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-link-manager\/suggestions\/external_links"}]}},"\/slim-seo-link-manager\/suggestions\/add_linked_site":{"namespace":"slim-seo-link-manager","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-link-manager\/suggestions\/add_linked_site"}]}},"\/slim-seo-link-manager\/suggestions\/delete_linked_site":{"namespace":"slim-seo-link-manager","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-link-manager\/suggestions\/delete_linked_site"}]}},"\/slim-seo-link-manager\/total_links_by_object":{"namespace":"slim-seo-link-manager","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-link-manager\/total_links_by_object"}]}},"\/slim-seo-link-manager\/links_by_object":{"namespace":"slim-seo-link-manager","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-link-manager\/links_by_object"}]}},"\/slim-seo-link-manager\/link_object_name":{"namespace":"slim-seo-link-manager","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-link-manager\/link_object_name"}]}},"\/slim-seo-link-manager\/links_from_text":{"namespace":"slim-seo-link-manager","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-link-manager\/links_from_text"}]}},"\/slim-seo-link-manager\/dashboard":{"namespace":"slim-seo-link-manager","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-link-manager\/dashboard"}]}},"\/slim-seo-link-manager\/total_top_links":{"namespace":"slim-seo-link-manager","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-link-manager\/total_top_links"}]}},"\/slim-seo-link-manager\/top_links":{"namespace":"slim-seo-link-manager","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-link-manager\/top_links"}]}},"\/slim-seo-link-manager\/total_links_by_column_value":{"namespace":"slim-seo-link-manager","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-link-manager\/total_links_by_column_value"}]}},"\/slim-seo-link-manager\/links_by_column_value":{"namespace":"slim-seo-link-manager","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-link-manager\/links_by_column_value"}]}},"\/slim-seo-link-manager\/find_redirect_url":{"namespace":"slim-seo-link-manager","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-link-manager\/find_redirect_url"}]}},"\/slim-seo-link-manager\/unlink":{"namespace":"slim-seo-link-manager","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-link-manager\/unlink"}]}},"\/slim-seo-link-manager\/settings":{"namespace":"slim-seo-link-manager","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-link-manager\/settings"}]}},"\/slim-seo-link-manager\/scanner\/status":{"namespace":"slim-seo-link-manager","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-link-manager\/scanner\/status"}]}},"\/slim-seo-link-manager\/scanner\/start":{"namespace":"slim-seo-link-manager","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-link-manager\/scanner\/start"}]}},"\/slim-seo-link-manager\/scanner\/stop":{"namespace":"slim-seo-link-manager","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-link-manager\/scanner\/stop"}]}},"\/slim-seo-link-manager\/scanner\/records":{"namespace":"slim-seo-link-manager","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-link-manager\/scanner\/records"}]}},"\/slim-seo-link-manager\/scanner\/clear-records":{"namespace":"slim-seo-link-manager","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-link-manager\/scanner\/clear-records"}]}},"\/slim-seo-link-manager\/link-updater\/search":{"namespace":"slim-seo-link-manager","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-link-manager\/link-updater\/search"}]}},"\/slim-seo-link-manager\/link-updater\/update":{"namespace":"slim-seo-link-manager","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-link-manager\/link-updater\/update"}]}},"\/slim-seo-link-manager\/link-updater\/change":{"namespace":"slim-seo-link-manager","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-link-manager\/link-updater\/change"}]}},"\/slim-seo-link-manager\/export\/csv":{"namespace":"slim-seo-link-manager","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-link-manager\/export\/csv"}]}},"\/slim-seo-link-manager\/link-status\/check":{"namespace":"slim-seo-link-manager","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-link-manager\/link-status\/check"}]}},"\/slim-seo-schema":{"namespace":"slim-seo-schema","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"slim-seo-schema","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-schema"}]}},"\/slim-seo-schema\/schemas":{"namespace":"slim-seo-schema","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-schema\/schemas"}]}},"\/slim-seo-schema\/specs":{"namespace":"slim-seo-schema","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-schema\/specs"}]}},"\/slim-seo-schema\/meta_keys":{"namespace":"slim-seo-schema","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-schema\/meta_keys"}]}},"\/slim-seo-schema\/terms":{"namespace":"slim-seo-schema","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"required":false},"term":{"required":false},"selected":{"required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-schema\/terms"}]}},"\/slim-seo-schema\/posts":{"namespace":"slim-seo-schema","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"required":false},"term":{"required":false},"selected":{"required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-schema\/posts"}]}},"\/slim-seo-schema\/import":{"namespace":"slim-seo-schema","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-schema\/import"}]}},"\/slim-seo-schema\/woocommerce\/attributes":{"namespace":"slim-seo-schema","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-schema\/woocommerce\/attributes"}]}},"\/sureforms\/v1":{"namespace":"sureforms\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"sureforms\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1"}]}},"\/sureforms\/v1\/submit-form":{"namespace":"sureforms\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/submit-form"}]}},"\/sureforms\/v1\/forms-data":{"namespace":"sureforms\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/forms-data"}]}},"\/sureforms\/v1\/generate-form-markup":{"namespace":"sureforms\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/generate-form-markup"}]}},"\/sureforms\/v1\/create-new-form":{"namespace":"sureforms\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/create-new-form"}]}},"\/sureforms\/v1\/srfm-global-settings":{"namespace":"sureforms\/v1","methods":["POST","PUT","PATCH","GET"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]},{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/srfm-global-settings"}]}},"\/sureforms\/v1\/send-test-email-summary":{"namespace":"sureforms\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/send-test-email-summary"}]}},"\/sureforms\/v1\/after-submission\/(?P<submission_id>[0-9]+)":{"namespace":"sureforms\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"submission_id":{"required":true}}}]},"\/sureforms\/v1\/generate-form":{"namespace":"sureforms\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"use_system_message":{"required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/generate-form"}]}},"\/sureforms\/v1\/map-fields":{"namespace":"sureforms\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/map-fields"}]}},"\/sureforms\/v1\/initiate-auth":{"namespace":"sureforms\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/initiate-auth"}]}},"\/sureforms\/v1\/handle-access-key":{"namespace":"sureforms\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/handle-access-key"}]}},"\/sureforms\/v1\/entries-chart-data":{"namespace":"sureforms\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/entries-chart-data"}]}},"\/sureforms\/v1\/form-data":{"namespace":"sureforms\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/form-data"}]}},"\/sureforms\/v1\/pages\/search":{"namespace":"sureforms\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"search":{"default":"","required":false},"page":{"default":1,"required":false},"per_page":{"default":20,"required":false},"selected_url":{"default":"","required":false},"selected_urls":{"default":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/pages\/search"}]}},"\/sureforms\/v1\/onboarding\/set-status":{"namespace":"sureforms\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/onboarding\/set-status"}]}},"\/sureforms\/v1\/onboarding\/get-status":{"namespace":"sureforms\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/onboarding\/get-status"}]}},"\/sureforms\/v1\/onboarding\/user-details":{"namespace":"sureforms\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"first_name":{"required":true},"last_name":{"required":false},"email":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/onboarding\/user-details"}]}},"\/sureforms\/v1\/plugin-status":{"namespace":"sureforms\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"plugin":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/plugin-status"}]}},"\/sureforms\/v1\/entries\/list":{"namespace":"sureforms\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"form_id":{"default":0,"required":false},"status":{"default":"all","required":false},"search":{"default":"","required":false},"date_from":{"default":"","required":false},"date_to":{"default":"","required":false},"orderby":{"type":"string","default":"created_at","enum":["ID","id","form_id","user_id","status","type","created_at","updated_at"],"required":false},"order":{"type":"string","default":"DESC","enum":["ASC","DESC"],"required":false},"per_page":{"default":20,"required":false},"page":{"default":1,"required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/entries\/list"}]}},"\/sureforms\/v1\/entries\/read-status":{"namespace":"sureforms\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"entry_ids":{"required":true},"action":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/entries\/read-status"}]}},"\/sureforms\/v1\/entries\/trash":{"namespace":"sureforms\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"entry_ids":{"required":true},"action":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/entries\/trash"}]}},"\/sureforms\/v1\/entries\/delete":{"namespace":"sureforms\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"entry_ids":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/entries\/delete"}]}},"\/sureforms\/v1\/entries\/export":{"namespace":"sureforms\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"entry_ids":{"default":[],"required":false},"form_id":{"default":0,"required":false},"status":{"default":"all","required":false},"search":{"default":"","required":false},"date_from":{"default":"","required":false},"date_to":{"default":"","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/entries\/export"}]}},"\/sureforms\/v1\/entry\/(?P<id>\\d+)\/details":{"namespace":"sureforms\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"required":true}}}]},"\/sureforms\/v1\/entry\/(?P<id>\\d+)\/logs":{"namespace":"sureforms\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"required":true},"per_page":{"default":3,"required":false},"page":{"default":1,"required":false}}}]},"\/sureforms\/v1\/forms":{"namespace":"sureforms\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"page":{"type":"integer","default":1,"minimum":1,"required":false},"per_page":{"type":"integer","minimum":1,"maximum":100,"required":false},"search":{"type":"string","required":false},"status":{"type":"string","enum":["publish","draft","trash","any"],"default":"publish","required":false},"orderby":{"type":"string","default":"date","enum":["date","id","title","modified"],"required":false},"order":{"type":"string","default":"desc","enum":["asc","desc"],"required":false},"date_from":{"type":"string","format":"date","required":false},"date_to":{"type":"string","format":"date","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/forms"}]}},"\/sureforms\/v1\/forms\/export":{"namespace":"sureforms\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"post_ids":{"type":["array","string"],"required":true}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/forms\/export"}]}},"\/sureforms\/v1\/forms\/import":{"namespace":"sureforms\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"forms_data":{"type":"array","required":true},"default_status":{"type":"string","default":"draft","enum":["draft","publish","private"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/forms\/import"}]}},"\/sureforms\/v1\/forms\/manage":{"namespace":"sureforms\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"form_ids":{"type":["array","integer"],"required":true},"action":{"type":"string","enum":["trash","restore","delete"],"required":true}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/forms\/manage"}]}},"\/sureforms\/v1\/forms\/duplicate":{"namespace":"sureforms\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"form_id":{"type":"integer","required":true},"title_suffix":{"type":"string","default":" (Copy)","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/forms\/duplicate"}]}},"\/sureforms\/v1\/entry\/(?P<id>\\d+)\/logs\/(?P<log_id>\\d+)":{"namespace":"sureforms\/v1","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":{"id":{"required":true},"log_id":{"required":true}}}]},"\/sureforms\/v1\/entry\/(?P<id>\\d+)\/notes":{"namespace":"sureforms\/v1","methods":["GET","POST","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"required":true},"per_page":{"default":10,"required":false},"page":{"default":1,"required":false}}},{"methods":["POST"],"args":{"id":{"required":true},"note":{"required":true}}},{"methods":["DELETE"],"args":{"id":{"required":true},"note_id":{"required":true}}}]},"\/sureforms\/v1\/entries\/resend-notification":{"namespace":"sureforms\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"entry_ids":{"required":true},"form_id":{"default":0,"required":false},"email_notification":{"default":0,"required":false},"send_to":{"default":"default","required":false},"recipient":{"default":"","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/entries\/resend-notification"}]}},"\/sureforms\/v1\/entries\/(?P<form_id>\\d+)\/enabled-email-notifications":{"namespace":"sureforms\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"form_id":{"required":true}}}]},"\/sureforms\/v1\/entry\/edit":{"namespace":"sureforms\/v1","methods":["PUT"],"endpoints":[{"methods":["PUT"],"args":{"id":{"required":true},"form_data":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/entry\/edit"}]}},"\/sureforms\/v1\/quiz-entries\/list":{"namespace":"sureforms\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"form_id":{"default":0,"required":false},"search":{"default":"","required":false},"date_from":{"default":"","required":false},"date_to":{"default":"","required":false},"orderby":{"default":"created_at","required":false},"order":{"default":"DESC","required":false},"per_page":{"default":20,"required":false},"page":{"default":1,"required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/quiz-entries\/list"}]}},"\/sureforms\/v1\/quiz-entries\/delete":{"namespace":"sureforms\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"quiz_ids":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/quiz-entries\/delete"}]}},"\/sureforms\/v1\/quiz-entries\/detail":{"namespace":"sureforms\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/quiz-entries\/detail"}]}},"\/sureforms\/v1\/quiz-entries\/update-note":{"namespace":"sureforms\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"required":true},"notes":{"required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/quiz-entries\/update-note"}]}},"\/sureforms\/v1\/quiz-entries\/(?P<id>\\d+)\/notes":{"namespace":"sureforms\/v1","methods":["GET","POST","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"required":true},"per_page":{"default":10,"required":false},"page":{"default":1,"required":false}}},{"methods":["POST"],"args":{"id":{"required":true},"note":{"required":true}}},{"methods":["DELETE"],"args":{"id":{"required":true},"note_id":{"required":true}}}]},"\/sureforms\/v1\/dynamic-options\/sources":{"namespace":"sureforms\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"source_type":{"type":"string","enum":["post_type","taxonomy","user_role"],"required":true}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/dynamic-options\/sources"}]}},"\/sureforms\/v1\/dynamic-options\/items":{"namespace":"sureforms\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"source_type":{"type":"string","enum":["post_type","taxonomy","user_role"],"required":true},"source":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/dynamic-options\/items"}]}},"\/sureforms\/v1\/login":{"namespace":"sureforms\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/login"}]}},"\/sureforms\/v1\/lost-password":{"namespace":"sureforms\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/lost-password"}]}},"\/sureforms\/v1\/reset-password":{"namespace":"sureforms\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/reset-password"}]}},"\/sureforms\/v1\/user-roles":{"namespace":"sureforms\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/user-roles"}]}},"\/sureforms\/v1\/custom-meta-keys":{"namespace":"sureforms\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/custom-meta-keys"}]}},"\/sureforms\/v1\/zap-auth":{"namespace":"sureforms\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/zap-auth"}]}},"\/sureforms\/v1\/zap-get-all-forms":{"namespace":"sureforms\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/zap-get-all-forms"}]}},"\/sureforms\/v1\/save-zap":{"namespace":"sureforms\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/save-zap"}]}},"\/sureforms\/v1\/delete-zap":{"namespace":"sureforms\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/delete-zap"}]}},"\/sureforms\/v1\/zap-auth-data":{"namespace":"sureforms\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/zap-auth-data"}]}},"\/sureforms\/v1\/latest-entry":{"namespace":"sureforms\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/latest-entry"}]}},"\/sureforms\/v1\/save-form":{"namespace":"sureforms\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/save-form"}]}},"\/sureforms\/v1\/send-resume-email":{"namespace":"sureforms\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/send-resume-email"}]}},"\/sureforms\/v1\/native-integrations\/config":{"namespace":"sureforms\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET","POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/native-integrations\/config"}]}},"\/sureforms\/v1\/native-integrations\/all":{"namespace":"sureforms\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/native-integrations\/all"}]}},"\/sureforms\/v1\/native-integrations\/test":{"namespace":"sureforms\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/native-integrations\/test"}]}},"\/sureforms\/v1\/native-integrations\/fields":{"namespace":"sureforms\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"integration":{"type":"string","required":true},"action":{"type":"string","required":true},"parameters":{"type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/native-integrations\/fields"}]}},"\/sureforms\/v1\/integrations\/config\/(?P<type>[a-zA-Z0-9_-]+)":{"namespace":"sureforms\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/sureforms\/v1\/native-integrations\/test-workflow":{"namespace":"sureforms\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/native-integrations\/test-workflow"}]}},"\/sureforms\/v1\/native-integrations\/oauth\/authorize":{"namespace":"sureforms\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"integration":{"type":"string","required":true},"oauth_nonce":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/native-integrations\/oauth\/authorize"}]}},"\/sureforms\/v1\/native-integrations\/oauth\/callback-result":{"namespace":"sureforms\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"integration_type":{"type":"string","required":true},"tokens":{"type":"object","required":true},"verification_token":{"type":"string","required":false},"timestamp":{"type":"integer","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/native-integrations\/oauth\/callback-result"}]}},"\/sureforms\/v1\/native-integrations\/oauth\/refresh":{"namespace":"sureforms\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"integration":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/native-integrations\/oauth\/refresh"}]}},"\/elementor-hello-elementor\/v1":{"namespace":"elementor-hello-elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"elementor-hello-elementor\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor-hello-elementor\/v1"}]}},"\/elementor-hello-elementor\/v1\/promotions":{"namespace":"elementor-hello-elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor-hello-elementor\/v1\/promotions"}]}},"\/elementor-hello-elementor\/v1\/admin-settings":{"namespace":"elementor-hello-elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor-hello-elementor\/v1\/admin-settings"}]}},"\/elementor-hello-elementor\/v1\/theme-settings":{"namespace":"elementor-hello-elementor\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor-hello-elementor\/v1\/theme-settings"}]}},"\/elementor-hello-elementor\/v1\/whats-new":{"namespace":"elementor-hello-elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor-hello-elementor\/v1\/whats-new"}]}},"\/elementor\/v1\/documents":{"namespace":"elementor\/v1\/documents","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"elementor\/v1\/documents","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor\/v1\/documents"}]}},"\/elementor\/v1\/documents\/(?P<id>\\d+)\/media\/import":{"namespace":"elementor\/v1\/documents","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"required":true}}}]},"\/elementor\/v1\/cache":{"namespace":"elementor\/v1","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor\/v1\/cache"}]}},"\/elementor\/v1\/globals":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor\/v1\/globals"}]}},"\/elementor\/v1\/globals\/colors":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor\/v1\/globals\/colors"}]}},"\/elementor\/v1\/globals\/colors\/(?P<id>[\\w-]+)":{"namespace":"elementor\/v1","methods":["GET","POST","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true}}},{"methods":["POST"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true}}}]},"\/elementor\/v1\/globals\/typography":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor\/v1\/globals\/typography"}]}},"\/elementor\/v1\/globals\/typography\/(?P<id>[\\w-]+)":{"namespace":"elementor\/v1","methods":["GET","POST","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true}}},{"methods":["POST"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true}}}]},"\/elementor\/v1\/settings\/(?P<key>[\\w_-]+)":{"namespace":"elementor\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":[]}]},"\/elementor\/v1\/post":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"included_types":{"description":"Included post types","type":"array","default":null,"required":false},"excluded_types":{"description":"Post type to exclude","type":"array","default":["e-floating-buttons","e-landing-page","elementor_library","attachment","revision","nav_menu_item","custom_css","customize_changeset"],"required":false},"term":{"description":"Posts to search","type":"string","default":"","required":false},"keys_conversion_map":{"description":"Specify keys to extract and convert, i.e. [\"key_1\" => \"new_key_1\"].","type":"array","default":{"ID":"id","post_title":"label","post_type":"groupLabel"},"required":false},"items_count":{"description":"Posts per page","type":"integer","default":100,"required":false},"is_public":{"description":"Whether to include only public post types","type":"boolean","default":true,"required":false},"meta_query":{"description":"WP_Query meta_query array","type":"array","default":null,"required":false},"tax_query":{"description":"WP_Query tax_query array","type":"array","default":null,"required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor\/v1\/post"}]}},"\/elementor\/v1\/term":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"included_types":{"description":"Included taxonomy containing terms (categories, tags, etc...)","type":"array","default":null,"required":false},"excluded_types":{"description":"Excluded taxonomy containing terms (categories, tags, etc...)","type":"array","default":null,"required":false},"term":{"description":"Terms to search","type":"string","default":"","required":false},"keys_conversion_map":{"description":"Specify keys to extract and convert, i.e. [\"key_1\" => \"new_key_1\"].","type":"array","default":{"term_id":"id","name":"label","taxonomy":"groupLabel"},"required":false},"items_count":{"description":"Terms per request","type":"integer","default":100,"required":false},"hide_empty":{"description":"Whether to include only public terms","type":"boolean","default":false,"required":false},"meta_query":{"description":"WP_Query meta_query array","type":"array","default":null,"required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor\/v1\/term"}]}},"\/elementor\/v1\/user":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"term":{"description":"Posts to search","type":"string","default":"","required":false},"keys_conversion_map":{"description":"Specify keys to extract and convert, i.e. [\"key_1\" => \"new_key_1\"].","type":["array","string"],"default":{"ID":"id","display_name":"label","role":"groupLabel"},"required":false},"items_count":{"description":"Posts per page","type":"integer","default":100,"required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor\/v1\/user"}]}},"\/elementor-ai\/v1":{"namespace":"elementor-ai\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"elementor-ai\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor-ai\/v1"}]}},"\/elementor-ai\/v1\/permissions":{"namespace":"elementor-ai\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor-ai\/v1\/permissions"}]}},"\/elementor\/v1\/favorites":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor\/v1\/favorites"}]}},"\/elementor\/v1\/favorites\/(?P<id>[\\w]+)":{"namespace":"elementor\/v1","methods":["POST","DELETE"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"Type of favorites.","type":"string","required":true},"favorite":{"description":"The favorite slug to create.","type":"string","required":true}}},{"methods":["DELETE"],"args":{"id":{"description":"Type of favorites.","type":"string","required":true},"favorite":{"description":"The favorite slug to delete.","type":"string","required":true}}}]},"\/elementor\/v1\/kit-elements-defaults":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor\/v1\/kit-elements-defaults"}]}},"\/elementor\/v1\/kit-elements-defaults\/(?P<type>[\\w\\-\\_]+)":{"namespace":"elementor\/v1","methods":["POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"type":{"type":"string","description":"The type of the element.","required":true},"settings":{"description":"All the default values for the requested type","type":"object","required":true}}},{"methods":["DELETE"],"args":{"type":{"type":"string","description":"The type of the element.","required":true}}}]},"\/elementor\/v1\/site-navigation\/recent-posts":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"posts_per_page":{"description":"Number of posts to return","type":"integer","required":true},"post_type":{"description":"Post types to retrieve","type":"array","default":["page","post","elementor_library"],"required":false},"post__not_in":{"description":"Post id`s to exclude","type":"array","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor\/v1\/site-navigation\/recent-posts"}]}},"\/elementor\/v1\/site-navigation\/add-new-post":{"namespace":"elementor\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"post_type":{"description":"Post type to create","type":"string","default":"post","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor\/v1\/site-navigation\/add-new-post"}]}},"\/elementor\/v1\/design-system-sync\/stylesheet":{"namespace":"elementor\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor\/v1\/design-system-sync\/stylesheet"}]}},"\/elementor\/v1\/checklist":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor\/v1\/checklist"}]}},"\/elementor\/v1\/checklist\/(?P<id>[\\d]+)":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true}}}]},"\/elementor\/v1\/checklist\/steps":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor\/v1\/checklist\/steps"}]}},"\/elementor\/v1\/checklist\/steps\/(?P<id>[\\d]+)":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true}}}]},"\/elementor\/v1\/checklist\/steps\/(?P<id>[\\w\\-\\_]+)":{"namespace":"elementor\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"id":{"type":"string","description":"The step id.","required":true}}}]},"\/elementor\/v1\/checklist\/user-progress":{"namespace":"elementor\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor\/v1\/checklist\/user-progress"}]}},"\/elementor\/v1\/operations\/opt-in-v4":{"namespace":"elementor\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor\/v1\/operations\/opt-in-v4"}]}},"\/elementor\/v1\/feedback":{"namespace":"elementor\/v1\/feedback","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"elementor\/v1\/feedback","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor\/v1\/feedback"}]}},"\/elementor\/v1\/feedback\/submit":{"namespace":"elementor\/v1\/feedback","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor\/v1\/feedback\/submit"}]}},"\/elementor\/v1\/template-library\/templates":{"namespace":"elementor\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":{"title":{"type":"string","description":"The title of the document","required":false},"type":{"description":"The document type.","type":"string","enum":["page","section","container","floating-buttons","popup","header","footer","single","single-post","single-page","archive","search-results","error-404","metabox_group_template","loop-item"],"required":true},"content":{"description":"Elementor data object","type":"object","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor\/v1\/template-library\/templates"}]}},"\/elementor\/v1\/user-data\/current-user":{"namespace":"elementor\/v1","methods":["GET","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["PATCH"],"args":{"suppressedMessages":{"type":"array","description":"Array of suppressed message keys","items":{"type":"string"},"required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor\/v1\/user-data\/current-user"}]}},"\/elementor\/v1\/onboarding":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor\/v1\/onboarding"}]}},"\/elementor\/v1\/onboarding\/user-progress":{"namespace":"elementor\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor\/v1\/onboarding\/user-progress"}]}},"\/elementor\/v1\/onboarding\/user-choices":{"namespace":"elementor\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor\/v1\/onboarding\/user-choices"}]}},"\/elementor\/v1\/onboarding\/pro-install-screen":{"namespace":"elementor\/v1","methods":["GET","GET"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor\/v1\/onboarding\/pro-install-screen"}]}},"\/elementor\/v1\/onboarding\/install-pro":{"namespace":"elementor\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor\/v1\/onboarding\/install-pro"}]}},"\/elementor\/v1\/onboarding\/install-theme":{"namespace":"elementor\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor\/v1\/onboarding\/install-theme"}]}},"\/elementor\/v1\/global-widget\/templates":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor\/v1\/global-widget\/templates"}]}},"\/elementor-pro\/v1\/posts-widget":{"namespace":"elementor-pro\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor-pro\/v1\/posts-widget"}]}},"\/elementor\/v1\/form-submissions":{"namespace":"elementor\/v1","methods":["GET","DELETE","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":50,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","additionalProperties":{"context":"filter"},"required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"order_by":{"description":"Sort collection by object attribute.","type":"string","default":"created_at","enum":["created_at","id","main_meta_id"],"required":false},"status":{"description":"Limit result set to submissions assigned one or more statuses.","type":"string","default":"all","enum":["all","unread","read","trash"],"additionalProperties":{"context":"filter"},"required":false},"form":{"description":"Limit result set to submissions assigned to specific forms. The form id should follow this pattern {post_id}_{element_id} e.g: 10_476d0ce","type":"string","additionalProperties":{"context":"filter"},"required":false},"referer":{"description":"Limit result set to submissions assigned to specific referer.","type":"string","additionalProperties":{"context":"filter"},"required":false},"after":{"description":"Limit response to submissions sent after a given ISO8601 compliant date.","type":"string","format":"date","additionalProperties":{"context":"filter"},"required":false},"before":{"description":"Limit response to submissions sent before a given ISO8601 compliant date.","type":"string","format":"date","additionalProperties":{"context":"filter"},"required":false}}},{"methods":["DELETE"],"args":{"ids":{"description":"Unique identifiers for the objects.","type":"array","items":{"type":"integer"},"required":true},"force":{"description":"Delete the object permanently.","type":"boolean","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"ids":{"description":"Unique identifiers for the objects.","type":"array","items":{"type":"integer"},"required":true},"is_read":{"description":"mark whether the submission was read or not","type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor\/v1\/form-submissions"}]}},"\/elementor\/v1\/form-submissions\/(?P<id>[\\d]+)":{"namespace":"elementor\/v1","methods":["GET","DELETE","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true},"force":{"description":"Delete the object permanently.","type":"boolean","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true},"is_read":{"description":"mark whether the submission was read or not","type":"boolean","required":false},"values":{"description":"Form field values, receive an array, the key should be the form field id and the value should be the value.","type":"object","required":false}}}]},"\/elementor\/v1\/form-submissions\/restore\/(?P<id>[\\d]+)":{"namespace":"elementor\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true}}}]},"\/elementor\/v1\/form-submissions\/restore":{"namespace":"elementor\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"ids":{"description":"Unique identifiers for the objects.","type":"array","items":{"type":"integer"},"required":true}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor\/v1\/form-submissions\/restore"}]}},"\/elementor\/v1\/form-submissions\/export":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":10000,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","additionalProperties":{"context":"filter"},"required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"order_by":{"description":"Sort collection by object attribute.","type":"string","default":"created_at","enum":["created_at","id","main_meta_id"],"required":false},"status":{"description":"Limit result set to submissions assigned one or more statuses.","type":"string","default":"all","enum":["all","unread","read","trash"],"additionalProperties":{"context":"filter"},"required":false},"form":{"description":"Limit result set to submissions assigned to specific forms. The form id should follow this pattern {post_id}_{element_id} e.g: 10_476d0ce","type":"string","additionalProperties":{"context":"filter"},"required":false},"referer":{"description":"Limit result set to submissions assigned to specific referer.","type":"string","additionalProperties":{"context":"filter"},"required":false},"after":{"description":"Limit response to submissions sent after a given ISO8601 compliant date.","type":"string","format":"date","additionalProperties":{"context":"filter"},"required":false},"before":{"description":"Limit response to submissions sent before a given ISO8601 compliant date.","type":"string","format":"date","additionalProperties":{"context":"filter"},"required":false},"ids":{"description":"Unique identifiers for the objects.","type":"array","items":{"type":"integer"},"additionalProperties":{"context":"filter"},"required":false},"format":{"description":"The format of the export (for now only csv).","enum":["csv"],"default":"csv","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor\/v1\/form-submissions\/export"}]}},"\/elementor\/v1\/form-submissions\/referer":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made, determines fields present in response. (only \"options\" available for now)","type":"string","enum":["options"],"default":"options","required":false},"search":{"description":"Limit results to those matching a string.","type":"string","additionalProperties":{"context":"filter"},"required":false},"value":{"description":"Limit results specific referer.","type":"string","additionalProperties":{"context":"filter"},"required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor\/v1\/form-submissions\/referer"}]}},"\/elementor\/v1\/forms":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made, determines fields present in response. (only \"options\" available for now)","type":"string","enum":["options"],"default":"options","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor\/v1\/forms"}]}},"\/elementor-pro\/v1\/get-post-type-taxonomies":{"namespace":"elementor-pro\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"post_type":{"description":"The post type for which to fetch the list of taxonomies.","type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor-pro\/v1\/get-post-type-taxonomies"}]}},"\/elementor-pro\/v1\/refresh-loop":{"namespace":"elementor-pro\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"post_id":{"description":"The post ID of the page containing the loop.","type":"integer","required":true},"widget_id":{"description":"The ID of the loop widget.","type":"string","required":true},"widget_filters":{"description":"The filters for the loop widget.","type":"object","required":true},"widget_model":{"description":"The model of the loop widget. In Editor mode only.","type":"object","required":false},"pagination_base_url":{"required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor-pro\/v1\/refresh-loop"}]}},"\/elementor-pro\/v1\/refresh-search":{"namespace":"elementor-pro\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"post_id":{"description":"The post ID of the page containing the loop.","type":"integer","required":true},"widget_id":{"description":"The ID of the loop widget.","type":"string","required":true},"widget_model":{"description":"The model of the loop widget. In Editor mode only.","type":"object","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor-pro\/v1\/refresh-search"}]}},"\/elementor\/v1\/notes":{"namespace":"elementor\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"route_url":{"type":"string","description":"The URL of the route where the note was created at.","required":false},"status":{"type":"string","description":"The note status (e.g. \"publish\", \"draft\").","enum":["publish","draft"],"default":"publish","required":false},"is_resolved":{"type":"boolean","description":"Whether the note is resolved or not.","required":false},"parent_id":{"type":"integer","description":"The note's parent id (use 0 for top-level).","required":false},"post_id":{"type":"integer","description":"The ID of the post that the note is attached to.","required":false},"only_unread":{"type":"boolean","description":"Show only unread notes (represents an unread thread if one of its replies is unread).","required":false},"only_relevant":{"type":"boolean","description":"Show only notes that are relevant to the current user.","required":false},"order_by":{"type":"string","description":"A column to order the results by.","default":"last_activity_at","enum":["last_activity_at","created_at"],"required":false},"order":{"type":"string","description":"Results order direction.","default":"desc","enum":["asc","desc"],"required":false}}},{"methods":["POST"],"args":{"post_id":{"type":"integer","description":"The id of the post where the note was created at (can be template, post, page, etc.).","required":true},"element_id":{"type":"string","description":"Each note must be attached to an elementor element.","required":true},"content":{"type":"string","description":"The content of the note.","required":true},"position":{"type":"object","properties":{"x":{"required":true,"type":"number"},"y":{"required":true,"type":"number"}},"description":"The position of the note.","required":true},"mentioned_usernames":{"type":"array","description":"List of user names that have been mentioned in the note's content.","default":[],"items":{"type":"string","sanitize_callback":{}},"required":false},"route_post_id":{"description":"The ID of the post that's associated with the route (doesn't always exist, e.g: home page, archive)","required":false},"route_url":{"type":"string","description":"The URL of the route where the note was created at.","required":false},"route_title":{"type":"string","description":"The title of the route where the note was created at.","required":false},"parent_id":{"type":"integer","description":"If the new note is a reply to another note, the parent_id should be the thread's id.","default":0,"required":false},"is_public":{"type":"boolean","description":"Should this note be visible for everyone or just for its author.","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor\/v1\/notes"}]}},"\/elementor\/v1\/notes\/read-status":{"namespace":"elementor\/v1","methods":["POST","DELETE"],"endpoints":[{"methods":["POST"],"args":{"ids":{"type":"array","description":"The id's of the notes.","items":{"type":"integer"},"required":true}}},{"methods":["DELETE"],"args":{"ids":{"type":"array","description":"The id's of the notes.","items":{"type":"integer"},"required":true}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor\/v1\/notes\/read-status"}]}},"\/elementor\/v1\/notes\/summary":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"route_url":{"type":"string","description":"The URL of the route where the note was created at.","required":false},"status":{"type":"string","description":"The note status (e.g. \"publish\", \"draft\").","enum":["publish","draft"],"default":"publish","required":false},"is_resolved":{"type":"boolean","description":"Whether the note is resolved or not.","required":false},"parent_id":{"type":"integer","description":"The note's parent id (use 0 for top-level).","required":false},"post_id":{"type":"integer","description":"The ID of the post that the note is attached to.","required":false},"only_unread":{"type":"boolean","description":"Show only unread notes (represents an unread thread if one of its replies is unread).","required":false},"only_relevant":{"type":"boolean","description":"Show only notes that are relevant to the current user.","required":false},"order_by":{"type":"string","description":"A column to order the results by.","default":"last_activity_at","enum":["last_activity_at","created_at"],"required":false},"order":{"type":"string","description":"Results order direction.","default":"desc","enum":["asc","desc"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor\/v1\/notes\/summary"}]}},"\/elementor\/v1\/notes\/users":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"limit":{"type":"integer","description":"Limit the results.","required":false},"order_by":{"type":"string","description":"A column to order the results by.","default":"display_name","enum":["user_nicename","display_name","user_registered"],"required":false},"order":{"type":"string","description":"Results order direction.","default":"asc","enum":["asc","desc"],"required":false},"search":{"type":"string","description":"Filter users by a search term.","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor\/v1\/notes\/users"}]}},"\/elementor\/v1\/notes\/(?P<id>[\\d]+)":{"namespace":"elementor\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"type":"integer","description":"Note ID to find.","required":true}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"type":"integer","description":"The id the note.","required":true},"content":{"type":"string","description":"The content of the note.","required":false},"mentioned_usernames":{"type":"array","description":"List of user names that have been mentioned in the note's content.","items":{"type":"string","sanitize_callback":{}},"required":false},"status":{"type":"string","description":"Note status can be draft or publish.","enum":["publish","draft"],"required":false},"is_public":{"type":"boolean","description":"Should this note be visible for everyone or just for its author.","required":false},"is_resolved":{"type":"boolean","description":"Is this note resolved and should be hidden.","required":false}}},{"methods":["DELETE"],"args":{"id":{"type":"integer","description":"The id of the note.","required":true},"force":{"type":"boolean","description":"Determine if it should be deleted permanently or change the status to trash.","default":false,"required":false}}}]},"\/mbb":{"namespace":"mbb","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"mbb","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/mbb"}]}},"\/mbb\/generate":{"namespace":"mbb","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/mbb\/generate"}]}},"\/mbb\/save":{"namespace":"mbb","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"post_id":{"required":true},"post_title":{"required":false},"post_name":{"required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/mbb\/save"}]}},"\/mbb\/theme-code-generate":{"namespace":"mbb","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/mbb\/theme-code-generate"}]}},"\/mbb\/fields-ids":{"namespace":"mbb","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET","POST","PUT","PATCH","DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/mbb\/fields-ids"}]}},"\/mbb\/field-types":{"namespace":"mbb","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET","POST","PUT","PATCH","DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/mbb\/field-types"}]}},"\/mbb\/field-html":{"namespace":"mbb","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET","POST","PUT","PATCH","DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/mbb\/field-html"}]}},"\/mbb\/json-data":{"namespace":"mbb","methods":["GET","POST","PUT","PATCH","DELETE","GET","POST","PUT","PATCH","DELETE","GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET","POST","PUT","PATCH","DELETE"],"args":[]},{"methods":["GET","POST","PUT","PATCH","DELETE"],"args":[]},{"methods":["GET","POST","PUT","PATCH","DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/mbb\/json-data"}]}},"\/mbb\/redirection-url":{"namespace":"mbb","methods":["GET","POST","PUT","PATCH","DELETE","GET","POST","PUT","PATCH","DELETE","GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET","POST","PUT","PATCH","DELETE"],"args":[]},{"methods":["GET","POST","PUT","PATCH","DELETE"],"args":[]},{"methods":["GET","POST","PUT","PATCH","DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/mbb\/redirection-url"}]}},"\/mbb\/set-json-data":{"namespace":"mbb","methods":["GET","POST","PUT","PATCH","DELETE","GET","POST","PUT","PATCH","DELETE","GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET","POST","PUT","PATCH","DELETE"],"args":[]},{"methods":["GET","POST","PUT","PATCH","DELETE"],"args":[]},{"methods":["GET","POST","PUT","PATCH","DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/mbb\/set-json-data"}]}},"\/mbb\/allowed-block-lists":{"namespace":"mbb","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":{"id":{"type":"string","description":"List ID (optional).","required":false},"name":{"type":"string","description":"List name.","required":true},"blocks":{"type":"array","description":"Array of block names.","items":{"type":"string"},"required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/mbb\/allowed-block-lists"}]}},"\/mbb\/allowed-block-lists\/(?P<id>[\\w-]+)":{"namespace":"mbb","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":[]}]},"\/mbb\/allowed-block-lists\/import":{"namespace":"mbb","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/mbb\/allowed-block-lists\/import"}]}},"\/mbb\/allowed-block-lists\/export":{"namespace":"mbb","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/mbb\/allowed-block-lists\/export"}]}},"\/mbb\/blocks":{"namespace":"mbb","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/mbb\/blocks"}]}},"\/mbb\/include-exclude":{"namespace":"mbb","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET","POST","PUT","PATCH","DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/mbb\/include-exclude"}]}},"\/mbb\/show-hide":{"namespace":"mbb","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET","POST","PUT","PATCH","DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/mbb\/show-hide"}]}},"\/mbb\/blocks\/json\/override":{"namespace":"mbb","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/mbb\/blocks\/json\/override"}]}},"\/mbb\/blocks\/json\/check-path":{"namespace":"mbb","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/mbb\/blocks\/json\/check-path"}]}},"\/mbb\/settings-page\/generate":{"namespace":"mbb","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/mbb\/settings-page\/generate"}]}},"\/mbb\/settings-page\/save":{"namespace":"mbb","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"post_id":{"required":true},"post_title":{"required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/mbb\/settings-page\/save"}]}},"\/mbb\/relationships\/generate":{"namespace":"mbb","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/mbb\/relationships\/generate"}]}},"\/mbb\/relationships\/save":{"namespace":"mbb","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"post_id":{"required":true},"post_title":{"required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/mbb\/relationships\/save"}]}},"\/slim-seo":{"namespace":"slim-seo","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"slim-seo","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo"}]}},"\/slim-seo\/meta-tags\/ai":{"namespace":"slim-seo","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo\/meta-tags\/ai"}]}},"\/slim-seo\/ai\/models":{"namespace":"slim-seo","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo\/ai\/models"}]}},"\/slim-seo\/meta-tags\/preview\/post-title":{"namespace":"slim-seo","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo\/meta-tags\/preview\/post-title"}]}},"\/slim-seo\/meta-tags\/preview\/term-title":{"namespace":"slim-seo","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo\/meta-tags\/preview\/term-title"}]}},"\/slim-seo\/meta-tags\/preview\/post-description":{"namespace":"slim-seo","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo\/meta-tags\/preview\/post-description"}]}},"\/slim-seo\/meta-tags\/preview\/term-description":{"namespace":"slim-seo","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo\/meta-tags\/preview\/term-description"}]}},"\/slim-seo\/meta-tags\/preview\/homepage":{"namespace":"slim-seo","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo\/meta-tags\/preview\/homepage"}]}},"\/slim-seo\/meta-tags\/option":{"namespace":"slim-seo","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo\/meta-tags\/option"}]}},"\/slim-seo\/meta-tags\/variables":{"namespace":"slim-seo","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo\/meta-tags\/variables"}]}},"\/slim-seo\/meta-tags\/image_variables":{"namespace":"slim-seo","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo\/meta-tags\/image_variables"}]}},"\/slim-seo\/meta-tags\/meta_keys":{"namespace":"slim-seo","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo\/meta-tags\/meta_keys"}]}},"\/slim-seo-redirection":{"namespace":"slim-seo-redirection","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"slim-seo-redirection","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-redirection"}]}},"\/slim-seo-redirection\/export":{"namespace":"slim-seo-redirection","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-redirection\/export"}]}},"\/slim-seo-redirection\/import":{"namespace":"slim-seo-redirection","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-redirection\/import"}]}},"\/slim-seo-redirection\/sample":{"namespace":"slim-seo-redirection","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-redirection\/sample"}]}},"\/slim-seo-redirection\/redirects":{"namespace":"slim-seo-redirection","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-redirection\/redirects"}]}},"\/slim-seo-redirection\/exists":{"namespace":"slim-seo-redirection","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-redirection\/exists"}]}},"\/slim-seo-redirection\/update_redirect":{"namespace":"slim-seo-redirection","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-redirection\/update_redirect"}]}},"\/slim-seo-redirection\/delete_redirects":{"namespace":"slim-seo-redirection","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-redirection\/delete_redirects"}]}},"\/slim-seo-redirection\/posts":{"namespace":"slim-seo-redirection","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/slim-seo-redirection\/posts"}]}},"\/mb-blocks\/v1":{"namespace":"mb-blocks\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"mb-blocks\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/mb-blocks\/v1"}]}},"\/mb-blocks\/v1\/block\/(?P<id>.+)\/get_form":{"namespace":"mb-blocks\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}]},"\/mb-relationships\/v1":{"namespace":"mb-relationships\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"mb-relationships\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/mb-relationships\/v1"}]}},"\/mb-relationships\/v1\/(?P<relationship>[a-zA-Z0-9-_]+)\/exists":{"namespace":"mb-relationships\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"relationship":{"description":"The ID of the relationship","type":"string","enum":[],"required":true},"from":{"description":"The ID of \u201cfrom\u201d resource","type":"integer","required":true},"to":{"description":"The ID of \u201cto\u201d resource","type":"integer","required":true}}}]},"\/mb-relationships\/v1\/(?P<relationship>[a-zA-Z0-9-_]+)\/connected-from\/(?P<from>[\\d]+)":{"namespace":"mb-relationships\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"relationship":{"description":"The ID of the relationship","type":"string","enum":[],"required":true},"from":{"description":"The ID of \u201cfrom\u201d resource","type":"integer","required":true}}}]},"\/mb-relationships\/v1\/(?P<relationship>[a-zA-Z0-9-_]+)\/connected-to\/(?P<to>[\\d]+)":{"namespace":"mb-relationships\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"relationship":{"description":"The ID of the relationship","type":"string","enum":[],"required":true},"to":{"description":"The ID of \u201cto\u201d resource","type":"integer","required":true}}}]},"\/mb-relationships\/v1\/(?P<relationship>[a-zA-Z0-9-_]+)":{"namespace":"mb-relationships\/v1","methods":["POST","DELETE"],"endpoints":[{"methods":["POST"],"args":{"relationship":{"description":"The ID of the relationship","type":"string","enum":[],"required":true},"from":{"description":"The ID of \u201cfrom\u201d resource","type":"integer","required":true},"to":{"description":"The ID of \u201cto\u201d resource","type":"integer","required":true},"order_from":{"description":"The order of the \u201cfrom\u201d resource; defaults to \u201c1\u201d","type":"integer","required":false},"order_to":{"description":"The order of the \u201cto\u201d resource; defaults to \u201c1\u201d","type":"integer","required":false}}},{"methods":["DELETE"],"args":{"relationship":{"description":"The ID of the relationship","type":"string","enum":[],"required":true},"from":{"description":"The ID of \u201cfrom\u201d resource","type":"integer","required":true},"to":{"description":"The ID of \u201cto\u201d resource","type":"integer","required":true}}}]},"\/meta-box\/v1":{"namespace":"meta-box\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"meta-box\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/meta-box\/v1"}]}},"\/meta-box\/v1\/settings-page":{"namespace":"meta-box\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/meta-box\/v1\/settings-page"}]}},"\/mbv":{"namespace":"mbv","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"mbv","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/mbv"}]}},"\/mbv\/meta-boxes":{"namespace":"mbv","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"object_type":{"required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/mbv\/meta-boxes"}]}},"\/mbv\/views":{"namespace":"mbv","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/mbv\/views"}]}},"\/mbv\/relationships":{"namespace":"mbv","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/mbv\/relationships"}]}},"\/mbv\/location":{"namespace":"mbv\/location","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"mbv\/location","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/mbv\/location"}]}},"\/mbv\/location\/terms":{"namespace":"mbv\/location","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"required":false},"term":{"required":false},"selected":{"required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/mbv\/location\/terms"}]}},"\/mbv\/location\/posts":{"namespace":"mbv\/location","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"required":false},"term":{"required":false},"selected":{"required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/mbv\/location\/posts"}]}},"\/mbv\/list":{"namespace":"mbv","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/mbv\/list"}]}},"\/sureforms-pro\/v1":{"namespace":"sureforms-pro\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"sureforms-pro\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms-pro\/v1"}]}},"\/sureforms-pro\/v1\/global-settings":{"namespace":"sureforms-pro\/v1","methods":["POST","PUT","PATCH","GET"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]},{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms-pro\/v1\/global-settings"}]}},"\/sureforms-pro":{"namespace":"sureforms-pro","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"sureforms-pro","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms-pro"}]}},"\/sureforms-pro\/paypal-test-webhook":{"namespace":"sureforms-pro","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms-pro\/paypal-test-webhook"}]}},"\/sureforms-pro\/paypal-live-webhook":{"namespace":"sureforms-pro","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms-pro\/paypal-live-webhook"}]}},"\/sureforms\/v1\/payments\/stripe-connect":{"namespace":"sureforms\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/payments\/stripe-connect"}]}},"\/sureforms\/v1\/payments\/stripe-disconnect":{"namespace":"sureforms\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/payments\/stripe-disconnect"}]}},"\/sureforms\/v1\/payments\/stripe-callback":{"namespace":"sureforms\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/payments\/stripe-callback"}]}},"\/sureforms\/v1\/payments\/create-payment-webhook":{"namespace":"sureforms\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/payments\/create-payment-webhook"}]}},"\/sureforms":{"namespace":"sureforms","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"sureforms","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms"}]}},"\/sureforms\/webhook_test":{"namespace":"sureforms","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/webhook_test"}]}},"\/sureforms\/webhook_live":{"namespace":"sureforms","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/webhook_live"}]}},"\/sureforms\/v1\/get-learn-chapters":{"namespace":"sureforms\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/get-learn-chapters"}]}},"\/sureforms\/v1\/update-learn-progress":{"namespace":"sureforms\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"chapterId":{"type":"string","required":true},"stepId":{"type":"string","required":true},"completed":{"type":"boolean","required":true}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/sureforms\/v1\/update-learn-progress"}]}},"\/suremembers\/v1":{"namespace":"suremembers\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"suremembers\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/suremembers\/v1"}]}},"\/suremembers\/v1\/fetch-posts":{"namespace":"suremembers\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/suremembers\/v1\/fetch-posts"}]}},"\/suremembers\/v1\/fetch-adminbar-groups":{"namespace":"suremembers\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/suremembers\/v1\/fetch-adminbar-groups"}]}},"\/suremembers\/v1\/search-posts":{"namespace":"suremembers\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/suremembers\/v1\/search-posts"}]}},"\/suremembers\/v1\/update-status":{"namespace":"suremembers\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/suremembers\/v1\/update-status"}]}},"\/suremembers\/v1\/submit-form":{"namespace":"suremembers\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/suremembers\/v1\/submit-form"}]}},"\/suremembers\/v1\/save-downloads":{"namespace":"suremembers\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/suremembers\/v1\/save-downloads"}]}},"\/suremembers\/v1\/get-table-data":{"namespace":"suremembers\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/suremembers\/v1\/get-table-data"}]}},"\/suremembers\/v1\/get-post-data":{"namespace":"suremembers\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/suremembers\/v1\/get-post-data"}]}},"\/suremembers\/v1\/delete-membership":{"namespace":"suremembers\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/suremembers\/v1\/delete-membership"}]}},"\/suremembers\/v1\/get-users-data":{"namespace":"suremembers\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/suremembers\/v1\/get-users-data"}]}},"\/suremembers\/v1\/get-all-memberships":{"namespace":"suremembers\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/suremembers\/v1\/get-all-memberships"}]}},"\/suremembers\/v1\/get-user-details":{"namespace":"suremembers\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/suremembers\/v1\/get-user-details"}]}},"\/suremembers\/v1\/grant-membership":{"namespace":"suremembers\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/suremembers\/v1\/grant-membership"}]}},"\/suremembers\/v1\/revoke-membership":{"namespace":"suremembers\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/suremembers\/v1\/revoke-membership"}]}},"\/suremembers\/v1\/update-membership-expiration":{"namespace":"suremembers\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/suremembers\/v1\/update-membership-expiration"}]}},"\/suremembers\/v1\/remove-membership":{"namespace":"suremembers\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/suremembers\/v1\/remove-membership"}]}},"\/suremembers\/v1\/get-global-settings":{"namespace":"suremembers\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/suremembers\/v1\/get-global-settings"}]}},"\/suremembers\/v1\/update-global-settings":{"namespace":"suremembers\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/suremembers\/v1\/update-global-settings"}]}},"\/suremembers\/v1\/update-email-template":{"namespace":"suremembers\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/suremembers\/v1\/update-email-template"}]}},"\/suremembers\/v1\/add-user-role":{"namespace":"suremembers\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/suremembers\/v1\/add-user-role"}]}},"\/suremembers\/v1\/remove-user-role":{"namespace":"suremembers\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/suremembers\/v1\/remove-user-role"}]}},"\/suremembers\/v1\/update-user-role":{"namespace":"suremembers\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/suremembers\/v1\/update-user-role"}]}},"\/suremembers\/v1\/search-access-groups":{"namespace":"suremembers\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/suremembers\/v1\/search-access-groups"}]}},"\/suremembers\/v1\/save-redirection-rules":{"namespace":"suremembers\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/suremembers\/v1\/save-redirection-rules"}]}},"\/suremembers\/v1\/activate-license":{"namespace":"suremembers\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/suremembers\/v1\/activate-license"}]}},"\/suremembers\/v1\/deactivate-license":{"namespace":"suremembers\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/suremembers\/v1\/deactivate-license"}]}},"\/suremembers\/v1\/import-users":{"namespace":"suremembers\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/suremembers\/v1\/import-users"}]}},"\/suremembers\/v1\/send-test-email":{"namespace":"suremembers\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/suremembers\/v1\/send-test-email"}]}},"\/suremembers\/v1\/skip-onboarding":{"namespace":"suremembers\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/suremembers\/v1\/skip-onboarding"}]}},"\/suremembers\/v1\/complete-onboarding":{"namespace":"suremembers\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/suremembers\/v1\/complete-onboarding"}]}},"\/suremembers\/v1\/process-onboarding":{"namespace":"suremembers\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/suremembers\/v1\/process-onboarding"}]}},"\/suremembers\/v1\/activate-plugin":{"namespace":"suremembers\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/suremembers\/v1\/activate-plugin"}]}},"\/mbfs":{"namespace":"mbfs","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"mbfs","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/mbfs"}]}},"\/mbfs\/dashboard\/delete":{"namespace":"mbfs","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":{"id":{"type":"integer","required":true}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/mbfs\/dashboard\/delete"}]}},"\/elementor\/v1\/library\/connect":{"namespace":"elementor\/v1","methods":["POST","DELETE"],"endpoints":[{"methods":["POST"],"args":{"token":{"type":"string","description":"Connect CLI token","required":true}}},{"methods":["DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor\/v1\/library\/connect"}]}},"\/elementor\/v1\/send-event":{"namespace":"elementor\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false}}},{"methods":["POST"],"args":{"event_data":{"description":"All the recorded event data in JSON format","type":"object","required":true}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/elementor\/v1\/send-event"}]}},"\/wp\/v2":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp\/v2","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2"}]}},"\/wp\/v2\/posts":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","suremembers_archive","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"categories":{"description":"Limit result set to items with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"categories_exclude":{"description":"Limit result set to items except those with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"tags":{"description":"Limit result set to items with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"tags_exclude":{"description":"Limit result set to items except those with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"asset-type":{"description":"Limit result set to items with specific terms assigned in the asset-type taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"asset-type_exclude":{"description":"Limit result set to items except those with specific terms assigned in the asset-type taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"sticky":{"description":"Limit result set to items that are sticky.","type":"boolean","required":false},"ignore_sticky":{"description":"Whether to ignore sticky posts or not.","type":"boolean","default":true,"required":false},"format":{"description":"Limit result set to items assigned one or more given formats.","type":"array","uniqueItems":true,"items":{"enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"format":{"description":"The format for the post.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"slim_seo":{"type":"object","title":"","description":"Search Engine Optimization","default":[],"properties":{"title":{"type":"string"},"description":{"type":"string"},"facebook_image":{"type":"string"},"twitter_image":{"type":"string"},"canonical":{"type":"string"},"noindex":{"type":"boolean"}},"additionalProperties":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"sticky":{"description":"Whether or not the post should be treated as sticky.","type":"boolean","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"asset-type":{"description":"The terms assigned to the post in the asset-type taxonomy.","type":"array","items":{"type":"integer"},"required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2\/posts"}]}},"\/wp\/v2\/posts\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"format":{"description":"The format for the post.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"slim_seo":{"type":"object","title":"","description":"Search Engine Optimization","default":[],"properties":{"title":{"type":"string"},"description":{"type":"string"},"facebook_image":{"type":"string"},"twitter_image":{"type":"string"},"canonical":{"type":"string"},"noindex":{"type":"boolean"}},"additionalProperties":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"sticky":{"description":"Whether or not the post should be treated as sticky.","type":"boolean","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"asset-type":{"description":"The terms assigned to the post in the asset-type taxonomy.","type":"array","items":{"type":"integer"},"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/posts\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/posts\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/posts\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"format":{"description":"The format for the post.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"slim_seo":{"type":"object","title":"","description":"Search Engine Optimization","default":[],"properties":{"title":{"type":"string"},"description":{"type":"string"},"facebook_image":{"type":"string"},"twitter_image":{"type":"string"},"canonical":{"type":"string"},"noindex":{"type":"boolean"}},"additionalProperties":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"sticky":{"description":"Whether or not the post should be treated as sticky.","type":"boolean","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"asset-type":{"description":"The terms assigned to the post in the asset-type taxonomy.","type":"array","items":{"type":"integer"},"required":false}}}]},"\/wp\/v2\/posts\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/pages":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order"],"required":false},"parent":{"description":"Limit result set to items with particular parent IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"parent_exclude":{"description":"Limit result set to all items except those of a particular parent ID.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","suremembers_archive","any"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"slim_seo":{"type":"object","title":"","description":"Search Engine Optimization","default":[],"properties":{"title":{"type":"string"},"description":{"type":"string"},"facebook_image":{"type":"string"},"twitter_image":{"type":"string"},"canonical":{"type":"string"},"noindex":{"type":"boolean"}},"additionalProperties":false},"footnotes":{"type":"string","title":"","description":"","default":""},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","kit","not-supported","page","section","container","floating-buttons","cloud-template-preview","widget","popup","header","footer","single","single-post","single-page","archive","search-results","error-404","code_snippet","metabox_group_template","loop-item",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]},"_elementor_conditions":{"type":"array","title":"","description":"Elementor conditions","default":[],"additionalProperties":true,"context":["edit"]}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2\/pages"}]}},"\/wp\/v2\/pages\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"slim_seo":{"type":"object","title":"","description":"Search Engine Optimization","default":[],"properties":{"title":{"type":"string"},"description":{"type":"string"},"facebook_image":{"type":"string"},"twitter_image":{"type":"string"},"canonical":{"type":"string"},"noindex":{"type":"boolean"}},"additionalProperties":false},"footnotes":{"type":"string","title":"","description":"","default":""},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","kit","not-supported","page","section","container","floating-buttons","cloud-template-preview","widget","popup","header","footer","single","single-post","single-page","archive","search-results","error-404","code_snippet","metabox_group_template","loop-item",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]},"_elementor_conditions":{"type":"array","title":"","description":"Elementor conditions","default":[],"additionalProperties":true,"context":["edit"]}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/pages\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/pages\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/pages\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"slim_seo":{"type":"object","title":"","description":"Search Engine Optimization","default":[],"properties":{"title":{"type":"string"},"description":{"type":"string"},"facebook_image":{"type":"string"},"twitter_image":{"type":"string"},"canonical":{"type":"string"},"noindex":{"type":"boolean"}},"additionalProperties":false},"footnotes":{"type":"string","title":"","description":"","default":""},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","kit","not-supported","page","section","container","floating-buttons","cloud-template-preview","widget","popup","header","footer","single","single-post","single-page","archive","search-results","error-404","code_snippet","metabox_group_template","loop-item",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]},"_elementor_conditions":{"type":"array","title":"","description":"Elementor conditions","default":[],"additionalProperties":true,"context":["edit"]}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}]},"\/wp\/v2\/pages\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/media":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"parent":{"description":"Limit result set to items with particular parent IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"parent_exclude":{"description":"Limit result set to all items except those of a particular parent ID.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"inherit","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["inherit","private","trash"],"type":"string"},"required":false},"media_type":{"default":null,"description":"Limit result set to attachments of a particular media type or media types.","type":"array","items":{"type":"string","enum":["image","video","text","application","audio"]},"required":false},"mime_type":{"default":null,"description":"Limit result set to attachments of a particular MIME type or MIME types.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"slim_seo":{"type":"object","title":"","description":"Search Engine Optimization","default":[],"properties":{"title":{"type":"string"},"description":{"type":"string"},"facebook_image":{"type":"string"},"twitter_image":{"type":"string"},"canonical":{"type":"string"},"noindex":{"type":"boolean"}},"additionalProperties":false}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"alt_text":{"description":"Alternative text to display when attachment is not displayed.","type":"string","required":false},"caption":{"description":"The attachment caption.","type":"object","properties":{"raw":{"description":"Caption for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML caption for the attachment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"The attachment description.","type":"object","properties":{"raw":{"description":"Description for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML description for the attachment, transformed for display.","type":"string","context":["view","edit"],"readonly":true}},"required":false},"post":{"description":"The ID for the associated post of the attachment.","type":"integer","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2\/media"}]}},"\/wp\/v2\/media\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"slim_seo":{"type":"object","title":"","description":"Search Engine Optimization","default":[],"properties":{"title":{"type":"string"},"description":{"type":"string"},"facebook_image":{"type":"string"},"twitter_image":{"type":"string"},"canonical":{"type":"string"},"noindex":{"type":"boolean"}},"additionalProperties":false}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"alt_text":{"description":"Alternative text to display when attachment is not displayed.","type":"string","required":false},"caption":{"description":"The attachment caption.","type":"object","properties":{"raw":{"description":"Caption for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML caption for the attachment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"The attachment description.","type":"object","properties":{"raw":{"description":"Description for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML description for the attachment, transformed for display.","type":"string","context":["view","edit"],"readonly":true}},"required":false},"post":{"description":"The ID for the associated post of the attachment.","type":"integer","required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/media\/(?P<id>[\\d]+)\/post-process":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"Unique identifier for the attachment.","type":"integer","required":false},"action":{"type":"string","enum":["create-image-subsizes"],"required":true}}}]},"\/wp\/v2\/media\/(?P<id>[\\d]+)\/edit":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"src":{"description":"URL to the edited image file.","type":"string","format":"uri","required":true},"modifiers":{"description":"Array of image edits.","type":"array","minItems":1,"items":{"description":"Image edit.","type":"object","required":["type","args"],"oneOf":[{"title":"Flip","properties":{"type":{"description":"Flip type.","type":"string","enum":["flip"]},"args":{"description":"Flip arguments.","type":"object","required":["flip"],"properties":{"flip":{"description":"Flip direction.","type":"object","required":["horizontal","vertical"],"properties":{"horizontal":{"description":"Whether to flip in the horizontal direction.","type":"boolean"},"vertical":{"description":"Whether to flip in the vertical direction.","type":"boolean"}}}}}}},{"title":"Rotation","properties":{"type":{"description":"Rotation type.","type":"string","enum":["rotate"]},"args":{"description":"Rotation arguments.","type":"object","required":["angle"],"properties":{"angle":{"description":"Angle to rotate clockwise in degrees.","type":"number"}}}}},{"title":"Crop","properties":{"type":{"description":"Crop type.","type":"string","enum":["crop"]},"args":{"description":"Crop arguments.","type":"object","required":["left","top","width","height"],"properties":{"left":{"description":"Horizontal position from the left to begin the crop as a percentage of the image width.","type":"number"},"top":{"description":"Vertical position from the top to begin the crop as a percentage of the image height.","type":"number"},"width":{"description":"Width of the crop as a percentage of the image width.","type":"number"},"height":{"description":"Height of the crop as a percentage of the image height.","type":"number"}}}}}]},"required":false},"rotation":{"description":"The amount to rotate the image clockwise in degrees. DEPRECATED: Use `modifiers` instead.","type":"integer","minimum":0,"exclusiveMinimum":true,"maximum":360,"exclusiveMaximum":true,"required":false},"x":{"description":"As a percentage of the image, the x position to start the crop from. DEPRECATED: Use `modifiers` instead.","type":"number","minimum":0,"maximum":100,"required":false},"y":{"description":"As a percentage of the image, the y position to start the crop from. DEPRECATED: Use `modifiers` instead.","type":"number","minimum":0,"maximum":100,"required":false},"width":{"description":"As a percentage of the image, the width to crop the image to. DEPRECATED: Use `modifiers` instead.","type":"number","minimum":0,"maximum":100,"required":false},"height":{"description":"As a percentage of the image, the height to crop the image to. DEPRECATED: Use `modifiers` instead.","type":"number","minimum":0,"maximum":100,"required":false},"caption":{"description":"The attachment caption.","type":"object","properties":{"raw":{"description":"Caption for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML caption for the attachment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"The attachment description.","type":"object","properties":{"raw":{"description":"Description for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML description for the attachment, transformed for display.","type":"string","context":["view","edit"],"readonly":true}},"required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"post":{"description":"The ID for the associated post of the attachment.","type":"integer","required":false},"alt_text":{"description":"Alternative text to display when attachment is not displayed.","type":"string","required":false}}}]},"\/wp\/v2\/menu-items":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":100,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"menu_order","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","suremembers_archive","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"menus":{"description":"Limit result set to items with specific terms assigned in the menus taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"menus_exclude":{"description":"Limit result set to items except those with specific terms assigned in the menus taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"title":{"description":"The title for the object.","type":["string","object"],"properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"type":{"default":"custom","description":"The family of objects originally represented, such as \"post_type\" or \"taxonomy\".","type":"string","enum":["taxonomy","post_type","post_type_archive","custom"],"required":false},"status":{"default":"publish","description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"parent":{"default":0,"description":"The ID for the parent of the object.","type":"integer","minimum":0,"required":false},"attr_title":{"description":"Text for the title attribute of the link element for this menu item.","type":"string","required":false},"classes":{"description":"Class names for the link element of this menu item.","type":"array","items":{"type":"string"},"required":false},"description":{"description":"The description of this menu item.","type":"string","required":false},"menu_order":{"default":1,"description":"The DB ID of the nav_menu_item that is this item's menu parent, if any, otherwise 0.","type":"integer","minimum":1,"required":false},"object":{"description":"The type of object originally represented, such as \"category\", \"post\", or \"attachment\".","type":"string","required":false},"object_id":{"default":0,"description":"The database ID of the original object this menu item represents, for example the ID for posts or the term_id for categories.","type":"integer","minimum":0,"required":false},"target":{"description":"The target attribute of the link element for this menu item.","type":"string","enum":["_blank",""],"required":false},"url":{"description":"The URL to which this menu item points.","type":"string","format":"uri","required":false},"xfn":{"description":"The XFN relationship expressed in the link of this menu item.","type":"array","items":{"type":"string"},"required":false},"menus":{"description":"The terms assigned to the object in the nav_menu taxonomy.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"slim_seo":{"type":"object","title":"","description":"Search Engine Optimization","default":[],"properties":{"title":{"type":"string"},"description":{"type":"string"},"facebook_image":{"type":"string"},"twitter_image":{"type":"string"},"canonical":{"type":"string"},"noindex":{"type":"boolean"}},"additionalProperties":false}},"required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2\/menu-items"}]}},"\/wp\/v2\/menu-items\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"title":{"description":"The title for the object.","type":["string","object"],"properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"type":{"description":"The family of objects originally represented, such as \"post_type\" or \"taxonomy\".","type":"string","enum":["taxonomy","post_type","post_type_archive","custom"],"required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"parent":{"description":"The ID for the parent of the object.","type":"integer","minimum":0,"required":false},"attr_title":{"description":"Text for the title attribute of the link element for this menu item.","type":"string","required":false},"classes":{"description":"Class names for the link element of this menu item.","type":"array","items":{"type":"string"},"required":false},"description":{"description":"The description of this menu item.","type":"string","required":false},"menu_order":{"description":"The DB ID of the nav_menu_item that is this item's menu parent, if any, otherwise 0.","type":"integer","minimum":1,"required":false},"object":{"description":"The type of object originally represented, such as \"category\", \"post\", or \"attachment\".","type":"string","required":false},"object_id":{"description":"The database ID of the original object this menu item represents, for example the ID for posts or the term_id for categories.","type":"integer","minimum":0,"required":false},"target":{"description":"The target attribute of the link element for this menu item.","type":"string","enum":["_blank",""],"required":false},"url":{"description":"The URL to which this menu item points.","type":"string","format":"uri","required":false},"xfn":{"description":"The XFN relationship expressed in the link of this menu item.","type":"array","items":{"type":"string"},"required":false},"menus":{"description":"The terms assigned to the object in the nav_menu taxonomy.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"slim_seo":{"type":"object","title":"","description":"Search Engine Optimization","default":[],"properties":{"title":{"type":"string"},"description":{"type":"string"},"facebook_image":{"type":"string"},"twitter_image":{"type":"string"},"canonical":{"type":"string"},"noindex":{"type":"boolean"}},"additionalProperties":false}},"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/menu-items\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the object.","type":"integer","minimum":0,"required":false},"title":{"description":"The title for the object.","type":["string","object"],"properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"type":{"description":"The family of objects originally represented, such as \"post_type\" or \"taxonomy\".","type":"string","enum":["taxonomy","post_type","post_type_archive","custom"],"required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"attr_title":{"description":"Text for the title attribute of the link element for this menu item.","type":"string","required":false},"classes":{"description":"Class names for the link element of this menu item.","type":"array","items":{"type":"string"},"required":false},"description":{"description":"The description of this menu item.","type":"string","required":false},"menu_order":{"description":"The DB ID of the nav_menu_item that is this item's menu parent, if any, otherwise 0.","type":"integer","minimum":1,"required":false},"object":{"description":"The type of object originally represented, such as \"category\", \"post\", or \"attachment\".","type":"string","required":false},"object_id":{"description":"The database ID of the original object this menu item represents, for example the ID for posts or the term_id for categories.","type":"integer","minimum":0,"required":false},"target":{"description":"The target attribute of the link element for this menu item.","type":"string","enum":["_blank",""],"required":false},"url":{"description":"The URL to which this menu item points.","type":"string","format":"uri","required":false},"xfn":{"description":"The XFN relationship expressed in the link of this menu item.","type":"array","items":{"type":"string"},"required":false},"menus":{"description":"The terms assigned to the object in the nav_menu taxonomy.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"slim_seo":{"type":"object","title":"","description":"Search Engine Optimization","default":[],"properties":{"title":{"type":"string"},"description":{"type":"string"},"facebook_image":{"type":"string"},"twitter_image":{"type":"string"},"canonical":{"type":"string"},"noindex":{"type":"boolean"}},"additionalProperties":false}},"required":false}}}]},"\/wp\/v2\/menu-items\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/blocks":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","suremembers_archive","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"wp_pattern_category":{"description":"Limit result set to items with specific terms assigned in the wp_pattern_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"wp_pattern_category_exclude":{"description":"Limit result set to items except those with specific terms assigned in the wp_pattern_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["view","edit"]}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"slim_seo":{"type":"object","title":"","description":"Search Engine Optimization","default":[],"properties":{"title":{"type":"string"},"description":{"type":"string"},"facebook_image":{"type":"string"},"twitter_image":{"type":"string"},"canonical":{"type":"string"},"noindex":{"type":"boolean"}},"additionalProperties":false},"wp_pattern_sync_status":{"type":"string","title":"","description":"","default":"","enum":["partial","unsynced"]},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wp_pattern_category":{"description":"The terms assigned to the post in the wp_pattern_category taxonomy.","type":"array","items":{"type":"integer"},"required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2\/blocks"}]}},"\/wp\/v2\/blocks\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["view","edit"]}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"slim_seo":{"type":"object","title":"","description":"Search Engine Optimization","default":[],"properties":{"title":{"type":"string"},"description":{"type":"string"},"facebook_image":{"type":"string"},"twitter_image":{"type":"string"},"canonical":{"type":"string"},"noindex":{"type":"boolean"}},"additionalProperties":false},"wp_pattern_sync_status":{"type":"string","title":"","description":"","default":"","enum":["partial","unsynced"]},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wp_pattern_category":{"description":"The terms assigned to the post in the wp_pattern_category taxonomy.","type":"array","items":{"type":"integer"},"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/blocks\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/blocks\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/blocks\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["view","edit"]}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"slim_seo":{"type":"object","title":"","description":"Search Engine Optimization","default":[],"properties":{"title":{"type":"string"},"description":{"type":"string"},"facebook_image":{"type":"string"},"twitter_image":{"type":"string"},"canonical":{"type":"string"},"noindex":{"type":"boolean"}},"additionalProperties":false},"wp_pattern_sync_status":{"type":"string","title":"","description":"","default":"","enum":["partial","unsynced"]},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wp_pattern_category":{"description":"The terms assigned to the post in the wp_pattern_category taxonomy.","type":"array","items":{"type":"integer"},"required":false}}}]},"\/wp\/v2\/blocks\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/templates\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/templates\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/templates\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description of template.","type":"string","required":false},"status":{"description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false}}}]},"\/wp\/v2\/templates\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/templates":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wp_id":{"description":"Limit to the specified post id.","type":"integer","required":false},"area":{"description":"Limit to the specified template part area.","type":"string","required":false},"post_type":{"description":"Post type to get the templates for.","type":"string","required":false}}},{"methods":["POST"],"args":{"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":true},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"default":"","description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"default":"","description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"default":"","description":"Description of template.","type":"string","required":false},"status":{"default":"publish","description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2\/templates"}]}},"\/wp\/v2\/templates\/lookup":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"description":"The slug of the template to get the fallback for","type":"string","required":true},"is_custom":{"description":"Indicates if a template is custom or part of the template hierarchy","type":"boolean","required":false},"template_prefix":{"description":"The template prefix for the created template. This is used to extract the main template type, e.g. in `taxonomy-books` extracts the `taxonomy`","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2\/templates\/lookup"}]}},"\/wp\/v2\/templates\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description of template.","type":"string","required":false},"status":{"description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/template-parts\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/template-parts\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/template-parts\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description of template.","type":"string","required":false},"status":{"description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false},"area":{"description":"Where the template part is intended for use (header, footer, etc.)","type":"string","required":false}}}]},"\/wp\/v2\/template-parts\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/template-parts":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wp_id":{"description":"Limit to the specified post id.","type":"integer","required":false},"area":{"description":"Limit to the specified template part area.","type":"string","required":false},"post_type":{"description":"Post type to get the templates for.","type":"string","required":false}}},{"methods":["POST"],"args":{"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":true},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"default":"","description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"default":"","description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"default":"","description":"Description of template.","type":"string","required":false},"status":{"default":"publish","description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false},"area":{"description":"Where the template part is intended for use (header, footer, etc.)","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2\/template-parts"}]}},"\/wp\/v2\/template-parts\/lookup":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"description":"The slug of the template to get the fallback for","type":"string","required":true},"is_custom":{"description":"Indicates if a template is custom or part of the template hierarchy","type":"boolean","required":false},"template_prefix":{"description":"The template prefix for the created template. This is used to extract the main template type, e.g. in `taxonomy-books` extracts the `taxonomy`","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2\/template-parts\/lookup"}]}},"\/wp\/v2\/template-parts\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description of template.","type":"string","required":false},"status":{"description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false},"area":{"description":"Where the template part is intended for use (header, footer, etc.)","type":"string","required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/global-styles\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false}}}]},"\/wp\/v2\/global-styles\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the global styles revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the global styles revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/global-styles\/themes\/(?P<stylesheet>[\\\/\\s%\\w\\.\\(\\)\\[\\]\\@_\\-]+)\/variations":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":false},"args":{"stylesheet":{"description":"The theme identifier","type":"string","required":false}}}]},"\/wp\/v2\/global-styles\/themes\/(?P<stylesheet>[^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":false},"args":{"stylesheet":{"description":"The theme identifier","type":"string","required":false}}}]},"\/wp\/v2\/global-styles\/(?P<id>[\\\/\\d+]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":false},"args":{"id":{"description":"ID of global styles config.","type":"integer","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":false},"args":{"styles":{"description":"Global styles.","type":["object"],"required":false},"settings":{"description":"Global settings.","type":["object"],"required":false},"title":{"description":"Title of the global styles variation.","type":["object","string"],"properties":{"raw":{"description":"Title for the global styles variation, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false}}}]},"\/wp\/v2\/navigation":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","suremembers_archive","any"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit","embed"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2\/navigation"}]}},"\/wp\/v2\/navigation\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit","embed"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/navigation\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/navigation\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/navigation\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit","embed"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}]},"\/wp\/v2\/navigation\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/font-families":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"id","enum":["id","include"],"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"args":{"theme_json_version":{"description":"Version of the theme.json schema used for the typography settings.","type":"integer","default":3,"minimum":2,"maximum":3,"required":false},"font_family_settings":{"description":"font-family declaration in theme.json format, encoded as a string.","type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2\/font-families"}]}},"\/wp\/v2\/font-families\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"theme_json_version":{"description":"Version of the theme.json schema used for the typography settings.","type":"integer","default":3,"minimum":2,"maximum":3,"required":false},"font_family_settings":{"description":"font-family declaration in theme.json format, encoded as a string.","type":"string","required":true}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/font-families\/(?P<font_family_id>[\\d]+)\/font-faces":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"font_family_id":{"description":"The ID for the parent font family of the font face.","type":"integer","required":true},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"id","enum":["id","include"],"required":false}}},{"methods":["POST"],"args":{"font_family_id":{"description":"The ID for the parent font family of the font face.","type":"integer","required":true},"theme_json_version":{"description":"Version of the theme.json schema used for the typography settings.","type":"integer","default":3,"minimum":2,"maximum":3,"required":false},"font_face_settings":{"description":"font-face declaration in theme.json format, encoded as a string.","type":"string","required":true}}}]},"\/wp\/v2\/font-families\/(?P<font_family_id>[\\d]+)\/font-faces\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"font_family_id":{"description":"The ID for the parent font family of the font face.","type":"integer","required":true},"id":{"description":"Unique identifier for the font face.","type":"integer","required":true},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"font_family_id":{"description":"The ID for the parent font family of the font face.","type":"integer","required":true},"id":{"description":"Unique identifier for the font face.","type":"integer","required":true},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/e-floating-buttons":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","suremembers_archive","any"],"type":"string"},"required":false},"format":{"description":"Limit result set to items assigned one or more given formats.","type":"array","uniqueItems":true,"items":{"enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"format":{"description":"The format for the post.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"slim_seo":{"type":"object","title":"","description":"Search Engine Optimization","default":[],"properties":{"title":{"type":"string"},"description":{"type":"string"},"facebook_image":{"type":"string"},"twitter_image":{"type":"string"},"canonical":{"type":"string"},"noindex":{"type":"boolean"}},"additionalProperties":false},"footnotes":{"type":"string","title":"","description":"","default":""},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","kit","not-supported","page","section","container","floating-buttons","cloud-template-preview","widget","popup","header","footer","single","single-post","single-page","archive","search-results","error-404","code_snippet","metabox_group_template","loop-item",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]},"_elementor_conditions":{"type":"array","title":"","description":"Elementor conditions","default":[],"additionalProperties":true,"context":["edit"]}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2\/e-floating-buttons"}]}},"\/wp\/v2\/e-floating-buttons\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"format":{"description":"The format for the post.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"slim_seo":{"type":"object","title":"","description":"Search Engine Optimization","default":[],"properties":{"title":{"type":"string"},"description":{"type":"string"},"facebook_image":{"type":"string"},"twitter_image":{"type":"string"},"canonical":{"type":"string"},"noindex":{"type":"boolean"}},"additionalProperties":false},"footnotes":{"type":"string","title":"","description":"","default":""},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","kit","not-supported","page","section","container","floating-buttons","cloud-template-preview","widget","popup","header","footer","single","single-post","single-page","archive","search-results","error-404","code_snippet","metabox_group_template","loop-item",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]},"_elementor_conditions":{"type":"array","title":"","description":"Elementor conditions","default":[],"additionalProperties":true,"context":["edit"]}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/e-floating-buttons\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/e-floating-buttons\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/e-floating-buttons\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"format":{"description":"The format for the post.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"slim_seo":{"type":"object","title":"","description":"Search Engine Optimization","default":[],"properties":{"title":{"type":"string"},"description":{"type":"string"},"facebook_image":{"type":"string"},"twitter_image":{"type":"string"},"canonical":{"type":"string"},"noindex":{"type":"boolean"}},"additionalProperties":false},"footnotes":{"type":"string","title":"","description":"","default":""},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","kit","not-supported","page","section","container","floating-buttons","cloud-template-preview","widget","popup","header","footer","single","single-post","single-page","archive","search-results","error-404","code_snippet","metabox_group_template","loop-item",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]},"_elementor_conditions":{"type":"array","title":"","description":"Elementor conditions","default":[],"additionalProperties":true,"context":["edit"]}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}]},"\/wp\/v2\/e-floating-buttons\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/elementor_library":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","suremembers_archive","any"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"slim_seo":{"type":"object","title":"","description":"Search Engine Optimization","default":[],"properties":{"title":{"type":"string"},"description":{"type":"string"},"facebook_image":{"type":"string"},"twitter_image":{"type":"string"},"canonical":{"type":"string"},"noindex":{"type":"boolean"}},"additionalProperties":false},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","kit","not-supported","page","section","container","floating-buttons","cloud-template-preview","widget","popup","header","footer","single","single-post","single-page","archive","search-results","error-404","code_snippet","metabox_group_template","loop-item",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]},"_elementor_conditions":{"type":"array","title":"","description":"Elementor conditions","default":[],"additionalProperties":true,"context":["edit"]}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2\/elementor_library"}]}},"\/wp\/v2\/elementor_library\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"slim_seo":{"type":"object","title":"","description":"Search Engine Optimization","default":[],"properties":{"title":{"type":"string"},"description":{"type":"string"},"facebook_image":{"type":"string"},"twitter_image":{"type":"string"},"canonical":{"type":"string"},"noindex":{"type":"boolean"}},"additionalProperties":false},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","kit","not-supported","page","section","container","floating-buttons","cloud-template-preview","widget","popup","header","footer","single","single-post","single-page","archive","search-results","error-404","code_snippet","metabox_group_template","loop-item",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]},"_elementor_conditions":{"type":"array","title":"","description":"Elementor conditions","default":[],"additionalProperties":true,"context":["edit"]}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/elementor_library\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/elementor_library\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/elementor_snippet":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","suremembers_archive","any"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"slim_seo":{"type":"object","title":"","description":"Search Engine Optimization","default":[],"properties":{"title":{"type":"string"},"description":{"type":"string"},"facebook_image":{"type":"string"},"twitter_image":{"type":"string"},"canonical":{"type":"string"},"noindex":{"type":"boolean"}},"additionalProperties":false},"_elementor_location":{"type":"string","title":"","description":"","default":"elementor_head","enum":["elementor_head","elementor_body_start","elementor_body_end"]},"_elementor_priority":{"type":"integer","title":"","description":"","default":1},"_elementor_code":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2\/elementor_snippet"}]}},"\/wp\/v2\/elementor_snippet\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"slim_seo":{"type":"object","title":"","description":"Search Engine Optimization","default":[],"properties":{"title":{"type":"string"},"description":{"type":"string"},"facebook_image":{"type":"string"},"twitter_image":{"type":"string"},"canonical":{"type":"string"},"noindex":{"type":"boolean"}},"additionalProperties":false},"_elementor_location":{"type":"string","title":"","description":"","default":"elementor_head","enum":["elementor_head","elementor_body_start","elementor_body_end"]},"_elementor_priority":{"type":"integer","title":"","description":"","default":1},"_elementor_code":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/web-development":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order"],"required":false},"parent":{"description":"Limit result set to items with particular parent IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"parent_exclude":{"description":"Limit result set to all items except those of a particular parent ID.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","suremembers_archive","any"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2\/web-development"}]}},"\/wp\/v2\/web-development\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/web-development\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/web-development\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/web-development\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}]},"\/wp\/v2\/web-development\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/real-estate-services":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order"],"required":false},"parent":{"description":"Limit result set to items with particular parent IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"parent_exclude":{"description":"Limit result set to all items except those of a particular parent ID.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","suremembers_archive","any"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2\/real-estate-services"}]}},"\/wp\/v2\/real-estate-services\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/real-estate-services\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/real-estate-services\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/real-estate-services\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}]},"\/wp\/v2\/real-estate-services\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/project-management":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order"],"required":false},"parent":{"description":"Limit result set to items with particular parent IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"parent_exclude":{"description":"Limit result set to all items except those of a particular parent ID.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","suremembers_archive","any"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2\/project-management"}]}},"\/wp\/v2\/project-management\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/project-management\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/project-management\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/project-management\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}]},"\/wp\/v2\/project-management\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/land-development":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order"],"required":false},"parent":{"description":"Limit result set to items with particular parent IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"parent_exclude":{"description":"Limit result set to all items except those of a particular parent ID.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","suremembers_archive","any"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2\/land-development"}]}},"\/wp\/v2\/land-development\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/land-development\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/land-development\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/land-development\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}]},"\/wp\/v2\/land-development\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/property":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","suremembers_archive","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"categories":{"description":"Limit result set to items with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"categories_exclude":{"description":"Limit result set to items except those with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"tags":{"description":"Limit result set to items with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"tags_exclude":{"description":"Limit result set to items except those with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"asset-type":{"description":"Limit result set to items with specific terms assigned in the asset-type taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"asset-type_exclude":{"description":"Limit result set to items except those with specific terms assigned in the asset-type taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"asset-type":{"description":"The terms assigned to the post in the asset-type taxonomy.","type":"array","items":{"type":"integer"},"required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2\/property"}]}},"\/wp\/v2\/property\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"asset-type":{"description":"The terms assigned to the post in the asset-type taxonomy.","type":"array","items":{"type":"integer"},"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/property\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"asset-type":{"description":"The terms assigned to the post in the asset-type taxonomy.","type":"array","items":{"type":"integer"},"required":false}}}]},"\/wp\/v2\/property\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/sureforms_form":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","suremembers_archive","any"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"slim_seo":{"type":"object","title":"","description":"Search Engine Optimization","default":[],"properties":{"title":{"type":"string"},"description":{"type":"string"},"facebook_image":{"type":"string"},"twitter_image":{"type":"string"},"canonical":{"type":"string"},"noindex":{"type":"boolean"}},"additionalProperties":false},"_srfm_form_custom_css":{"type":"string","title":"","description":"","default":"","context":["edit"]},"_srfm_use_label_as_placeholder":{"type":"boolean","title":"","description":"","default":false,"context":["edit"]},"_srfm_submit_button_text":{"type":"string","title":"","description":"","default":"Submit","context":["edit"]},"_srfm_is_inline_button":{"type":"boolean","title":"","description":"","default":false,"context":["edit"]},"_srfm_submit_width_backend":{"type":"string","title":"","description":"","default":"max-content","context":["edit"]},"_srfm_button_border_radius":{"type":"integer","title":"","description":"","default":0,"context":["edit"]},"_srfm_submit_alignment":{"type":"string","title":"","description":"","default":"left","context":["edit"]},"_srfm_submit_alignment_backend":{"type":"string","title":"","description":"","default":"100%","context":["edit"]},"_srfm_submit_width":{"type":"string","title":"","description":"","default":"","context":["edit"]},"_srfm_inherit_theme_button":{"type":"boolean","title":"","description":"","default":false,"context":["edit"]},"_srfm_additional_classes":{"type":"string","title":"","description":"","default":"","context":["edit"]},"_srfm_submit_type":{"type":"string","title":"","description":"","default":"message","context":["edit"]},"_srfm_captcha_security_type":{"type":"string","title":"","description":"","default":"","context":["edit"]},"_srfm_form_recaptcha":{"type":"string","title":"","description":"","default":"none","context":["edit"]},"_srfm_is_ai_generated":{"type":"boolean","title":"","description":"","default":false,"context":["edit"]},"_srfm_submit_button_disable":{"type":"boolean","title":"","description":"","default":false,"context":["edit"]},"_srfm_instant_form_settings":{"type":"object","title":"","description":"","default":{"bg_type":"color","bg_color":"#ffffff","bg_image":"","site_logo":"","cover_type":"color","cover_color":"#111C44","cover_image":"","enable_instant_form":false,"form_container_width":620,"single_page_form_title":true,"use_banner_as_page_background":false},"context":["edit"],"properties":{"site_logo":{"type":"string"},"site_logo_id":{"type":"integer"},"cover_type":{"type":"string"},"cover_color":{"type":"string"},"cover_image":{"type":"string"},"cover_image_id":{"type":"integer"},"bg_type":{"type":"string"},"bg_color":{"type":"string"},"bg_image":{"type":"string"},"bg_image_id":{"type":"integer"},"enable_instant_form":{"type":"boolean"},"form_container_width":{"type":"integer"},"single_page_form_title":{"type":"boolean"},"use_banner_as_page_background":{"type":"boolean"}},"additionalProperties":false},"_srfm_forms_styling":{"type":"object","title":"","description":"","default":{"primary_color":"#111C44","text_color":"#1E1E1E","text_color_on_primary":"#FFFFFF","field_spacing":"medium","submit_button_alignment":"left","bg_type":"color","bg_color":"#ffffff","bg_image":"","bg_image_position":{"x":0.5,"y":0.5},"bg_image_attachment":"scroll","bg_image_repeat":"no-repeat","bg_image_size":"cover","bg_image_size_custom":100,"bg_image_size_custom_unit":"%","gradient_type":"basic","bg_gradient_type":"linear","bg_gradient_color_1":"#FFC9B2","bg_gradient_color_2":"#C7CBFF","bg_gradient_angle":90,"bg_gradient_location_1":0,"bg_gradient_location_2":100,"bg_overlay_size":"cover","bg_gradient_overlay_type":"","bg_overlay_opacity":1,"bg_overlay_image":"","bg_image_overlay_color":"#FFFFFF75","bg_overlay_custom_size_unit":"%","bg_overlay_custom_size":100,"bg_overlay_position":{"x":0.5,"y":0.5},"bg_overlay_attachment":"scroll","bg_overlay_repeat":"no-repeat","bg_overlay_blend_mode":"normal","overlay_gradient_type":"basic","bg_overlay_gradient_type":"linear","bg_overlay_gradient_color_1":"#FFC9B2","bg_overlay_gradient_color_2":"#C7CBFF","bg_overlay_gradient_angle":90,"bg_overlay_gradient_location_1":0,"bg_overlay_gradient_location_2":100,"form_padding_top":0,"form_padding_right":0,"form_padding_bottom":0,"form_padding_left":0,"form_padding_unit":"px","form_padding_link":true,"form_border_radius_top":0,"form_border_radius_right":0,"form_border_radius_bottom":0,"form_border_radius_left":0,"form_border_radius_unit":"px","form_border_radius_link":true,"instant_form_padding_top":32,"instant_form_padding_right":32,"instant_form_padding_bottom":32,"instant_form_padding_left":32,"instant_form_padding_unit":"px","instant_form_padding_link":true,"instant_form_border_radius_top":12,"instant_form_border_radius_right":12,"instant_form_border_radius_bottom":12,"instant_form_border_radius_left":12,"instant_form_border_radius_unit":"px","instant_form_border_radius_link":true},"context":["edit"],"properties":{"primary_color":{"type":"string"},"text_color":{"type":"string"},"text_color_on_primary":{"type":"string"},"field_spacing":{"type":"string"},"submit_button_alignment":{"type":"string"},"bg_type":{"type":"string"},"bg_color":{"type":"string"},"bg_image":{"type":"string"},"bg_image_id":{"type":"integer"},"bg_image_position":{"type":"object","properties":{"x":{"type":"number","format":"float"},"y":{"type":"number","format":"float"}},"additionalProperties":false},"bg_image_attachment":{"type":"string"},"bg_image_repeat":{"type":"string"},"bg_image_size":{"type":"string"},"bg_image_size_custom":{"type":"integer"},"bg_image_size_custom_unit":{"type":"string"},"bg_gradient":{"type":"string"},"gradient_type":{"type":"string"},"bg_gradient_type":{"type":"string"},"bg_gradient_color_1":{"type":"string"},"bg_gradient_color_2":{"type":"string"},"bg_gradient_angle":{"type":"integer"},"bg_gradient_location_1":{"type":"integer"},"bg_gradient_location_2":{"type":"integer"},"bg_overlay_size":{"type":"string"},"bg_gradient_overlay_type":{"type":"string"},"bg_overlay_opacity":{"type":"number"},"bg_overlay_image":{"type":"string"},"bg_overlay_image_id":{"type":"integer"},"bg_image_overlay_color":{"type":"string"},"bg_overlay_custom_size_unit":{"type":"string"},"bg_overlay_custom_size":{"type":"integer"},"bg_overlay_blend_mode":{"type":"string"},"bg_overlay_position":{"type":"object","properties":{"x":{"type":"number","format":"float"},"y":{"type":"number","format":"float"}},"additionalProperties":false},"bg_overlay_attachment":{"type":"string"},"bg_overlay_repeat":{"type":"string"},"bg_overlay_gradient":{"type":"string"},"overlay_gradient_type":{"type":"string"},"bg_overlay_gradient_type":{"type":"string"},"bg_overlay_gradient_color_1":{"type":"string"},"bg_overlay_gradient_color_2":{"type":"string"},"bg_overlay_gradient_angle":{"type":"integer"},"bg_overlay_gradient_location_1":{"type":"integer"},"bg_overlay_gradient_location_2":{"type":"integer"},"form_padding_top":{"type":"number"},"form_padding_right":{"type":"number"},"form_padding_bottom":{"type":"number"},"form_padding_left":{"type":"number"},"form_padding_unit":{"type":"string"},"form_padding_link":{"type":"boolean"},"form_border_radius_top":{"type":"number"},"form_border_radius_right":{"type":"number"},"form_border_radius_bottom":{"type":"number"},"form_border_radius_left":{"type":"number"},"form_border_radius_unit":{"type":"string"},"form_border_radius_link":{"type":"boolean"},"instant_form_padding_top":{"type":"number"},"instant_form_padding_right":{"type":"number"},"instant_form_padding_bottom":{"type":"number"},"instant_form_padding_left":{"type":"number"},"instant_form_padding_unit":{"type":"string"},"instant_form_padding_link":{"type":"boolean"},"instant_form_border_radius_top":{"type":"number"},"instant_form_border_radius_right":{"type":"number"},"instant_form_border_radius_bottom":{"type":"number"},"instant_form_border_radius_left":{"type":"number"},"instant_form_border_radius_unit":{"type":"string"},"instant_form_border_radius_link":{"type":"boolean"}},"additionalProperties":false},"_srfm_email_notification":{"type":"array","title":"","description":"","default":[{"id":1,"status":true,"is_raw_format":false,"name":"Admin Notification Email","email_to":"{admin_email}","email_reply_to":"{admin_email}","from_name":"{site_title}","from_email":"{admin_email}","email_cc":"{admin_email}","email_bcc":"{admin_email}","subject":"New Form Submission - {form_title}","email_body":"{all_data}"}],"context":["edit"],"items":{"type":"object","properties":{"id":{"type":"integer"},"status":{"type":"boolean"},"is_raw_format":{"type":"boolean"},"name":{"type":"string"},"email_to":{"type":"string"},"email_reply_to":{"type":"string"},"from_name":{"type":"string"},"from_email":{"type":"string"},"email_cc":{"type":"string"},"email_bcc":{"type":"string"},"subject":{"type":"string"},"email_body":{"type":"string"}},"additionalProperties":false}},"_srfm_compliance":{"type":"array","title":"","description":"","default":[{"id":"gdpr","gdpr":false,"do_not_store_entries":false,"auto_delete_entries":false,"auto_delete_days":""}],"context":["edit"],"items":{"type":"object","properties":{"id":{"type":"string"},"gdpr":{"type":"boolean"},"do_not_store_entries":{"type":"boolean"},"auto_delete_entries":{"type":"boolean"},"auto_delete_days":{"type":"string"}},"additionalProperties":false}},"_srfm_form_confirmation":{"type":"array","title":"","description":"","default":[{"id":1,"confirmation_type":"same page","page_url":"","custom_url":"","message":"\t\t<p style=\"text-align: center;\"><img src=\"data:image\/svg+xml;base64,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\" alt=\"\" aria-hidden=\"true\" \/><\/p><h2 style=\"text-align: center;\">Thank you<\/h2><p style=\"text-align: center;\">Your form has been submitted successfully. We&#039;ll review your details and get back to you soon.<\/p>\n\t\t","submission_action":"hide form"}],"context":["edit"],"items":{"type":"object","properties":{"id":{"type":"integer"},"confirmation_type":{"type":"string"},"page_url":{"type":"string"},"custom_url":{"type":"string"},"message":{"type":"string"},"submission_action":{"type":"string"},"enable_query_params":{"type":"boolean"},"query_params":{"type":"array"}},"additionalProperties":false}},"_srfm_conditional_logic":{"type":"array","title":"","description":"","default":[],"context":["edit"],"items":{"type":"object","additionalProperties":true,"properties":{"logic":{"type":"array","items":{"type":"object","properties":{"field":{"type":"string"},"operator":{"type":"string"},"value":{"type":"string"},"type":{"type":"string"}},"additionalProperties":false}},"action":{"type":"string"}}}},"_srfm_page_break_settings":{"type":"object","title":"","description":"","default":{"is_page_break":false,"first_page_label":"Page Break Label","progress_indicator_type":"connector","toggle_label":false,"next_button_text":"Next","back_button_text":"Back"},"context":["edit"],"properties":{"is_page_break":{"type":"boolean"},"first_page_label":{"type":"string"},"progress_indicator_type":{"type":"string"},"toggle_label":{"type":"boolean"},"next_button_text":{"type":"string"},"back_button_text":{"type":"string"}},"additionalProperties":false},"_srfm_integrations_webhooks":{"type":"array","title":"","description":"","default":[],"context":["edit"],"items":{"type":"object","properties":{"id":{"type":"integer"},"status":{"type":"boolean"},"name":{"type":"string"},"url":{"type":"string"},"method":{"type":"string"},"format":{"type":"string"},"has_custom_headers":{"type":"boolean"},"custom_headers":{"type":"array"},"has_custom_data_filters":{"type":"boolean"},"custom_data_filters":{"type":"array"},"has_trigger_conditions":{"type":"boolean"},"trigger_conditions":{"type":"object","properties":{"timestamp":{"type":"string"},"type":{"type":"string"},"operator":{"type":"string"},"conditions":{"type":"array"}},"additionalProperties":false}},"additionalProperties":false}},"_srfm_premium_common":{"type":"object","title":"","description":"","default":{"is_welcome_screen":false,"welcome_screen_heading":"Help Us Gather Valuable Insights!","welcome_screen_message":"Answer a few quick questions to share your thoughts and make your voice heard.","welcome_screen_image":"","start_btn_text":"Get Started","heading_text_size":30,"heading_text_size_unit":"px","heading_line_height":1.4,"heading_line_height_unit":"em","message_text_size":18,"message_text_size_unit":"px","message_line_height":1.4,"message_line_height_unit":"em"},"context":["edit"],"properties":{"is_welcome_screen":{"type":"boolean"},"welcome_screen_heading":{"type":"string"},"welcome_screen_message":{"type":"string"},"welcome_screen_image":{"type":"string"},"start_btn_text":{"type":"string"},"heading_text_size":{"type":"number"},"heading_text_size_unit":{"type":"string"},"heading_line_height":{"type":"number"},"heading_line_height_unit":{"type":"string"},"message_text_size":{"type":"number"},"message_text_size_unit":{"type":"string"},"message_line_height":{"type":"number"},"message_line_height_unit":{"type":"string"}},"additionalProperties":false},"_srfm_forms_styling_starter":{"type":"object","title":"","description":"","default":{"form_theme":"default","error_color":"#dc2626","form_row_gap":18,"form_row_gap_type":"px","form_column_gap":16,"form_column_gap_type":"px","button_padding_top":10,"button_padding_right":14,"button_padding_bottom":10,"button_padding_left":14,"button_padding_unit":"px","button_padding_link":false,"button_border_style":"solid","button_border_width_top":1,"button_border_width_right":1,"button_border_width_bottom":1,"button_border_width_left":1,"button_border_width_link":true,"button_border_radius_top":6,"button_border_radius_right":6,"button_border_radius_bottom":6,"button_border_radius_left":6,"button_border_radius_unit":"px","button_border_radius_link":true,"button_border_color_normal":"","button_border_color_hover":"","button_text_color_normal":"","button_background_color_normal":"","button_gradient_type_normal":"basic","button_background_gradient_type_normal":"linear","button_background_gradient_angle_normal":90,"button_background_gradient_color_1_normal":"#FFC9B2","button_background_gradient_color_2_normal":"#C7CBFF","button_background_gradient_location_1_normal":0,"button_background_gradient_location_2_normal":100,"button_text_color_hover":"","button_background_color_hover":"","button_gradient_type_hover":"basic","button_background_gradient_type_hover":"linear","button_background_gradient_angle_hover":90,"button_background_gradient_color_1_hover":"#FFC9B2","button_background_gradient_color_2_hover":"#C7CBFF","button_background_gradient_location_1_hover":0,"button_background_gradient_location_2_hover":100,"button_text_size":16,"button_text_size_unit":"px","button_line_height":1.5,"button_line_height_unit":"em","field_bg_color":"#FBFBFB","field_label_color":"#1E1E1E","field_help_text_color":"#1E1E1EA6","field_label_size":16,"field_label_size_unit":"px","field_label_line_height":1.5,"field_label_line_height_unit":"em","field_help_text_size":14,"field_help_text_size_unit":"px","field_help_text_line_height":1.4,"field_help_text_line_height_unit":"em","field_border_color":"#C4C4C4","field_label_gap":6,"field_label_gap_unit":"px","field_border_width_top":1,"field_border_width_right":1,"field_border_width_bottom":1,"field_border_width_left":1,"field_border_width_unit":"px","field_border_width_link":true,"field_border_radius_top":6,"field_border_radius_right":6,"field_border_radius_bottom":6,"field_border_radius_left":6,"field_border_radius_unit":"px","field_border_radius_link":true,"field_box_shadow_color_normal":"","field_box_shadow_horizontal_offset_normal":0,"field_box_shadow_vertical_offset_normal":0,"field_box_shadow_blur_normal":0,"field_box_shadow_spread_normal":0,"field_box_shadow_position_normal":"outset","field_box_shadow_color_focus":"","field_box_shadow_horizontal_offset_focus":0,"field_box_shadow_vertical_offset_focus":0,"field_box_shadow_blur_focus":0,"field_box_shadow_spread_focus":3,"field_box_shadow_position_focus":"outset","page_break_next_button_text_color_normal":"#FFFFFF","page_break_next_button_background_color_normal":"#434343","page_break_next_button_border_color_normal":"#434343","page_break_back_button_text_color_normal":"#FFFFFF","page_break_back_button_background_color_normal":"#434343","page_break_back_button_border_color_normal":"#434343","page_break_next_button_text_color_hover":"#FFFFFFCC","page_break_next_button_background_color_hover":"#434343CC","page_break_next_button_border_color_hover":"#434343CC","page_break_back_button_text_color_hover":"#FFFFFFCC","page_break_back_button_background_color_hover":"#434343CC","page_break_back_button_border_color_hover":"#434343CC"},"context":["edit"],"properties":{"form_theme":{"type":"string"},"error_color":{"type":"string"},"form_row_gap":{"type":"integer"},"form_row_gap_type":{"type":"string"},"form_column_gap":{"type":"integer"},"form_column_gap_type":{"type":"string"},"button_padding_top":{"type":"number"},"button_padding_right":{"type":"number"},"button_padding_bottom":{"type":"number"},"button_padding_left":{"type":"number"},"button_padding_unit":{"type":"string"},"button_padding_link":{"type":"boolean"},"button_border_style":{"type":"string"},"button_border_width_top":{"type":"number"},"button_border_width_right":{"type":"number"},"button_border_width_bottom":{"type":"number"},"button_border_width_left":{"type":"number"},"button_border_width_link":{"type":"boolean"},"button_border_radius_top":{"type":"number"},"button_border_radius_right":{"type":"number"},"button_border_radius_bottom":{"type":"number"},"button_border_radius_left":{"type":"number"},"button_border_radius_unit":{"type":"string"},"button_border_radius_link":{"type":"boolean"},"button_border_color_normal":{"type":"string"},"button_border_color_hover":{"type":"string"},"button_text_color_normal":{"type":"string"},"button_background_type_normal":{"type":"string"},"button_background_color_normal":{"type":"string"},"button_gradient_type_normal":{"type":"string"},"button_background_gradient_type_normal":{"type":"string"},"button_background_gradient_color_1_normal":{"type":"string"},"button_background_gradient_color_2_normal":{"type":"string"},"button_background_gradient_location_1_normal":{"type":"integer"},"button_background_gradient_location_2_normal":{"type":"integer"},"button_background_gradient_angle_normal":{"type":"integer"},"button_background_gradient_normal":{"type":"string"},"button_text_color_hover":{"type":"string"},"button_background_type_hover":{"type":"string"},"button_background_color_hover":{"type":"string"},"button_gradient_type_hover":{"type":"string"},"button_background_gradient_type_hover":{"type":"string"},"button_background_gradient_color_1_hover":{"type":"string"},"button_background_gradient_color_2_hover":{"type":"string"},"button_background_gradient_location_1_hover":{"type":"integer"},"button_background_gradient_location_2_hover":{"type":"integer"},"button_background_gradient_angle_hover":{"type":"integer"},"button_background_gradient_hover":{"type":"string"},"button_text_size":{"type":"number"},"button_text_size_unit":{"type":"string"},"button_line_height":{"type":"number"},"button_line_height_unit":{"type":"string"},"field_bg_color":{"type":"string"},"field_label_color":{"type":"string"},"field_help_text_color":{"type":"string"},"field_label_size":{"type":"number"},"field_label_size_unit":{"type":"string"},"field_label_line_height":{"type":"number"},"field_label_line_height_unit":{"type":"string"},"field_help_text_size":{"type":"number"},"field_help_text_size_unit":{"type":"string"},"field_help_text_line_height":{"type":"number"},"field_help_text_line_height_unit":{"type":"string"},"field_border_color":{"type":"string"},"field_label_gap":{"type":"number"},"field_label_gap_unit":{"type":"string"},"field_border_width_top":{"type":"number"},"field_border_width_right":{"type":"number"},"field_border_width_bottom":{"type":"number"},"field_border_width_left":{"type":"number"},"field_border_width_unit":{"type":"string"},"field_border_width_link":{"type":"boolean"},"field_border_radius_top":{"type":"number"},"field_border_radius_right":{"type":"number"},"field_border_radius_bottom":{"type":"number"},"field_border_radius_left":{"type":"number"},"field_border_radius_unit":{"type":"string"},"field_border_radius_link":{"type":"boolean"},"field_box_shadow_color_normal":{"type":"string"},"field_box_shadow_horizontal_offset_normal":{"type":"number"},"field_box_shadow_vertical_offset_normal":{"type":"number"},"field_box_shadow_blur_normal":{"type":"number"},"field_box_shadow_spread_normal":{"type":"number"},"field_box_shadow_position_normal":{"type":"string"},"field_box_shadow_color_focus":{"type":"string"},"field_box_shadow_horizontal_offset_focus":{"type":"number"},"field_box_shadow_vertical_offset_focus":{"type":"number"},"field_box_shadow_blur_focus":{"type":"number"},"field_box_shadow_spread_focus":{"type":"number"},"field_box_shadow_position_focus":{"type":"string"},"page_break_next_button_text_color_normal":{"type":"string"},"page_break_next_button_background_color_normal":{"type":"string"},"page_break_next_button_border_color_normal":{"type":"string"},"page_break_back_button_text_color_normal":{"type":"string"},"page_break_back_button_background_color_normal":{"type":"string"},"page_break_back_button_border_color_normal":{"type":"string"},"page_break_next_button_text_color_hover":{"type":"string"},"page_break_next_button_background_color_hover":{"type":"string"},"page_break_next_button_border_color_hover":{"type":"string"},"page_break_back_button_text_color_hover":{"type":"string"},"page_break_back_button_background_color_hover":{"type":"string"},"page_break_back_button_border_color_hover":{"type":"string"}},"additionalProperties":false},"_srfm_additional_form_restriction":{"type":"string","title":"","description":"","default":"{\"ip\":{\"status\":false,\"mode\":\"block\",\"ips\":\"\",\"includeDisallowedKeys\":false,\"message\":\"We're sorry, this form isn't accessible from your IP address.\"},\"country\":{\"status\":false,\"mode\":\"block\",\"countries\":\"\",\"message\":\"We're sorry, this form isn't available in your region right now.\"},\"keyword\":{\"status\":false,\"keywords\":\"\",\"includeDisallowedKeys\":false,\"message\":\"Your submission contains restricted keywords.\"},\"login\":{\"status\":false,\"message\":\"This form is only available to logged-in users. Please sign in to proceed.\"},\"password\":{\"status\":false,\"description\":\"This form is password-protected. To view it, please enter the password below.\",\"message\":\"Incorrect password. Please try again!\"}}","context":["edit"]},"_srfm_field_restriction":{"type":"string","title":"","description":"","default":"","context":["edit"]},"_srfm_email_conditional_meta":{"type":"string","title":"","description":"","default":"","context":["edit"]},"_srfm_conditional_confirmation":{"type":"string","title":"","description":"","default":"","context":["edit"]},"_srfm_raw_cpt_meta":{"type":"string","title":"","description":"","default":"","context":["edit"]},"_srfm_quiz_meta":{"type":"string","title":"","description":"","default":"","context":["edit"]},"_srfm_pdf_meta":{"type":"string","title":"","description":"","default":"","context":["edit"]},"_srfm_user_registration_settings":{"type":"string","title":"","description":"","default":"","context":["edit"]},"_srfm_conversational_form":{"type":"object","title":"","description":"","default":{"is_cf_enabled":false,"cf_layout":"image-on-right","cf_is_progress_bar":false,"cf_label_size":24,"cf_label_size_unit":"px","cf_label_line_height":1.4,"cf_label_line_height_unit":"em","cf_help_text_size":16,"cf_help_text_size_unit":"px","cf_help_text_line_height":1.4,"cf_help_text_line_height_unit":"em"},"context":["edit"],"properties":{"is_cf_enabled":{"type":"boolean"},"cf_layout":{"type":"string"},"cf_is_progress_bar":{"type":"boolean"},"cf_label_size":{"type":"number"},"cf_label_size_unit":{"type":"string"},"cf_label_line_height":{"type":"number"},"cf_label_line_height_unit":{"type":"string"},"cf_help_text_size":{"type":"number"},"cf_help_text_size_unit":{"type":"string"},"cf_help_text_line_height":{"type":"number"},"cf_help_text_line_height_unit":{"type":"string"}},"additionalProperties":false},"_srfm_save_resume":{"type":"string","title":"","description":"","default":"{\"status\":false,\"linkText\":\"Save Progress\",\"confirmationMessage\":\"<p><span style=\\\"font-size: 24px;\\\"><strong>We&#039;ve Saved Your Progress!<\\\/strong><\\\/span><\\\/p><p>Your responses are safe! Use the link below to return and complete your form at any time within the next 30 days.<\\\/p><p>{resume_url}<\\\/p><p>Or, you can just enter your email, and we&#039;ll send the link straight to your inbox.<\\\/p><p>{save_email_input}<\\\/p>\",\"afterEmailSendMessage\":\"<p><strong><span style=\\\"font-size: 24px;\\\">Link Sent Successfully!<\\\/span><\\\/strong><\\\/p><p>We&#039;ve sent a copy of your save link to <strong>{save_email}<\\\/strong><\\\/p><p>Check your inbox and spam folder, just in case, to continue your form later.<\\\/p>\",\"emailBody\":\"<p><strong><span style=\\\"font-size: 18px;\\\">Hey There!<\\\/span><\\\/strong><\\\/p><p><span>Thank you for using SureForms!<\\\/span><\\\/p><p><span>Your progress for the form has been saved successfully.<\\\/span><\\\/p><p><span>Click the button below anytime within the next 30 days to resume and complete your form from any device:<\\\/span><\\\/p><p>{resume_url}<\\\/p><p><span>Please note: This link is unique to you, so keep it safe. It will expire in 30 days and should not be shared with others.<\\\/span><\\\/p><p>Best,<br>The SureForms Team<\\\/p>\"}","context":["edit"]},"_srfm_native_integrations":{"type":"string","title":"","description":"","default":"","context":["edit"]},"_srfm_form_restriction":{"type":"string","title":"","description":"","default":"{\"status\":false,\"maxEntries\":0,\"date\":\"\",\"hours\":\"12\",\"minutes\":\"00\",\"meridiem\":\"AM\",\"message\":\"This form is now closed as we have reached the maximum number of entries.\",\"schedulingStatus\":false,\"startDate\":\"\",\"startHours\":\"12\",\"startMinutes\":\"00\",\"startMeridiem\":\"AM\",\"schedulingNotStartedMessage\":\"This form is not yet available. Check back after the scheduled start time.\",\"schedulingEndedMessage\":\"This form is closed. The submission period has ended.\"}","context":["edit"]}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2\/sureforms_form"}]}},"\/wp\/v2\/sureforms_form\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"slim_seo":{"type":"object","title":"","description":"Search Engine Optimization","default":[],"properties":{"title":{"type":"string"},"description":{"type":"string"},"facebook_image":{"type":"string"},"twitter_image":{"type":"string"},"canonical":{"type":"string"},"noindex":{"type":"boolean"}},"additionalProperties":false},"_srfm_form_custom_css":{"type":"string","title":"","description":"","default":"","context":["edit"]},"_srfm_use_label_as_placeholder":{"type":"boolean","title":"","description":"","default":false,"context":["edit"]},"_srfm_submit_button_text":{"type":"string","title":"","description":"","default":"Submit","context":["edit"]},"_srfm_is_inline_button":{"type":"boolean","title":"","description":"","default":false,"context":["edit"]},"_srfm_submit_width_backend":{"type":"string","title":"","description":"","default":"max-content","context":["edit"]},"_srfm_button_border_radius":{"type":"integer","title":"","description":"","default":0,"context":["edit"]},"_srfm_submit_alignment":{"type":"string","title":"","description":"","default":"left","context":["edit"]},"_srfm_submit_alignment_backend":{"type":"string","title":"","description":"","default":"100%","context":["edit"]},"_srfm_submit_width":{"type":"string","title":"","description":"","default":"","context":["edit"]},"_srfm_inherit_theme_button":{"type":"boolean","title":"","description":"","default":false,"context":["edit"]},"_srfm_additional_classes":{"type":"string","title":"","description":"","default":"","context":["edit"]},"_srfm_submit_type":{"type":"string","title":"","description":"","default":"message","context":["edit"]},"_srfm_captcha_security_type":{"type":"string","title":"","description":"","default":"","context":["edit"]},"_srfm_form_recaptcha":{"type":"string","title":"","description":"","default":"none","context":["edit"]},"_srfm_is_ai_generated":{"type":"boolean","title":"","description":"","default":false,"context":["edit"]},"_srfm_submit_button_disable":{"type":"boolean","title":"","description":"","default":false,"context":["edit"]},"_srfm_instant_form_settings":{"type":"object","title":"","description":"","default":{"bg_type":"color","bg_color":"#ffffff","bg_image":"","site_logo":"","cover_type":"color","cover_color":"#111C44","cover_image":"","enable_instant_form":false,"form_container_width":620,"single_page_form_title":true,"use_banner_as_page_background":false},"context":["edit"],"properties":{"site_logo":{"type":"string"},"site_logo_id":{"type":"integer"},"cover_type":{"type":"string"},"cover_color":{"type":"string"},"cover_image":{"type":"string"},"cover_image_id":{"type":"integer"},"bg_type":{"type":"string"},"bg_color":{"type":"string"},"bg_image":{"type":"string"},"bg_image_id":{"type":"integer"},"enable_instant_form":{"type":"boolean"},"form_container_width":{"type":"integer"},"single_page_form_title":{"type":"boolean"},"use_banner_as_page_background":{"type":"boolean"}},"additionalProperties":false},"_srfm_forms_styling":{"type":"object","title":"","description":"","default":{"primary_color":"#111C44","text_color":"#1E1E1E","text_color_on_primary":"#FFFFFF","field_spacing":"medium","submit_button_alignment":"left","bg_type":"color","bg_color":"#ffffff","bg_image":"","bg_image_position":{"x":0.5,"y":0.5},"bg_image_attachment":"scroll","bg_image_repeat":"no-repeat","bg_image_size":"cover","bg_image_size_custom":100,"bg_image_size_custom_unit":"%","gradient_type":"basic","bg_gradient_type":"linear","bg_gradient_color_1":"#FFC9B2","bg_gradient_color_2":"#C7CBFF","bg_gradient_angle":90,"bg_gradient_location_1":0,"bg_gradient_location_2":100,"bg_overlay_size":"cover","bg_gradient_overlay_type":"","bg_overlay_opacity":1,"bg_overlay_image":"","bg_image_overlay_color":"#FFFFFF75","bg_overlay_custom_size_unit":"%","bg_overlay_custom_size":100,"bg_overlay_position":{"x":0.5,"y":0.5},"bg_overlay_attachment":"scroll","bg_overlay_repeat":"no-repeat","bg_overlay_blend_mode":"normal","overlay_gradient_type":"basic","bg_overlay_gradient_type":"linear","bg_overlay_gradient_color_1":"#FFC9B2","bg_overlay_gradient_color_2":"#C7CBFF","bg_overlay_gradient_angle":90,"bg_overlay_gradient_location_1":0,"bg_overlay_gradient_location_2":100,"form_padding_top":0,"form_padding_right":0,"form_padding_bottom":0,"form_padding_left":0,"form_padding_unit":"px","form_padding_link":true,"form_border_radius_top":0,"form_border_radius_right":0,"form_border_radius_bottom":0,"form_border_radius_left":0,"form_border_radius_unit":"px","form_border_radius_link":true,"instant_form_padding_top":32,"instant_form_padding_right":32,"instant_form_padding_bottom":32,"instant_form_padding_left":32,"instant_form_padding_unit":"px","instant_form_padding_link":true,"instant_form_border_radius_top":12,"instant_form_border_radius_right":12,"instant_form_border_radius_bottom":12,"instant_form_border_radius_left":12,"instant_form_border_radius_unit":"px","instant_form_border_radius_link":true},"context":["edit"],"properties":{"primary_color":{"type":"string"},"text_color":{"type":"string"},"text_color_on_primary":{"type":"string"},"field_spacing":{"type":"string"},"submit_button_alignment":{"type":"string"},"bg_type":{"type":"string"},"bg_color":{"type":"string"},"bg_image":{"type":"string"},"bg_image_id":{"type":"integer"},"bg_image_position":{"type":"object","properties":{"x":{"type":"number","format":"float"},"y":{"type":"number","format":"float"}},"additionalProperties":false},"bg_image_attachment":{"type":"string"},"bg_image_repeat":{"type":"string"},"bg_image_size":{"type":"string"},"bg_image_size_custom":{"type":"integer"},"bg_image_size_custom_unit":{"type":"string"},"bg_gradient":{"type":"string"},"gradient_type":{"type":"string"},"bg_gradient_type":{"type":"string"},"bg_gradient_color_1":{"type":"string"},"bg_gradient_color_2":{"type":"string"},"bg_gradient_angle":{"type":"integer"},"bg_gradient_location_1":{"type":"integer"},"bg_gradient_location_2":{"type":"integer"},"bg_overlay_size":{"type":"string"},"bg_gradient_overlay_type":{"type":"string"},"bg_overlay_opacity":{"type":"number"},"bg_overlay_image":{"type":"string"},"bg_overlay_image_id":{"type":"integer"},"bg_image_overlay_color":{"type":"string"},"bg_overlay_custom_size_unit":{"type":"string"},"bg_overlay_custom_size":{"type":"integer"},"bg_overlay_blend_mode":{"type":"string"},"bg_overlay_position":{"type":"object","properties":{"x":{"type":"number","format":"float"},"y":{"type":"number","format":"float"}},"additionalProperties":false},"bg_overlay_attachment":{"type":"string"},"bg_overlay_repeat":{"type":"string"},"bg_overlay_gradient":{"type":"string"},"overlay_gradient_type":{"type":"string"},"bg_overlay_gradient_type":{"type":"string"},"bg_overlay_gradient_color_1":{"type":"string"},"bg_overlay_gradient_color_2":{"type":"string"},"bg_overlay_gradient_angle":{"type":"integer"},"bg_overlay_gradient_location_1":{"type":"integer"},"bg_overlay_gradient_location_2":{"type":"integer"},"form_padding_top":{"type":"number"},"form_padding_right":{"type":"number"},"form_padding_bottom":{"type":"number"},"form_padding_left":{"type":"number"},"form_padding_unit":{"type":"string"},"form_padding_link":{"type":"boolean"},"form_border_radius_top":{"type":"number"},"form_border_radius_right":{"type":"number"},"form_border_radius_bottom":{"type":"number"},"form_border_radius_left":{"type":"number"},"form_border_radius_unit":{"type":"string"},"form_border_radius_link":{"type":"boolean"},"instant_form_padding_top":{"type":"number"},"instant_form_padding_right":{"type":"number"},"instant_form_padding_bottom":{"type":"number"},"instant_form_padding_left":{"type":"number"},"instant_form_padding_unit":{"type":"string"},"instant_form_padding_link":{"type":"boolean"},"instant_form_border_radius_top":{"type":"number"},"instant_form_border_radius_right":{"type":"number"},"instant_form_border_radius_bottom":{"type":"number"},"instant_form_border_radius_left":{"type":"number"},"instant_form_border_radius_unit":{"type":"string"},"instant_form_border_radius_link":{"type":"boolean"}},"additionalProperties":false},"_srfm_email_notification":{"type":"array","title":"","description":"","default":[{"id":1,"status":true,"is_raw_format":false,"name":"Admin Notification Email","email_to":"{admin_email}","email_reply_to":"{admin_email}","from_name":"{site_title}","from_email":"{admin_email}","email_cc":"{admin_email}","email_bcc":"{admin_email}","subject":"New Form Submission - {form_title}","email_body":"{all_data}"}],"context":["edit"],"items":{"type":"object","properties":{"id":{"type":"integer"},"status":{"type":"boolean"},"is_raw_format":{"type":"boolean"},"name":{"type":"string"},"email_to":{"type":"string"},"email_reply_to":{"type":"string"},"from_name":{"type":"string"},"from_email":{"type":"string"},"email_cc":{"type":"string"},"email_bcc":{"type":"string"},"subject":{"type":"string"},"email_body":{"type":"string"}},"additionalProperties":false}},"_srfm_compliance":{"type":"array","title":"","description":"","default":[{"id":"gdpr","gdpr":false,"do_not_store_entries":false,"auto_delete_entries":false,"auto_delete_days":""}],"context":["edit"],"items":{"type":"object","properties":{"id":{"type":"string"},"gdpr":{"type":"boolean"},"do_not_store_entries":{"type":"boolean"},"auto_delete_entries":{"type":"boolean"},"auto_delete_days":{"type":"string"}},"additionalProperties":false}},"_srfm_form_confirmation":{"type":"array","title":"","description":"","default":[{"id":1,"confirmation_type":"same page","page_url":"","custom_url":"","message":"\t\t<p style=\"text-align: center;\"><img src=\"data:image\/svg+xml;base64,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\" alt=\"\" aria-hidden=\"true\" \/><\/p><h2 style=\"text-align: center;\">Thank you<\/h2><p style=\"text-align: center;\">Your form has been submitted successfully. We&#039;ll review your details and get back to you soon.<\/p>\n\t\t","submission_action":"hide form"}],"context":["edit"],"items":{"type":"object","properties":{"id":{"type":"integer"},"confirmation_type":{"type":"string"},"page_url":{"type":"string"},"custom_url":{"type":"string"},"message":{"type":"string"},"submission_action":{"type":"string"},"enable_query_params":{"type":"boolean"},"query_params":{"type":"array"}},"additionalProperties":false}},"_srfm_conditional_logic":{"type":"array","title":"","description":"","default":[],"context":["edit"],"items":{"type":"object","additionalProperties":true,"properties":{"logic":{"type":"array","items":{"type":"object","properties":{"field":{"type":"string"},"operator":{"type":"string"},"value":{"type":"string"},"type":{"type":"string"}},"additionalProperties":false}},"action":{"type":"string"}}}},"_srfm_page_break_settings":{"type":"object","title":"","description":"","default":{"is_page_break":false,"first_page_label":"Page Break Label","progress_indicator_type":"connector","toggle_label":false,"next_button_text":"Next","back_button_text":"Back"},"context":["edit"],"properties":{"is_page_break":{"type":"boolean"},"first_page_label":{"type":"string"},"progress_indicator_type":{"type":"string"},"toggle_label":{"type":"boolean"},"next_button_text":{"type":"string"},"back_button_text":{"type":"string"}},"additionalProperties":false},"_srfm_integrations_webhooks":{"type":"array","title":"","description":"","default":[],"context":["edit"],"items":{"type":"object","properties":{"id":{"type":"integer"},"status":{"type":"boolean"},"name":{"type":"string"},"url":{"type":"string"},"method":{"type":"string"},"format":{"type":"string"},"has_custom_headers":{"type":"boolean"},"custom_headers":{"type":"array"},"has_custom_data_filters":{"type":"boolean"},"custom_data_filters":{"type":"array"},"has_trigger_conditions":{"type":"boolean"},"trigger_conditions":{"type":"object","properties":{"timestamp":{"type":"string"},"type":{"type":"string"},"operator":{"type":"string"},"conditions":{"type":"array"}},"additionalProperties":false}},"additionalProperties":false}},"_srfm_premium_common":{"type":"object","title":"","description":"","default":{"is_welcome_screen":false,"welcome_screen_heading":"Help Us Gather Valuable Insights!","welcome_screen_message":"Answer a few quick questions to share your thoughts and make your voice heard.","welcome_screen_image":"","start_btn_text":"Get Started","heading_text_size":30,"heading_text_size_unit":"px","heading_line_height":1.4,"heading_line_height_unit":"em","message_text_size":18,"message_text_size_unit":"px","message_line_height":1.4,"message_line_height_unit":"em"},"context":["edit"],"properties":{"is_welcome_screen":{"type":"boolean"},"welcome_screen_heading":{"type":"string"},"welcome_screen_message":{"type":"string"},"welcome_screen_image":{"type":"string"},"start_btn_text":{"type":"string"},"heading_text_size":{"type":"number"},"heading_text_size_unit":{"type":"string"},"heading_line_height":{"type":"number"},"heading_line_height_unit":{"type":"string"},"message_text_size":{"type":"number"},"message_text_size_unit":{"type":"string"},"message_line_height":{"type":"number"},"message_line_height_unit":{"type":"string"}},"additionalProperties":false},"_srfm_forms_styling_starter":{"type":"object","title":"","description":"","default":{"form_theme":"default","error_color":"#dc2626","form_row_gap":18,"form_row_gap_type":"px","form_column_gap":16,"form_column_gap_type":"px","button_padding_top":10,"button_padding_right":14,"button_padding_bottom":10,"button_padding_left":14,"button_padding_unit":"px","button_padding_link":false,"button_border_style":"solid","button_border_width_top":1,"button_border_width_right":1,"button_border_width_bottom":1,"button_border_width_left":1,"button_border_width_link":true,"button_border_radius_top":6,"button_border_radius_right":6,"button_border_radius_bottom":6,"button_border_radius_left":6,"button_border_radius_unit":"px","button_border_radius_link":true,"button_border_color_normal":"","button_border_color_hover":"","button_text_color_normal":"","button_background_color_normal":"","button_gradient_type_normal":"basic","button_background_gradient_type_normal":"linear","button_background_gradient_angle_normal":90,"button_background_gradient_color_1_normal":"#FFC9B2","button_background_gradient_color_2_normal":"#C7CBFF","button_background_gradient_location_1_normal":0,"button_background_gradient_location_2_normal":100,"button_text_color_hover":"","button_background_color_hover":"","button_gradient_type_hover":"basic","button_background_gradient_type_hover":"linear","button_background_gradient_angle_hover":90,"button_background_gradient_color_1_hover":"#FFC9B2","button_background_gradient_color_2_hover":"#C7CBFF","button_background_gradient_location_1_hover":0,"button_background_gradient_location_2_hover":100,"button_text_size":16,"button_text_size_unit":"px","button_line_height":1.5,"button_line_height_unit":"em","field_bg_color":"#FBFBFB","field_label_color":"#1E1E1E","field_help_text_color":"#1E1E1EA6","field_label_size":16,"field_label_size_unit":"px","field_label_line_height":1.5,"field_label_line_height_unit":"em","field_help_text_size":14,"field_help_text_size_unit":"px","field_help_text_line_height":1.4,"field_help_text_line_height_unit":"em","field_border_color":"#C4C4C4","field_label_gap":6,"field_label_gap_unit":"px","field_border_width_top":1,"field_border_width_right":1,"field_border_width_bottom":1,"field_border_width_left":1,"field_border_width_unit":"px","field_border_width_link":true,"field_border_radius_top":6,"field_border_radius_right":6,"field_border_radius_bottom":6,"field_border_radius_left":6,"field_border_radius_unit":"px","field_border_radius_link":true,"field_box_shadow_color_normal":"","field_box_shadow_horizontal_offset_normal":0,"field_box_shadow_vertical_offset_normal":0,"field_box_shadow_blur_normal":0,"field_box_shadow_spread_normal":0,"field_box_shadow_position_normal":"outset","field_box_shadow_color_focus":"","field_box_shadow_horizontal_offset_focus":0,"field_box_shadow_vertical_offset_focus":0,"field_box_shadow_blur_focus":0,"field_box_shadow_spread_focus":3,"field_box_shadow_position_focus":"outset","page_break_next_button_text_color_normal":"#FFFFFF","page_break_next_button_background_color_normal":"#434343","page_break_next_button_border_color_normal":"#434343","page_break_back_button_text_color_normal":"#FFFFFF","page_break_back_button_background_color_normal":"#434343","page_break_back_button_border_color_normal":"#434343","page_break_next_button_text_color_hover":"#FFFFFFCC","page_break_next_button_background_color_hover":"#434343CC","page_break_next_button_border_color_hover":"#434343CC","page_break_back_button_text_color_hover":"#FFFFFFCC","page_break_back_button_background_color_hover":"#434343CC","page_break_back_button_border_color_hover":"#434343CC"},"context":["edit"],"properties":{"form_theme":{"type":"string"},"error_color":{"type":"string"},"form_row_gap":{"type":"integer"},"form_row_gap_type":{"type":"string"},"form_column_gap":{"type":"integer"},"form_column_gap_type":{"type":"string"},"button_padding_top":{"type":"number"},"button_padding_right":{"type":"number"},"button_padding_bottom":{"type":"number"},"button_padding_left":{"type":"number"},"button_padding_unit":{"type":"string"},"button_padding_link":{"type":"boolean"},"button_border_style":{"type":"string"},"button_border_width_top":{"type":"number"},"button_border_width_right":{"type":"number"},"button_border_width_bottom":{"type":"number"},"button_border_width_left":{"type":"number"},"button_border_width_link":{"type":"boolean"},"button_border_radius_top":{"type":"number"},"button_border_radius_right":{"type":"number"},"button_border_radius_bottom":{"type":"number"},"button_border_radius_left":{"type":"number"},"button_border_radius_unit":{"type":"string"},"button_border_radius_link":{"type":"boolean"},"button_border_color_normal":{"type":"string"},"button_border_color_hover":{"type":"string"},"button_text_color_normal":{"type":"string"},"button_background_type_normal":{"type":"string"},"button_background_color_normal":{"type":"string"},"button_gradient_type_normal":{"type":"string"},"button_background_gradient_type_normal":{"type":"string"},"button_background_gradient_color_1_normal":{"type":"string"},"button_background_gradient_color_2_normal":{"type":"string"},"button_background_gradient_location_1_normal":{"type":"integer"},"button_background_gradient_location_2_normal":{"type":"integer"},"button_background_gradient_angle_normal":{"type":"integer"},"button_background_gradient_normal":{"type":"string"},"button_text_color_hover":{"type":"string"},"button_background_type_hover":{"type":"string"},"button_background_color_hover":{"type":"string"},"button_gradient_type_hover":{"type":"string"},"button_background_gradient_type_hover":{"type":"string"},"button_background_gradient_color_1_hover":{"type":"string"},"button_background_gradient_color_2_hover":{"type":"string"},"button_background_gradient_location_1_hover":{"type":"integer"},"button_background_gradient_location_2_hover":{"type":"integer"},"button_background_gradient_angle_hover":{"type":"integer"},"button_background_gradient_hover":{"type":"string"},"button_text_size":{"type":"number"},"button_text_size_unit":{"type":"string"},"button_line_height":{"type":"number"},"button_line_height_unit":{"type":"string"},"field_bg_color":{"type":"string"},"field_label_color":{"type":"string"},"field_help_text_color":{"type":"string"},"field_label_size":{"type":"number"},"field_label_size_unit":{"type":"string"},"field_label_line_height":{"type":"number"},"field_label_line_height_unit":{"type":"string"},"field_help_text_size":{"type":"number"},"field_help_text_size_unit":{"type":"string"},"field_help_text_line_height":{"type":"number"},"field_help_text_line_height_unit":{"type":"string"},"field_border_color":{"type":"string"},"field_label_gap":{"type":"number"},"field_label_gap_unit":{"type":"string"},"field_border_width_top":{"type":"number"},"field_border_width_right":{"type":"number"},"field_border_width_bottom":{"type":"number"},"field_border_width_left":{"type":"number"},"field_border_width_unit":{"type":"string"},"field_border_width_link":{"type":"boolean"},"field_border_radius_top":{"type":"number"},"field_border_radius_right":{"type":"number"},"field_border_radius_bottom":{"type":"number"},"field_border_radius_left":{"type":"number"},"field_border_radius_unit":{"type":"string"},"field_border_radius_link":{"type":"boolean"},"field_box_shadow_color_normal":{"type":"string"},"field_box_shadow_horizontal_offset_normal":{"type":"number"},"field_box_shadow_vertical_offset_normal":{"type":"number"},"field_box_shadow_blur_normal":{"type":"number"},"field_box_shadow_spread_normal":{"type":"number"},"field_box_shadow_position_normal":{"type":"string"},"field_box_shadow_color_focus":{"type":"string"},"field_box_shadow_horizontal_offset_focus":{"type":"number"},"field_box_shadow_vertical_offset_focus":{"type":"number"},"field_box_shadow_blur_focus":{"type":"number"},"field_box_shadow_spread_focus":{"type":"number"},"field_box_shadow_position_focus":{"type":"string"},"page_break_next_button_text_color_normal":{"type":"string"},"page_break_next_button_background_color_normal":{"type":"string"},"page_break_next_button_border_color_normal":{"type":"string"},"page_break_back_button_text_color_normal":{"type":"string"},"page_break_back_button_background_color_normal":{"type":"string"},"page_break_back_button_border_color_normal":{"type":"string"},"page_break_next_button_text_color_hover":{"type":"string"},"page_break_next_button_background_color_hover":{"type":"string"},"page_break_next_button_border_color_hover":{"type":"string"},"page_break_back_button_text_color_hover":{"type":"string"},"page_break_back_button_background_color_hover":{"type":"string"},"page_break_back_button_border_color_hover":{"type":"string"}},"additionalProperties":false},"_srfm_additional_form_restriction":{"type":"string","title":"","description":"","default":"{\"ip\":{\"status\":false,\"mode\":\"block\",\"ips\":\"\",\"includeDisallowedKeys\":false,\"message\":\"We're sorry, this form isn't accessible from your IP address.\"},\"country\":{\"status\":false,\"mode\":\"block\",\"countries\":\"\",\"message\":\"We're sorry, this form isn't available in your region right now.\"},\"keyword\":{\"status\":false,\"keywords\":\"\",\"includeDisallowedKeys\":false,\"message\":\"Your submission contains restricted keywords.\"},\"login\":{\"status\":false,\"message\":\"This form is only available to logged-in users. Please sign in to proceed.\"},\"password\":{\"status\":false,\"description\":\"This form is password-protected. To view it, please enter the password below.\",\"message\":\"Incorrect password. Please try again!\"}}","context":["edit"]},"_srfm_field_restriction":{"type":"string","title":"","description":"","default":"","context":["edit"]},"_srfm_email_conditional_meta":{"type":"string","title":"","description":"","default":"","context":["edit"]},"_srfm_conditional_confirmation":{"type":"string","title":"","description":"","default":"","context":["edit"]},"_srfm_raw_cpt_meta":{"type":"string","title":"","description":"","default":"","context":["edit"]},"_srfm_quiz_meta":{"type":"string","title":"","description":"","default":"","context":["edit"]},"_srfm_pdf_meta":{"type":"string","title":"","description":"","default":"","context":["edit"]},"_srfm_user_registration_settings":{"type":"string","title":"","description":"","default":"","context":["edit"]},"_srfm_conversational_form":{"type":"object","title":"","description":"","default":{"is_cf_enabled":false,"cf_layout":"image-on-right","cf_is_progress_bar":false,"cf_label_size":24,"cf_label_size_unit":"px","cf_label_line_height":1.4,"cf_label_line_height_unit":"em","cf_help_text_size":16,"cf_help_text_size_unit":"px","cf_help_text_line_height":1.4,"cf_help_text_line_height_unit":"em"},"context":["edit"],"properties":{"is_cf_enabled":{"type":"boolean"},"cf_layout":{"type":"string"},"cf_is_progress_bar":{"type":"boolean"},"cf_label_size":{"type":"number"},"cf_label_size_unit":{"type":"string"},"cf_label_line_height":{"type":"number"},"cf_label_line_height_unit":{"type":"string"},"cf_help_text_size":{"type":"number"},"cf_help_text_size_unit":{"type":"string"},"cf_help_text_line_height":{"type":"number"},"cf_help_text_line_height_unit":{"type":"string"}},"additionalProperties":false},"_srfm_save_resume":{"type":"string","title":"","description":"","default":"{\"status\":false,\"linkText\":\"Save Progress\",\"confirmationMessage\":\"<p><span style=\\\"font-size: 24px;\\\"><strong>We&#039;ve Saved Your Progress!<\\\/strong><\\\/span><\\\/p><p>Your responses are safe! Use the link below to return and complete your form at any time within the next 30 days.<\\\/p><p>{resume_url}<\\\/p><p>Or, you can just enter your email, and we&#039;ll send the link straight to your inbox.<\\\/p><p>{save_email_input}<\\\/p>\",\"afterEmailSendMessage\":\"<p><strong><span style=\\\"font-size: 24px;\\\">Link Sent Successfully!<\\\/span><\\\/strong><\\\/p><p>We&#039;ve sent a copy of your save link to <strong>{save_email}<\\\/strong><\\\/p><p>Check your inbox and spam folder, just in case, to continue your form later.<\\\/p>\",\"emailBody\":\"<p><strong><span style=\\\"font-size: 18px;\\\">Hey There!<\\\/span><\\\/strong><\\\/p><p><span>Thank you for using SureForms!<\\\/span><\\\/p><p><span>Your progress for the form has been saved successfully.<\\\/span><\\\/p><p><span>Click the button below anytime within the next 30 days to resume and complete your form from any device:<\\\/span><\\\/p><p>{resume_url}<\\\/p><p><span>Please note: This link is unique to you, so keep it safe. It will expire in 30 days and should not be shared with others.<\\\/span><\\\/p><p>Best,<br>The SureForms Team<\\\/p>\"}","context":["edit"]},"_srfm_native_integrations":{"type":"string","title":"","description":"","default":"","context":["edit"]},"_srfm_form_restriction":{"type":"string","title":"","description":"","default":"{\"status\":false,\"maxEntries\":0,\"date\":\"\",\"hours\":\"12\",\"minutes\":\"00\",\"meridiem\":\"AM\",\"message\":\"This form is now closed as we have reached the maximum number of entries.\",\"schedulingStatus\":false,\"startDate\":\"\",\"startHours\":\"12\",\"startMinutes\":\"00\",\"startMeridiem\":\"AM\",\"schedulingNotStartedMessage\":\"This form is not yet available. Check back after the scheduled start time.\",\"schedulingEndedMessage\":\"This form is closed. The submission period has ended.\"}","context":["edit"]}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/sureforms_form\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","suremembers_archive"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"slim_seo":{"type":"object","title":"","description":"Search Engine Optimization","default":[],"properties":{"title":{"type":"string"},"description":{"type":"string"},"facebook_image":{"type":"string"},"twitter_image":{"type":"string"},"canonical":{"type":"string"},"noindex":{"type":"boolean"}},"additionalProperties":false},"_srfm_form_custom_css":{"type":"string","title":"","description":"","default":"","context":["edit"]},"_srfm_use_label_as_placeholder":{"type":"boolean","title":"","description":"","default":false,"context":["edit"]},"_srfm_submit_button_text":{"type":"string","title":"","description":"","default":"Submit","context":["edit"]},"_srfm_is_inline_button":{"type":"boolean","title":"","description":"","default":false,"context":["edit"]},"_srfm_submit_width_backend":{"type":"string","title":"","description":"","default":"max-content","context":["edit"]},"_srfm_button_border_radius":{"type":"integer","title":"","description":"","default":0,"context":["edit"]},"_srfm_submit_alignment":{"type":"string","title":"","description":"","default":"left","context":["edit"]},"_srfm_submit_alignment_backend":{"type":"string","title":"","description":"","default":"100%","context":["edit"]},"_srfm_submit_width":{"type":"string","title":"","description":"","default":"","context":["edit"]},"_srfm_inherit_theme_button":{"type":"boolean","title":"","description":"","default":false,"context":["edit"]},"_srfm_additional_classes":{"type":"string","title":"","description":"","default":"","context":["edit"]},"_srfm_submit_type":{"type":"string","title":"","description":"","default":"message","context":["edit"]},"_srfm_captcha_security_type":{"type":"string","title":"","description":"","default":"","context":["edit"]},"_srfm_form_recaptcha":{"type":"string","title":"","description":"","default":"none","context":["edit"]},"_srfm_is_ai_generated":{"type":"boolean","title":"","description":"","default":false,"context":["edit"]},"_srfm_submit_button_disable":{"type":"boolean","title":"","description":"","default":false,"context":["edit"]},"_srfm_instant_form_settings":{"type":"object","title":"","description":"","default":{"bg_type":"color","bg_color":"#ffffff","bg_image":"","site_logo":"","cover_type":"color","cover_color":"#111C44","cover_image":"","enable_instant_form":false,"form_container_width":620,"single_page_form_title":true,"use_banner_as_page_background":false},"context":["edit"],"properties":{"site_logo":{"type":"string"},"site_logo_id":{"type":"integer"},"cover_type":{"type":"string"},"cover_color":{"type":"string"},"cover_image":{"type":"string"},"cover_image_id":{"type":"integer"},"bg_type":{"type":"string"},"bg_color":{"type":"string"},"bg_image":{"type":"string"},"bg_image_id":{"type":"integer"},"enable_instant_form":{"type":"boolean"},"form_container_width":{"type":"integer"},"single_page_form_title":{"type":"boolean"},"use_banner_as_page_background":{"type":"boolean"}},"additionalProperties":false},"_srfm_forms_styling":{"type":"object","title":"","description":"","default":{"primary_color":"#111C44","text_color":"#1E1E1E","text_color_on_primary":"#FFFFFF","field_spacing":"medium","submit_button_alignment":"left","bg_type":"color","bg_color":"#ffffff","bg_image":"","bg_image_position":{"x":0.5,"y":0.5},"bg_image_attachment":"scroll","bg_image_repeat":"no-repeat","bg_image_size":"cover","bg_image_size_custom":100,"bg_image_size_custom_unit":"%","gradient_type":"basic","bg_gradient_type":"linear","bg_gradient_color_1":"#FFC9B2","bg_gradient_color_2":"#C7CBFF","bg_gradient_angle":90,"bg_gradient_location_1":0,"bg_gradient_location_2":100,"bg_overlay_size":"cover","bg_gradient_overlay_type":"","bg_overlay_opacity":1,"bg_overlay_image":"","bg_image_overlay_color":"#FFFFFF75","bg_overlay_custom_size_unit":"%","bg_overlay_custom_size":100,"bg_overlay_position":{"x":0.5,"y":0.5},"bg_overlay_attachment":"scroll","bg_overlay_repeat":"no-repeat","bg_overlay_blend_mode":"normal","overlay_gradient_type":"basic","bg_overlay_gradient_type":"linear","bg_overlay_gradient_color_1":"#FFC9B2","bg_overlay_gradient_color_2":"#C7CBFF","bg_overlay_gradient_angle":90,"bg_overlay_gradient_location_1":0,"bg_overlay_gradient_location_2":100,"form_padding_top":0,"form_padding_right":0,"form_padding_bottom":0,"form_padding_left":0,"form_padding_unit":"px","form_padding_link":true,"form_border_radius_top":0,"form_border_radius_right":0,"form_border_radius_bottom":0,"form_border_radius_left":0,"form_border_radius_unit":"px","form_border_radius_link":true,"instant_form_padding_top":32,"instant_form_padding_right":32,"instant_form_padding_bottom":32,"instant_form_padding_left":32,"instant_form_padding_unit":"px","instant_form_padding_link":true,"instant_form_border_radius_top":12,"instant_form_border_radius_right":12,"instant_form_border_radius_bottom":12,"instant_form_border_radius_left":12,"instant_form_border_radius_unit":"px","instant_form_border_radius_link":true},"context":["edit"],"properties":{"primary_color":{"type":"string"},"text_color":{"type":"string"},"text_color_on_primary":{"type":"string"},"field_spacing":{"type":"string"},"submit_button_alignment":{"type":"string"},"bg_type":{"type":"string"},"bg_color":{"type":"string"},"bg_image":{"type":"string"},"bg_image_id":{"type":"integer"},"bg_image_position":{"type":"object","properties":{"x":{"type":"number","format":"float"},"y":{"type":"number","format":"float"}},"additionalProperties":false},"bg_image_attachment":{"type":"string"},"bg_image_repeat":{"type":"string"},"bg_image_size":{"type":"string"},"bg_image_size_custom":{"type":"integer"},"bg_image_size_custom_unit":{"type":"string"},"bg_gradient":{"type":"string"},"gradient_type":{"type":"string"},"bg_gradient_type":{"type":"string"},"bg_gradient_color_1":{"type":"string"},"bg_gradient_color_2":{"type":"string"},"bg_gradient_angle":{"type":"integer"},"bg_gradient_location_1":{"type":"integer"},"bg_gradient_location_2":{"type":"integer"},"bg_overlay_size":{"type":"string"},"bg_gradient_overlay_type":{"type":"string"},"bg_overlay_opacity":{"type":"number"},"bg_overlay_image":{"type":"string"},"bg_overlay_image_id":{"type":"integer"},"bg_image_overlay_color":{"type":"string"},"bg_overlay_custom_size_unit":{"type":"string"},"bg_overlay_custom_size":{"type":"integer"},"bg_overlay_blend_mode":{"type":"string"},"bg_overlay_position":{"type":"object","properties":{"x":{"type":"number","format":"float"},"y":{"type":"number","format":"float"}},"additionalProperties":false},"bg_overlay_attachment":{"type":"string"},"bg_overlay_repeat":{"type":"string"},"bg_overlay_gradient":{"type":"string"},"overlay_gradient_type":{"type":"string"},"bg_overlay_gradient_type":{"type":"string"},"bg_overlay_gradient_color_1":{"type":"string"},"bg_overlay_gradient_color_2":{"type":"string"},"bg_overlay_gradient_angle":{"type":"integer"},"bg_overlay_gradient_location_1":{"type":"integer"},"bg_overlay_gradient_location_2":{"type":"integer"},"form_padding_top":{"type":"number"},"form_padding_right":{"type":"number"},"form_padding_bottom":{"type":"number"},"form_padding_left":{"type":"number"},"form_padding_unit":{"type":"string"},"form_padding_link":{"type":"boolean"},"form_border_radius_top":{"type":"number"},"form_border_radius_right":{"type":"number"},"form_border_radius_bottom":{"type":"number"},"form_border_radius_left":{"type":"number"},"form_border_radius_unit":{"type":"string"},"form_border_radius_link":{"type":"boolean"},"instant_form_padding_top":{"type":"number"},"instant_form_padding_right":{"type":"number"},"instant_form_padding_bottom":{"type":"number"},"instant_form_padding_left":{"type":"number"},"instant_form_padding_unit":{"type":"string"},"instant_form_padding_link":{"type":"boolean"},"instant_form_border_radius_top":{"type":"number"},"instant_form_border_radius_right":{"type":"number"},"instant_form_border_radius_bottom":{"type":"number"},"instant_form_border_radius_left":{"type":"number"},"instant_form_border_radius_unit":{"type":"string"},"instant_form_border_radius_link":{"type":"boolean"}},"additionalProperties":false},"_srfm_email_notification":{"type":"array","title":"","description":"","default":[{"id":1,"status":true,"is_raw_format":false,"name":"Admin Notification Email","email_to":"{admin_email}","email_reply_to":"{admin_email}","from_name":"{site_title}","from_email":"{admin_email}","email_cc":"{admin_email}","email_bcc":"{admin_email}","subject":"New Form Submission - {form_title}","email_body":"{all_data}"}],"context":["edit"],"items":{"type":"object","properties":{"id":{"type":"integer"},"status":{"type":"boolean"},"is_raw_format":{"type":"boolean"},"name":{"type":"string"},"email_to":{"type":"string"},"email_reply_to":{"type":"string"},"from_name":{"type":"string"},"from_email":{"type":"string"},"email_cc":{"type":"string"},"email_bcc":{"type":"string"},"subject":{"type":"string"},"email_body":{"type":"string"}},"additionalProperties":false}},"_srfm_compliance":{"type":"array","title":"","description":"","default":[{"id":"gdpr","gdpr":false,"do_not_store_entries":false,"auto_delete_entries":false,"auto_delete_days":""}],"context":["edit"],"items":{"type":"object","properties":{"id":{"type":"string"},"gdpr":{"type":"boolean"},"do_not_store_entries":{"type":"boolean"},"auto_delete_entries":{"type":"boolean"},"auto_delete_days":{"type":"string"}},"additionalProperties":false}},"_srfm_form_confirmation":{"type":"array","title":"","description":"","default":[{"id":1,"confirmation_type":"same page","page_url":"","custom_url":"","message":"\t\t<p style=\"text-align: center;\"><img src=\"data:image\/svg+xml;base64,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\" alt=\"\" aria-hidden=\"true\" \/><\/p><h2 style=\"text-align: center;\">Thank you<\/h2><p style=\"text-align: center;\">Your form has been submitted successfully. We&#039;ll review your details and get back to you soon.<\/p>\n\t\t","submission_action":"hide form"}],"context":["edit"],"items":{"type":"object","properties":{"id":{"type":"integer"},"confirmation_type":{"type":"string"},"page_url":{"type":"string"},"custom_url":{"type":"string"},"message":{"type":"string"},"submission_action":{"type":"string"},"enable_query_params":{"type":"boolean"},"query_params":{"type":"array"}},"additionalProperties":false}},"_srfm_conditional_logic":{"type":"array","title":"","description":"","default":[],"context":["edit"],"items":{"type":"object","additionalProperties":true,"properties":{"logic":{"type":"array","items":{"type":"object","properties":{"field":{"type":"string"},"operator":{"type":"string"},"value":{"type":"string"},"type":{"type":"string"}},"additionalProperties":false}},"action":{"type":"string"}}}},"_srfm_page_break_settings":{"type":"object","title":"","description":"","default":{"is_page_break":false,"first_page_label":"Page Break Label","progress_indicator_type":"connector","toggle_label":false,"next_button_text":"Next","back_button_text":"Back"},"context":["edit"],"properties":{"is_page_break":{"type":"boolean"},"first_page_label":{"type":"string"},"progress_indicator_type":{"type":"string"},"toggle_label":{"type":"boolean"},"next_button_text":{"type":"string"},"back_button_text":{"type":"string"}},"additionalProperties":false},"_srfm_integrations_webhooks":{"type":"array","title":"","description":"","default":[],"context":["edit"],"items":{"type":"object","properties":{"id":{"type":"integer"},"status":{"type":"boolean"},"name":{"type":"string"},"url":{"type":"string"},"method":{"type":"string"},"format":{"type":"string"},"has_custom_headers":{"type":"boolean"},"custom_headers":{"type":"array"},"has_custom_data_filters":{"type":"boolean"},"custom_data_filters":{"type":"array"},"has_trigger_conditions":{"type":"boolean"},"trigger_conditions":{"type":"object","properties":{"timestamp":{"type":"string"},"type":{"type":"string"},"operator":{"type":"string"},"conditions":{"type":"array"}},"additionalProperties":false}},"additionalProperties":false}},"_srfm_premium_common":{"type":"object","title":"","description":"","default":{"is_welcome_screen":false,"welcome_screen_heading":"Help Us Gather Valuable Insights!","welcome_screen_message":"Answer a few quick questions to share your thoughts and make your voice heard.","welcome_screen_image":"","start_btn_text":"Get Started","heading_text_size":30,"heading_text_size_unit":"px","heading_line_height":1.4,"heading_line_height_unit":"em","message_text_size":18,"message_text_size_unit":"px","message_line_height":1.4,"message_line_height_unit":"em"},"context":["edit"],"properties":{"is_welcome_screen":{"type":"boolean"},"welcome_screen_heading":{"type":"string"},"welcome_screen_message":{"type":"string"},"welcome_screen_image":{"type":"string"},"start_btn_text":{"type":"string"},"heading_text_size":{"type":"number"},"heading_text_size_unit":{"type":"string"},"heading_line_height":{"type":"number"},"heading_line_height_unit":{"type":"string"},"message_text_size":{"type":"number"},"message_text_size_unit":{"type":"string"},"message_line_height":{"type":"number"},"message_line_height_unit":{"type":"string"}},"additionalProperties":false},"_srfm_forms_styling_starter":{"type":"object","title":"","description":"","default":{"form_theme":"default","error_color":"#dc2626","form_row_gap":18,"form_row_gap_type":"px","form_column_gap":16,"form_column_gap_type":"px","button_padding_top":10,"button_padding_right":14,"button_padding_bottom":10,"button_padding_left":14,"button_padding_unit":"px","button_padding_link":false,"button_border_style":"solid","button_border_width_top":1,"button_border_width_right":1,"button_border_width_bottom":1,"button_border_width_left":1,"button_border_width_link":true,"button_border_radius_top":6,"button_border_radius_right":6,"button_border_radius_bottom":6,"button_border_radius_left":6,"button_border_radius_unit":"px","button_border_radius_link":true,"button_border_color_normal":"","button_border_color_hover":"","button_text_color_normal":"","button_background_color_normal":"","button_gradient_type_normal":"basic","button_background_gradient_type_normal":"linear","button_background_gradient_angle_normal":90,"button_background_gradient_color_1_normal":"#FFC9B2","button_background_gradient_color_2_normal":"#C7CBFF","button_background_gradient_location_1_normal":0,"button_background_gradient_location_2_normal":100,"button_text_color_hover":"","button_background_color_hover":"","button_gradient_type_hover":"basic","button_background_gradient_type_hover":"linear","button_background_gradient_angle_hover":90,"button_background_gradient_color_1_hover":"#FFC9B2","button_background_gradient_color_2_hover":"#C7CBFF","button_background_gradient_location_1_hover":0,"button_background_gradient_location_2_hover":100,"button_text_size":16,"button_text_size_unit":"px","button_line_height":1.5,"button_line_height_unit":"em","field_bg_color":"#FBFBFB","field_label_color":"#1E1E1E","field_help_text_color":"#1E1E1EA6","field_label_size":16,"field_label_size_unit":"px","field_label_line_height":1.5,"field_label_line_height_unit":"em","field_help_text_size":14,"field_help_text_size_unit":"px","field_help_text_line_height":1.4,"field_help_text_line_height_unit":"em","field_border_color":"#C4C4C4","field_label_gap":6,"field_label_gap_unit":"px","field_border_width_top":1,"field_border_width_right":1,"field_border_width_bottom":1,"field_border_width_left":1,"field_border_width_unit":"px","field_border_width_link":true,"field_border_radius_top":6,"field_border_radius_right":6,"field_border_radius_bottom":6,"field_border_radius_left":6,"field_border_radius_unit":"px","field_border_radius_link":true,"field_box_shadow_color_normal":"","field_box_shadow_horizontal_offset_normal":0,"field_box_shadow_vertical_offset_normal":0,"field_box_shadow_blur_normal":0,"field_box_shadow_spread_normal":0,"field_box_shadow_position_normal":"outset","field_box_shadow_color_focus":"","field_box_shadow_horizontal_offset_focus":0,"field_box_shadow_vertical_offset_focus":0,"field_box_shadow_blur_focus":0,"field_box_shadow_spread_focus":3,"field_box_shadow_position_focus":"outset","page_break_next_button_text_color_normal":"#FFFFFF","page_break_next_button_background_color_normal":"#434343","page_break_next_button_border_color_normal":"#434343","page_break_back_button_text_color_normal":"#FFFFFF","page_break_back_button_background_color_normal":"#434343","page_break_back_button_border_color_normal":"#434343","page_break_next_button_text_color_hover":"#FFFFFFCC","page_break_next_button_background_color_hover":"#434343CC","page_break_next_button_border_color_hover":"#434343CC","page_break_back_button_text_color_hover":"#FFFFFFCC","page_break_back_button_background_color_hover":"#434343CC","page_break_back_button_border_color_hover":"#434343CC"},"context":["edit"],"properties":{"form_theme":{"type":"string"},"error_color":{"type":"string"},"form_row_gap":{"type":"integer"},"form_row_gap_type":{"type":"string"},"form_column_gap":{"type":"integer"},"form_column_gap_type":{"type":"string"},"button_padding_top":{"type":"number"},"button_padding_right":{"type":"number"},"button_padding_bottom":{"type":"number"},"button_padding_left":{"type":"number"},"button_padding_unit":{"type":"string"},"button_padding_link":{"type":"boolean"},"button_border_style":{"type":"string"},"button_border_width_top":{"type":"number"},"button_border_width_right":{"type":"number"},"button_border_width_bottom":{"type":"number"},"button_border_width_left":{"type":"number"},"button_border_width_link":{"type":"boolean"},"button_border_radius_top":{"type":"number"},"button_border_radius_right":{"type":"number"},"button_border_radius_bottom":{"type":"number"},"button_border_radius_left":{"type":"number"},"button_border_radius_unit":{"type":"string"},"button_border_radius_link":{"type":"boolean"},"button_border_color_normal":{"type":"string"},"button_border_color_hover":{"type":"string"},"button_text_color_normal":{"type":"string"},"button_background_type_normal":{"type":"string"},"button_background_color_normal":{"type":"string"},"button_gradient_type_normal":{"type":"string"},"button_background_gradient_type_normal":{"type":"string"},"button_background_gradient_color_1_normal":{"type":"string"},"button_background_gradient_color_2_normal":{"type":"string"},"button_background_gradient_location_1_normal":{"type":"integer"},"button_background_gradient_location_2_normal":{"type":"integer"},"button_background_gradient_angle_normal":{"type":"integer"},"button_background_gradient_normal":{"type":"string"},"button_text_color_hover":{"type":"string"},"button_background_type_hover":{"type":"string"},"button_background_color_hover":{"type":"string"},"button_gradient_type_hover":{"type":"string"},"button_background_gradient_type_hover":{"type":"string"},"button_background_gradient_color_1_hover":{"type":"string"},"button_background_gradient_color_2_hover":{"type":"string"},"button_background_gradient_location_1_hover":{"type":"integer"},"button_background_gradient_location_2_hover":{"type":"integer"},"button_background_gradient_angle_hover":{"type":"integer"},"button_background_gradient_hover":{"type":"string"},"button_text_size":{"type":"number"},"button_text_size_unit":{"type":"string"},"button_line_height":{"type":"number"},"button_line_height_unit":{"type":"string"},"field_bg_color":{"type":"string"},"field_label_color":{"type":"string"},"field_help_text_color":{"type":"string"},"field_label_size":{"type":"number"},"field_label_size_unit":{"type":"string"},"field_label_line_height":{"type":"number"},"field_label_line_height_unit":{"type":"string"},"field_help_text_size":{"type":"number"},"field_help_text_size_unit":{"type":"string"},"field_help_text_line_height":{"type":"number"},"field_help_text_line_height_unit":{"type":"string"},"field_border_color":{"type":"string"},"field_label_gap":{"type":"number"},"field_label_gap_unit":{"type":"string"},"field_border_width_top":{"type":"number"},"field_border_width_right":{"type":"number"},"field_border_width_bottom":{"type":"number"},"field_border_width_left":{"type":"number"},"field_border_width_unit":{"type":"string"},"field_border_width_link":{"type":"boolean"},"field_border_radius_top":{"type":"number"},"field_border_radius_right":{"type":"number"},"field_border_radius_bottom":{"type":"number"},"field_border_radius_left":{"type":"number"},"field_border_radius_unit":{"type":"string"},"field_border_radius_link":{"type":"boolean"},"field_box_shadow_color_normal":{"type":"string"},"field_box_shadow_horizontal_offset_normal":{"type":"number"},"field_box_shadow_vertical_offset_normal":{"type":"number"},"field_box_shadow_blur_normal":{"type":"number"},"field_box_shadow_spread_normal":{"type":"number"},"field_box_shadow_position_normal":{"type":"string"},"field_box_shadow_color_focus":{"type":"string"},"field_box_shadow_horizontal_offset_focus":{"type":"number"},"field_box_shadow_vertical_offset_focus":{"type":"number"},"field_box_shadow_blur_focus":{"type":"number"},"field_box_shadow_spread_focus":{"type":"number"},"field_box_shadow_position_focus":{"type":"string"},"page_break_next_button_text_color_normal":{"type":"string"},"page_break_next_button_background_color_normal":{"type":"string"},"page_break_next_button_border_color_normal":{"type":"string"},"page_break_back_button_text_color_normal":{"type":"string"},"page_break_back_button_background_color_normal":{"type":"string"},"page_break_back_button_border_color_normal":{"type":"string"},"page_break_next_button_text_color_hover":{"type":"string"},"page_break_next_button_background_color_hover":{"type":"string"},"page_break_next_button_border_color_hover":{"type":"string"},"page_break_back_button_text_color_hover":{"type":"string"},"page_break_back_button_background_color_hover":{"type":"string"},"page_break_back_button_border_color_hover":{"type":"string"}},"additionalProperties":false},"_srfm_additional_form_restriction":{"type":"string","title":"","description":"","default":"{\"ip\":{\"status\":false,\"mode\":\"block\",\"ips\":\"\",\"includeDisallowedKeys\":false,\"message\":\"We're sorry, this form isn't accessible from your IP address.\"},\"country\":{\"status\":false,\"mode\":\"block\",\"countries\":\"\",\"message\":\"We're sorry, this form isn't available in your region right now.\"},\"keyword\":{\"status\":false,\"keywords\":\"\",\"includeDisallowedKeys\":false,\"message\":\"Your submission contains restricted keywords.\"},\"login\":{\"status\":false,\"message\":\"This form is only available to logged-in users. Please sign in to proceed.\"},\"password\":{\"status\":false,\"description\":\"This form is password-protected. To view it, please enter the password below.\",\"message\":\"Incorrect password. Please try again!\"}}","context":["edit"]},"_srfm_field_restriction":{"type":"string","title":"","description":"","default":"","context":["edit"]},"_srfm_email_conditional_meta":{"type":"string","title":"","description":"","default":"","context":["edit"]},"_srfm_conditional_confirmation":{"type":"string","title":"","description":"","default":"","context":["edit"]},"_srfm_raw_cpt_meta":{"type":"string","title":"","description":"","default":"","context":["edit"]},"_srfm_quiz_meta":{"type":"string","title":"","description":"","default":"","context":["edit"]},"_srfm_pdf_meta":{"type":"string","title":"","description":"","default":"","context":["edit"]},"_srfm_user_registration_settings":{"type":"string","title":"","description":"","default":"","context":["edit"]},"_srfm_conversational_form":{"type":"object","title":"","description":"","default":{"is_cf_enabled":false,"cf_layout":"image-on-right","cf_is_progress_bar":false,"cf_label_size":24,"cf_label_size_unit":"px","cf_label_line_height":1.4,"cf_label_line_height_unit":"em","cf_help_text_size":16,"cf_help_text_size_unit":"px","cf_help_text_line_height":1.4,"cf_help_text_line_height_unit":"em"},"context":["edit"],"properties":{"is_cf_enabled":{"type":"boolean"},"cf_layout":{"type":"string"},"cf_is_progress_bar":{"type":"boolean"},"cf_label_size":{"type":"number"},"cf_label_size_unit":{"type":"string"},"cf_label_line_height":{"type":"number"},"cf_label_line_height_unit":{"type":"string"},"cf_help_text_size":{"type":"number"},"cf_help_text_size_unit":{"type":"string"},"cf_help_text_line_height":{"type":"number"},"cf_help_text_line_height_unit":{"type":"string"}},"additionalProperties":false},"_srfm_save_resume":{"type":"string","title":"","description":"","default":"{\"status\":false,\"linkText\":\"Save Progress\",\"confirmationMessage\":\"<p><span style=\\\"font-size: 24px;\\\"><strong>We&#039;ve Saved Your Progress!<\\\/strong><\\\/span><\\\/p><p>Your responses are safe! Use the link below to return and complete your form at any time within the next 30 days.<\\\/p><p>{resume_url}<\\\/p><p>Or, you can just enter your email, and we&#039;ll send the link straight to your inbox.<\\\/p><p>{save_email_input}<\\\/p>\",\"afterEmailSendMessage\":\"<p><strong><span style=\\\"font-size: 24px;\\\">Link Sent Successfully!<\\\/span><\\\/strong><\\\/p><p>We&#039;ve sent a copy of your save link to <strong>{save_email}<\\\/strong><\\\/p><p>Check your inbox and spam folder, just in case, to continue your form later.<\\\/p>\",\"emailBody\":\"<p><strong><span style=\\\"font-size: 18px;\\\">Hey There!<\\\/span><\\\/strong><\\\/p><p><span>Thank you for using SureForms!<\\\/span><\\\/p><p><span>Your progress for the form has been saved successfully.<\\\/span><\\\/p><p><span>Click the button below anytime within the next 30 days to resume and complete your form from any device:<\\\/span><\\\/p><p>{resume_url}<\\\/p><p><span>Please note: This link is unique to you, so keep it safe. It will expire in 30 days and should not be shared with others.<\\\/span><\\\/p><p>Best,<br>The SureForms Team<\\\/p>\"}","context":["edit"]},"_srfm_native_integrations":{"type":"string","title":"","description":"","default":"","context":["edit"]},"_srfm_form_restriction":{"type":"string","title":"","description":"","default":"{\"status\":false,\"maxEntries\":0,\"date\":\"\",\"hours\":\"12\",\"minutes\":\"00\",\"meridiem\":\"AM\",\"message\":\"This form is now closed as we have reached the maximum number of entries.\",\"schedulingStatus\":false,\"startDate\":\"\",\"startHours\":\"12\",\"startMinutes\":\"00\",\"startMeridiem\":\"AM\",\"schedulingNotStartedMessage\":\"This form is not yet available. Check back after the scheduled start time.\",\"schedulingEndedMessage\":\"This form is closed. The submission period has ended.\"}","context":["edit"]}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}]},"\/wp\/v2\/sureforms_form\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/types":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2\/types"}]}},"\/wp\/v2\/types\/(?P<type>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"type":{"description":"An alphanumeric identifier for the post type.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/statuses":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2\/statuses"}]}},"\/wp\/v2\/statuses\/(?P<status>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"status":{"description":"An alphanumeric identifier for the status.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/taxonomies":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"type":{"description":"Limit results to taxonomies associated with a specific post type.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2\/taxonomies"}]}},"\/wp\/v2\/taxonomies\/(?P<taxonomy>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"taxonomy":{"description":"An alphanumeric identifier for the taxonomy.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/categories":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"parent":{"description":"Limit result set to terms assigned to a specific parent.","type":"integer","required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"slim_seo":{"type":"object","title":"","description":"Search Engine Optimization","default":[],"properties":{"title":{"type":"string"},"description":{"type":"string"},"facebook_image":{"type":"string"},"twitter_image":{"type":"string"},"canonical":{"type":"string"},"noindex":{"type":"boolean"}},"additionalProperties":false}},"required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2\/categories"}]}},"\/wp\/v2\/categories\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"slim_seo":{"type":"object","title":"","description":"Search Engine Optimization","default":[],"properties":{"title":{"type":"string"},"description":{"type":"string"},"facebook_image":{"type":"string"},"twitter_image":{"type":"string"},"canonical":{"type":"string"},"noindex":{"type":"boolean"}},"additionalProperties":false}},"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/tags":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"slim_seo":{"type":"object","title":"","description":"Search Engine Optimization","default":[],"properties":{"title":{"type":"string"},"description":{"type":"string"},"facebook_image":{"type":"string"},"twitter_image":{"type":"string"},"canonical":{"type":"string"},"noindex":{"type":"boolean"}},"additionalProperties":false}},"required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2\/tags"}]}},"\/wp\/v2\/tags\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"slim_seo":{"type":"object","title":"","description":"Search Engine Optimization","default":[],"properties":{"title":{"type":"string"},"description":{"type":"string"},"facebook_image":{"type":"string"},"twitter_image":{"type":"string"},"canonical":{"type":"string"},"noindex":{"type":"boolean"}},"additionalProperties":false}},"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/menus":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"slim_seo":{"type":"object","title":"","description":"Search Engine Optimization","default":[],"properties":{"title":{"type":"string"},"description":{"type":"string"},"facebook_image":{"type":"string"},"twitter_image":{"type":"string"},"canonical":{"type":"string"},"noindex":{"type":"boolean"}},"additionalProperties":false}},"required":false},"locations":{"description":"The locations assigned to the menu.","type":"array","items":{"type":"string"},"required":false},"auto_add":{"description":"Whether to automatically add top level pages to this menu.","type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2\/menus"}]}},"\/wp\/v2\/menus\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"slim_seo":{"type":"object","title":"","description":"Search Engine Optimization","default":[],"properties":{"title":{"type":"string"},"description":{"type":"string"},"facebook_image":{"type":"string"},"twitter_image":{"type":"string"},"canonical":{"type":"string"},"noindex":{"type":"boolean"}},"additionalProperties":false}},"required":false},"locations":{"description":"The locations assigned to the menu.","type":"array","items":{"type":"string"},"required":false},"auto_add":{"description":"Whether to automatically add top level pages to this menu.","type":"boolean","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/wp_pattern_category":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"slim_seo":{"type":"object","title":"","description":"Search Engine Optimization","default":[],"properties":{"title":{"type":"string"},"description":{"type":"string"},"facebook_image":{"type":"string"},"twitter_image":{"type":"string"},"canonical":{"type":"string"},"noindex":{"type":"boolean"}},"additionalProperties":false}},"required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2\/wp_pattern_category"}]}},"\/wp\/v2\/wp_pattern_category\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"slim_seo":{"type":"object","title":"","description":"Search Engine Optimization","default":[],"properties":{"title":{"type":"string"},"description":{"type":"string"},"facebook_image":{"type":"string"},"twitter_image":{"type":"string"},"canonical":{"type":"string"},"noindex":{"type":"boolean"}},"additionalProperties":false}},"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/asset-type":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"slim_seo":{"type":"object","title":"","description":"Search Engine Optimization","default":[],"properties":{"title":{"type":"string"},"description":{"type":"string"},"facebook_image":{"type":"string"},"twitter_image":{"type":"string"},"canonical":{"type":"string"},"noindex":{"type":"boolean"}},"additionalProperties":false}},"required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2\/asset-type"}]}},"\/wp\/v2\/asset-type\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"slim_seo":{"type":"object","title":"","description":"Search Engine Optimization","default":[],"properties":{"title":{"type":"string"},"description":{"type":"string"},"facebook_image":{"type":"string"},"twitter_image":{"type":"string"},"canonical":{"type":"string"},"noindex":{"type":"boolean"}},"additionalProperties":false}},"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/users":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"default":"asc","description":"Order sort attribute ascending or descending.","enum":["asc","desc"],"type":"string","required":false},"orderby":{"default":"name","description":"Sort collection by user attribute.","enum":["id","include","name","registered_date","slug","include_slugs","email","url"],"type":"string","required":false},"slug":{"description":"Limit result set to users with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"roles":{"description":"Limit result set to users matching at least one specific role provided. Accepts csv list or single role.","type":"array","items":{"type":"string"},"required":false},"capabilities":{"description":"Limit result set to users matching at least one specific capability provided. Accepts csv list or single capability.","type":"array","items":{"type":"string"},"required":false},"who":{"description":"Limit result set to users who are considered authors.","type":"string","enum":["authors"],"required":false},"has_published_posts":{"description":"Limit result set to users who have published posts.","type":["boolean","array"],"items":{"type":"string","enum":{"post":"post","page":"page","attachment":"attachment","nav_menu_item":"nav_menu_item","wp_block":"wp_block","wp_template":"wp_template","wp_template_part":"wp_template_part","wp_global_styles":"wp_global_styles","wp_navigation":"wp_navigation","wp_font_family":"wp_font_family","wp_font_face":"wp_font_face","e-floating-buttons":"e-floating-buttons","elementor_library":"elementor_library","elementor_snippet":"elementor_snippet","web-development":"web-development","real-estate-services":"real-estate-services","project-management":"project-management","land-development":"land-development","property":"property","sureforms_form":"sureforms_form"}},"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["email","name","id","username","slug"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"username":{"description":"Login name for the user.","type":"string","required":true},"name":{"description":"Display name for the user.","type":"string","required":false},"first_name":{"description":"First name for the user.","type":"string","required":false},"last_name":{"description":"Last name for the user.","type":"string","required":false},"email":{"description":"The email address for the user.","type":"string","format":"email","required":true},"url":{"description":"URL of the user.","type":"string","format":"uri","required":false},"description":{"description":"Description of the user.","type":"string","required":false},"locale":{"description":"Locale for the user.","type":"string","enum":["","en_US"],"required":false},"nickname":{"description":"The nickname for the user.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the user.","type":"string","required":false},"roles":{"description":"Roles assigned to the user.","type":"array","items":{"type":"string"},"required":false},"password":{"description":"Password for the user (never included).","type":"string","required":true},"meta":{"description":"Meta fields.","type":"object","properties":{"persisted_preferences":{"type":"object","title":"","description":"","default":[],"context":["edit"],"properties":{"_modified":{"description":"The date and time the preferences were updated.","type":"string","format":"date-time","readonly":false}},"additionalProperties":true}},"required":false},"elementor_introduction":{"description":"Elementor user meta data","type":"object","properties":{"ai_get_started":{"type":"boolean"}},"additionalProperties":true,"required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2\/users"}]}},"\/wp\/v2\/users\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the user.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the user.","type":"integer","required":false},"username":{"description":"Login name for the user.","type":"string","required":false},"name":{"description":"Display name for the user.","type":"string","required":false},"first_name":{"description":"First name for the user.","type":"string","required":false},"last_name":{"description":"Last name for the user.","type":"string","required":false},"email":{"description":"The email address for the user.","type":"string","format":"email","required":false},"url":{"description":"URL of the user.","type":"string","format":"uri","required":false},"description":{"description":"Description of the user.","type":"string","required":false},"locale":{"description":"Locale for the user.","type":"string","enum":["","en_US"],"required":false},"nickname":{"description":"The nickname for the user.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the user.","type":"string","required":false},"roles":{"description":"Roles assigned to the user.","type":"array","items":{"type":"string"},"required":false},"password":{"description":"Password for the user (never included).","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"persisted_preferences":{"type":"object","title":"","description":"","default":[],"context":["edit"],"properties":{"_modified":{"description":"The date and time the preferences were updated.","type":"string","format":"date-time","readonly":false}},"additionalProperties":true}},"required":false},"elementor_introduction":{"description":"Elementor user meta data","type":"object","properties":{"ai_get_started":{"type":"boolean"}},"additionalProperties":true,"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the user.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as users do not support trashing.","required":false},"reassign":{"type":"integer","description":"Reassign the deleted user's posts and links to this user ID.","required":true}}}]},"\/wp\/v2\/users\/me":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"username":{"description":"Login name for the user.","type":"string","required":false},"name":{"description":"Display name for the user.","type":"string","required":false},"first_name":{"description":"First name for the user.","type":"string","required":false},"last_name":{"description":"Last name for the user.","type":"string","required":false},"email":{"description":"The email address for the user.","type":"string","format":"email","required":false},"url":{"description":"URL of the user.","type":"string","format":"uri","required":false},"description":{"description":"Description of the user.","type":"string","required":false},"locale":{"description":"Locale for the user.","type":"string","enum":["","en_US"],"required":false},"nickname":{"description":"The nickname for the user.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the user.","type":"string","required":false},"roles":{"description":"Roles assigned to the user.","type":"array","items":{"type":"string"},"required":false},"password":{"description":"Password for the user (never included).","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"persisted_preferences":{"type":"object","title":"","description":"","default":[],"context":["edit"],"properties":{"_modified":{"description":"The date and time the preferences were updated.","type":"string","format":"date-time","readonly":false}},"additionalProperties":true}},"required":false},"elementor_introduction":{"description":"Elementor user meta data","type":"object","properties":{"ai_get_started":{"type":"boolean"}},"additionalProperties":true,"required":false}}},{"methods":["DELETE"],"args":{"force":{"type":"boolean","default":false,"description":"Required to be true, as users do not support trashing.","required":false},"reassign":{"type":"integer","description":"Reassign the deleted user's posts and links to this user ID.","required":true}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2\/users\/me"}]}},"\/wp\/v2\/users\/(?P<user_id>(?:[\\d]+|me))\/application-passwords":{"namespace":"wp\/v2","methods":["GET","POST","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"app_id":{"description":"A UUID provided by the application to uniquely identify it. It is recommended to use an UUID v5 with the URL or DNS namespace.","type":"string","oneOf":[{"type":"string","format":"uuid"},{"type":"string","enum":[""]}],"required":false},"name":{"description":"The name of the application password.","type":"string","minLength":1,"pattern":".*\\S.*","required":true}}},{"methods":["DELETE"],"args":[]}]},"\/wp\/v2\/users\/(?P<user_id>(?:[\\d]+|me))\/application-passwords\/introspect":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/users\/(?P<user_id>(?:[\\d]+|me))\/application-passwords\/(?P<uuid>[\\w\\-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"app_id":{"description":"A UUID provided by the application to uniquely identify it. It is recommended to use an UUID v5 with the URL or DNS namespace.","type":"string","oneOf":[{"type":"string","format":"uuid"},{"type":"string","enum":[""]}],"required":false},"name":{"description":"The name of the application password.","type":"string","minLength":1,"pattern":".*\\S.*","required":false}}},{"methods":["DELETE"],"args":[]}]},"\/wp\/v2\/comments":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to comments published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to comments assigned to specific user IDs. Requires authorization.","type":"array","items":{"type":"integer"},"required":false},"author_exclude":{"description":"Ensure result set excludes comments assigned to specific user IDs. Requires authorization.","type":"array","items":{"type":"integer"},"required":false},"author_email":{"default":null,"description":"Limit result set to that from a specific author email. Requires authorization.","format":"email","type":"string","required":false},"before":{"description":"Limit response to comments published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by comment attribute.","type":"string","default":"date_gmt","enum":["date","date_gmt","id","include","post","parent","type"],"required":false},"parent":{"default":[],"description":"Limit result set to comments of specific parent IDs.","type":"array","items":{"type":"integer"},"required":false},"parent_exclude":{"default":[],"description":"Ensure result set excludes specific parent IDs.","type":"array","items":{"type":"integer"},"required":false},"post":{"default":[],"description":"Limit result set to comments assigned to specific post IDs.","type":"array","items":{"type":"integer"},"required":false},"status":{"default":"approve","description":"Limit result set to comments assigned a specific status. Requires authorization.","type":"string","required":false},"type":{"default":"comment","description":"Limit result set to comments assigned a specific type. Requires authorization.","type":"string","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST"],"args":{"author":{"description":"The ID of the user object, if author was a user.","type":"integer","required":false},"author_email":{"description":"Email address for the comment author.","type":"string","format":"email","required":false},"author_ip":{"description":"IP address for the comment author.","type":"string","format":"ip","required":false},"author_name":{"description":"Display name for the comment author.","type":"string","required":false},"author_url":{"description":"URL for the comment author.","type":"string","format":"uri","required":false},"author_user_agent":{"description":"User agent for the comment author.","type":"string","required":false},"content":{"description":"The content for the comment.","type":"object","properties":{"raw":{"description":"Content for the comment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the comment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"date":{"description":"The date the comment was published, in the site's timezone.","type":"string","format":"date-time","required":false},"date_gmt":{"description":"The date the comment was published, as GMT.","type":"string","format":"date-time","required":false},"parent":{"default":0,"description":"The ID for the parent of the comment.","type":"integer","required":false},"post":{"default":0,"description":"The ID of the associated post object.","type":"integer","required":false},"status":{"description":"State of the comment.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_wp_note_status":{"type":"string","title":"","description":"Note resolution status","default":"","enum":["resolved","reopen"]}},"required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2\/comments"}]}},"\/wp\/v2\/comments\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the comment.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the parent post of the comment (if the post is password protected).","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the comment.","type":"integer","required":false},"author":{"description":"The ID of the user object, if author was a user.","type":"integer","required":false},"author_email":{"description":"Email address for the comment author.","type":"string","format":"email","required":false},"author_ip":{"description":"IP address for the comment author.","type":"string","format":"ip","required":false},"author_name":{"description":"Display name for the comment author.","type":"string","required":false},"author_url":{"description":"URL for the comment author.","type":"string","format":"uri","required":false},"author_user_agent":{"description":"User agent for the comment author.","type":"string","required":false},"content":{"description":"The content for the comment.","type":"object","properties":{"raw":{"description":"Content for the comment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the comment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"date":{"description":"The date the comment was published, in the site's timezone.","type":"string","format":"date-time","required":false},"date_gmt":{"description":"The date the comment was published, as GMT.","type":"string","format":"date-time","required":false},"parent":{"description":"The ID for the parent of the comment.","type":"integer","required":false},"post":{"description":"The ID of the associated post object.","type":"integer","required":false},"status":{"description":"State of the comment.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_wp_note_status":{"type":"string","title":"","description":"Note resolution status","default":"","enum":["resolved","reopen"]}},"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the comment.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"password":{"description":"The password for the parent post of the comment (if the post is password protected).","type":"string","required":false}}}]},"\/wp\/v2\/search":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"type":{"default":"post","description":"Limit results to items of an object type.","type":"string","enum":["post","term","post-format"],"required":false},"subtype":{"default":"any","description":"Limit results to items of one or more object subtypes.","type":"array","items":{"enum":["post","page","e-floating-buttons","elementor_library","web-development","real-estate-services","project-management","land-development","property","sureforms_form","category","post_tag","asset-type","any"],"type":"string"},"required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2\/search"}]}},"\/wp\/v2\/block-renderer\/(?P<name>[a-z0-9-]+\/[a-z0-9-]+)":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET","POST"],"args":{"name":{"description":"Unique registered name for the block.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["edit"],"default":"view","required":false},"attributes":{"description":"Attributes for the block.","type":"object","default":[],"required":false},"post_id":{"description":"ID of the post context.","type":"integer","required":false}}}]},"\/wp\/v2\/block-types":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"namespace":{"description":"Block namespace.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2\/block-types"}]}},"\/wp\/v2\/block-types\/(?P<namespace>[a-zA-Z0-9_-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"namespace":{"description":"Block namespace.","type":"string","required":false}}}]},"\/wp\/v2\/block-types\/(?P<namespace>[a-zA-Z0-9_-]+)\/(?P<name>[a-zA-Z0-9_-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"description":"Block name.","type":"string","required":false},"namespace":{"description":"Block namespace.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/settings":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"hello_elementor_settings_description_meta_tag":{"title":"","description":"","type":"string","required":false},"hello_elementor_settings_skip_link":{"title":"","description":"","type":"string","required":false},"hello_elementor_settings_header_footer":{"title":"","description":"","type":"string","required":false},"hello_elementor_settings_page_title":{"title":"","description":"","type":"string","required":false},"hello_elementor_settings_hello_style":{"title":"","description":"","type":"string","required":false},"hello_elementor_settings_hello_theme":{"title":"","description":"","type":"string","required":false},"title":{"title":"Title","description":"Site title.","type":"string","required":false},"description":{"title":"Tagline","description":"Site tagline.","type":"string","required":false},"url":{"title":"","description":"Site URL.","type":"string","format":"uri","required":false},"email":{"title":"","description":"This address is used for admin purposes, like new user notification.","type":"string","format":"email","required":false},"timezone":{"title":"","description":"A city in the same timezone as you.","type":"string","required":false},"date_format":{"title":"","description":"A date format for all date strings.","type":"string","required":false},"time_format":{"title":"","description":"A time format for all time strings.","type":"string","required":false},"start_of_week":{"title":"","description":"A day number of the week that the week should start on.","type":"integer","required":false},"language":{"title":"","description":"WordPress locale code.","type":"string","required":false},"use_smilies":{"title":"","description":"Convert emoticons like :-) and :-P to graphics on display.","type":"boolean","required":false},"default_category":{"title":"","description":"Default post category.","type":"integer","required":false},"default_post_format":{"title":"","description":"Default post format.","type":"string","required":false},"posts_per_page":{"title":"Maximum posts per page","description":"Blog pages show at most.","type":"integer","required":false},"show_on_front":{"title":"Show on front","description":"What to show on the front page","type":"string","required":false},"page_on_front":{"title":"Page on front","description":"The ID of the page that should be displayed on the front page","type":"integer","required":false},"page_for_posts":{"title":"","description":"The ID of the page that should display the latest posts","type":"integer","required":false},"default_ping_status":{"title":"","description":"Allow link notifications from other blogs (pingbacks and trackbacks) on new articles.","type":"string","enum":["open","closed"],"required":false},"default_comment_status":{"title":"Allow comments on new posts","description":"Allow people to submit comments on new posts.","type":"string","enum":["open","closed"],"required":false},"site_logo":{"title":"Logo","description":"Site logo.","type":"integer","required":false},"site_icon":{"title":"Icon","description":"Site icon.","type":"integer","required":false},"elementor_one_welcome_screen_completed":{"title":"","description":"Elementor One Welcome Screen Completed","type":"boolean","required":false},"elementor_one_dismiss_connect_alert":{"title":"","description":"Elementor One Dismiss Connect Alert","type":"boolean","required":false},"elementor_one_editor_update_notification_dismissed":{"title":"","description":"Elementor One Dismiss Editor Update Notification","type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2\/settings"}]}},"\/wp\/v2\/themes":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"status":{"description":"Limit result set to themes assigned one or more statuses.","type":"array","items":{"enum":["active","inactive"],"type":"string"},"required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2\/themes"}]}},"\/wp\/v2\/themes\/(?P<stylesheet>[^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"stylesheet":{"description":"The theme's stylesheet. This uniquely identifies the theme.","type":"string","required":false}}}]},"\/wp\/v2\/plugins":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"status":{"description":"Limits results to plugins with the given status.","type":"array","items":{"type":"string","enum":["inactive","active"]},"required":false}}},{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org plugin directory slug.","pattern":"[\\w\\-]+","required":true},"status":{"description":"The plugin activation status.","type":"string","enum":["inactive","active"],"default":"inactive","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2\/plugins"}]}},"\/wp\/v2\/plugins\/(?P<plugin>[^.\\\/]+(?:\\\/[^.\\\/]+)?)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"plugin":{"type":"string","pattern":"[^.\\\/]+(?:\\\/[^.\\\/]+)?","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"plugin":{"type":"string","pattern":"[^.\\\/]+(?:\\\/[^.\\\/]+)?","required":false},"status":{"description":"The plugin activation status.","type":"string","enum":["inactive","active"],"required":false}}},{"methods":["DELETE"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"plugin":{"type":"string","pattern":"[^.\\\/]+(?:\\\/[^.\\\/]+)?","required":false}}}]},"\/wp\/v2\/sidebars":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2\/sidebars"}]}},"\/wp\/v2\/sidebars\/(?P<id>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a registered sidebar","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"widgets":{"description":"Nested widgets.","type":"array","items":{"type":["object","string"]},"required":false}}}]},"\/wp\/v2\/widget-types":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2\/widget-types"}]}},"\/wp\/v2\/widget-types\/(?P<id>[a-zA-Z0-9_-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The widget type id.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/widget-types\/(?P<id>[a-zA-Z0-9_-]+)\/encode":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"The widget type id.","type":"string","required":true},"instance":{"description":"Current instance settings of the widget.","type":"object","required":false},"form_data":{"description":"Serialized widget form data to encode into instance settings.","type":"string","required":false}}}]},"\/wp\/v2\/widget-types\/(?P<id>[a-zA-Z0-9_-]+)\/render":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"The widget type id.","type":"string","required":true},"instance":{"description":"Current instance settings of the widget.","type":"object","required":false}}}]},"\/wp\/v2\/widgets":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"sidebar":{"description":"The sidebar to return widgets for.","type":"string","required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the widget.","type":"string","required":false},"id_base":{"description":"The type of the widget. Corresponds to ID in widget-types endpoint.","type":"string","required":false},"sidebar":{"default":"wp_inactive_widgets","description":"The sidebar the widget belongs to.","type":"string","required":true},"instance":{"description":"Instance settings of the widget, if supported.","type":"object","properties":{"encoded":{"description":"Base64 encoded representation of the instance settings.","type":"string","context":["edit"]},"hash":{"description":"Cryptographic hash of the instance settings.","type":"string","context":["edit"]},"raw":{"description":"Unencoded instance settings, if supported.","type":"object","context":["edit"]}},"required":false},"form_data":{"description":"URL-encoded form data from the widget admin form. Used to update a widget that does not support instance. Write only.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2\/widgets"}]}},"\/wp\/v2\/widgets\/(?P<id>[\\w\\-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the widget.","type":"string","required":false},"id_base":{"description":"The type of the widget. Corresponds to ID in widget-types endpoint.","type":"string","required":false},"sidebar":{"description":"The sidebar the widget belongs to.","type":"string","required":false},"instance":{"description":"Instance settings of the widget, if supported.","type":"object","properties":{"encoded":{"description":"Base64 encoded representation of the instance settings.","type":"string","context":["edit"]},"hash":{"description":"Cryptographic hash of the instance settings.","type":"string","context":["edit"]},"raw":{"description":"Unencoded instance settings, if supported.","type":"object","context":["edit"]}},"required":false},"form_data":{"description":"URL-encoded form data from the widget admin form. Used to update a widget that does not support instance. Write only.","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"force":{"description":"Whether to force removal of the widget, or move it to the inactive sidebar.","type":"boolean","required":false}}}]},"\/wp\/v2\/block-directory\/search":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"term":{"description":"Limit result set to blocks matching the search term.","type":"string","minLength":1,"required":true}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2\/block-directory\/search"}]}},"\/wp\/v2\/pattern-directory\/patterns":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":100,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","minLength":1,"required":false},"category":{"description":"Limit results to those matching a category ID.","type":"integer","minimum":1,"required":false},"keyword":{"description":"Limit results to those matching a keyword ID.","type":"integer","minimum":1,"required":false},"slug":{"description":"Limit results to those matching a pattern (slug).","type":"array","required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","favorite_count"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2\/pattern-directory\/patterns"}]}},"\/wp\/v2\/block-patterns\/patterns":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2\/block-patterns\/patterns"}]}},"\/wp\/v2\/block-patterns\/categories":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2\/block-patterns\/categories"}]}},"\/wp-site-health\/v1":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp-site-health\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp-site-health\/v1"}]}},"\/wp-site-health\/v1\/tests\/background-updates":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp-site-health\/v1\/tests\/background-updates"}]}},"\/wp-site-health\/v1\/tests\/loopback-requests":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp-site-health\/v1\/tests\/loopback-requests"}]}},"\/wp-site-health\/v1\/tests\/https-status":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp-site-health\/v1\/tests\/https-status"}]}},"\/wp-site-health\/v1\/tests\/dotorg-communication":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp-site-health\/v1\/tests\/dotorg-communication"}]}},"\/wp-site-health\/v1\/tests\/authorization-header":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp-site-health\/v1\/tests\/authorization-header"}]}},"\/wp-site-health\/v1\/directory-sizes":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp-site-health\/v1\/directory-sizes"}]}},"\/wp-site-health\/v1\/tests\/page-cache":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp-site-health\/v1\/tests\/page-cache"}]}},"\/wp-block-editor\/v1":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp-block-editor\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp-block-editor\/v1"}]}},"\/wp-block-editor\/v1\/url-details":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"description":"The URL to process.","type":"string","format":"uri","required":true}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp-block-editor\/v1\/url-details"}]}},"\/wp\/v2\/menu-locations":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2\/menu-locations"}]}},"\/wp\/v2\/menu-locations\/(?P<location>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"location":{"description":"An alphanumeric identifier for the menu location.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp-block-editor\/v1\/export":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp-block-editor\/v1\/export"}]}},"\/wp-block-editor\/v1\/navigation-fallback":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp-block-editor\/v1\/navigation-fallback"}]}},"\/wp\/v2\/font-collections":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2\/font-collections"}]}},"\/wp\/v2\/font-collections\/(?P<slug>[\\\/\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp-abilities\/v1":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp-abilities\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp-abilities\/v1"}]}},"\/wp-abilities\/v1\/categories":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":50,"minimum":1,"maximum":100,"required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp-abilities\/v1\/categories"}]}},"\/wp-abilities\/v1\/categories\/(?P<slug>[a-z0-9]+(?:-[a-z0-9]+)*)":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"description":"Unique identifier for the ability category.","type":"string","pattern":"^[a-z0-9]+(?:-[a-z0-9]+)*$","required":false}}}]},"\/wp-abilities\/v1\/abilities\/(?P<name>[a-zA-Z0-9\\-\\\/]+?)\/run":{"namespace":"wp-abilities\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET","POST","PUT","PATCH","DELETE"],"args":{"name":{"description":"Unique identifier for the ability.","type":"string","pattern":"^[a-zA-Z0-9\\-\\\/]+$","required":false},"input":{"description":"Input parameters for the ability execution.","type":["integer","number","boolean","string","array","object","null"],"default":null,"required":false}}}]},"\/wp-abilities\/v1\/abilities":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":50,"minimum":1,"maximum":100,"required":false},"category":{"description":"Limit results to abilities in specific ability category.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/borisartiga.com\/wp-json\/wp-abilities\/v1\/abilities"}]}},"\/wp-abilities\/v1\/abilities\/(?P<name>[a-zA-Z0-9\\-\\\/]+)":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"description":"Unique identifier for the ability.","type":"string","pattern":"^[a-zA-Z0-9\\-\\\/]+$","required":false}}}]}},"site_logo":161,"site_icon":3528,"site_icon_url":"https:\/\/borisartiga.com\/wp-content\/uploads\/2024\/08\/boris-artiga-favicon-navy-blue.jpg","_links":{"help":[{"href":"https:\/\/developer.wordpress.org\/rest-api\/"}],"wp:featuredmedia":[{"embeddable":true,"type":"site_logo","href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2\/media\/161"},{"embeddable":true,"type":"site_icon","href":"https:\/\/borisartiga.com\/wp-json\/wp\/v2\/media\/3528"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}